We would expect to see which of the following in an MRP system's inventory status file?
•
Labor efficiency
•
End items produced
•
Late/early delivery records
•
Scrap parts
2
A project starts out as which of the following?
•
Critical path method (CPM)
•
A statement of work
•
A latest-start-time estimate
•
A series of milestones
3
In setting up a kanban control system you need to determine the number of kanban card sets needed. If
the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand
during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the
number of kanban card sets is needed?
•
30
•
, 20
•
5
•
27
4
Which of the following is a multifactor measure of productivity?
•
Output/(Labor + Capital + Energy)
•
Output/Inputs
•
Output/All resources used
•
Output/(Materials)
5
Assuming no safety stock, what is the reorder point (R) given an average daily demand of 78 units and a
lead time of 3 days?
•
78
•
234
•
26
•
421
6
A major competitive dimension that forms a company's strategic operational competitive position in their
strategic planning is which of the following?
•
Focus
•