You are the PCO for a major competitive negotiated source selection. The RFP, which reflects the user's requirements and is based on the user's budget, has a requirement for 220 cargo loaders to be delivered at 55 per year over the next four years. One offeror proposes to deliver all 220 loaders in the first year at a dramatically reduced price. Can you accept the offeror's proposal? What factors should you consider in your decision? You can accept the offeror's proposal under certain circumstances. Firstly, what did the RFP say about alternate proposals? Is this a situation where requirements are changed and the other offerors should be allowed to propose on the basis of the changed requirements? You need to ask the user if he wants all 220 in the first year and are the operating locations physically able to accommodate their loaders in the first year. Finally, the offeror could be taken into discussions and asked to conform to the RFP with there being the possibility of not being selected for award or elimination from the competitive range if the proposal is not made compliant with the RFP. You are the PCO on a new $2B aircraft development program. The program is in contract negotiations for a Fixed Price Incentive (Firm Target) System Development and Demonstration contract award to a sole source contractor. The program director, a fast-burning young colonel, e-mails you that she is very concerned with the aircraft's ultimate speed at the full specification payload. She would like the contractor to achieve the faster, desired objective speed rather than the mandatory threshold speed, and thinks that an objective performance incentive would be the way to go to achieve her goal. You are asked to go to her office and discuss the matter and the issues involved in using such an incentive. What do you tell the colonel? There are a number of considerations for the colonel: The desired additional speed should provide benefit to the Air Force in order to justify the expenditure of funds to achieve it. The colonel should be able to articulate the justification. The situation is very amenable to a classic performance incentive that would allow the contractor to earn profit for achieving the desired speed above and beyond what the final FPIF profit would be for achieving threshold speed. If the contractor perceives this can't happen, he will either not sign up to the incentive or will ignore it from Day One. The incentive and resulting payment have to be structured so as to be based on observable, measurable results that would determine how much is earned by the contractor. Subjectivity is not allowable under current AF policy without HCA approval. We have to be very careful to understand what possible unintended consequences could be caused by the existence of this feature in the contract. For example, will the contractor reduce aircraft weight beyond safe limits in order to help achieve the payment? Also, will the contractor consume excessive schedule to get the extra speed? There has to be a cost incentive in place so that the contractor doesn't spend an unconstrained amount of money to win the payment, such as under a CPFF contract. The FPIF share line serves this purpose when balanced against the incentive. The incentive has to be balanced with the FPIF share line so that the contractor doesn't spend more money to achieve the desired speed than he has potential to earn by receiving the payment. Similarly, the contractor can't be allowed to spend an excessive amount of money with little cost penalty to achieve success. 00:03 01:14 : In AFRL, Contracting Officers are also Grants Officers. They can award Grants and Assistance Instruments as well as contracts. What is Assistance? How does it differ from Acquisition? What gives the Grants Officers their authority to enter into assistance? What are the types of Assistance? When the principal purpose is to transfer a thing of value, to carry out a public purpose of support or stimulation authorized by law of the United States, it is Assistance. Acquisition, by contrast, has the principal purpose of acquiring property or services for the direct benefit or use of the United States Government. Federal agencies must be authorized by statute to support or stimulate a public purpose. The statutory authority from Congress must exist either in broad legislation or in a program-specific statute. Absent that statutory authority, a Grants Officer may not use an assistance instrument. Authorities to issue Assistance can be of three types: (1) Provide to the Secretary of Defense by statute, e.g., 10 U.S.C. 2391; (2) Authority provided to DoD components that requires no delegation by the Secretary of Defense, e.g., 10 U.S.C. 2358; (3) Authority coming indirectly from statutes, i.e., federal statute authorizing a program that is consistent with using a grant or cooperative agreement. Two types of Assistance are Grants and Cooperative Agreements. They differ in the following way: In a Grant, substantial involvement is not expected between the agency and the recipient. In Cooperative Agreement, substantial involvement is expected between the agency and the recipient. Cooperative Agreements, then, are particularly useful in the research arena when the Government is interested in being involved in program decisions or may be doing some testing or research themselves. You are the Contracting Officer for a well established transport aircraft program. The program is nearing the end of production. A Program Manager approaches you requesting that you issue a Broad Area Announcement (BAA) to support the development of a source list to supply active noise reducing headsets. The headsets are commercially available from multiple sources and the PM wants to receive performance specification sheets from each offeror and then request sample headsets be submitted for testing. The end result of the effort will be the development of a source list that can be used by various Air Force Bases to individually procure the needed headsets for the Base's specific requirements. The PM tells you that he will not be procuring any of the headsets as a result of the BAA. What do you advise the PM? You should advise the PM that BAAs are a method of solicitation and can only be used if the Government intends to award a contract. You might suggest that the development of the source list could be achieved by issuing a Sources Sought Synopsis with the synopsis specifying the 2 step process (spec sheets first and then sample headsets from selected offerors), and the ultimate intent of the process, e.g., a source list for use by individual users in future procurements. You might also advise the PM that there could be liability issues associated with the use, handling, and return of the headsets to the offerors and that it might be appropriate for the Government to cover shipping and any damage/wear to the units for the testing. You are the Contracting Officer on a new Research and Development program. Proposals were recently received in response to a Broad Agency Announcement, and a Cost Plus Fixed Fee contract type is anticipated. The proposal most favored by the technical team was priced significantly under what was estimated for the effort. The contractor proposed fee in an amount that equates to 20% of the estimated cost. The users have more than enough funds to cover the proposal and want you to accept the price as is. How should you advise the user and what factors should you consider in determining a reasonable fee? The statutory limitation on fee for CPFF type contracts do no permit exceeding 15% of estimated cost for experimental, developmental, or research performed under a CPFF contract. Since the proposed amount of fee is outside the statutory limitations you need to determine what a fair and reasonable rate is that falls within the limitations. The FAR recommends a structured approach for determining fee such as Weighted Guidelines. If a cost reasonableness review determines the estimated costs to be acceptable, we can still negotiate and adjust the fee. A. Under what circumstances is ratification of an unauthorized commitment permitted? B. In general, what are the generic procedures for handling ratification actions? C. Who are the approval authorities for ratifications? A. If the contract award would have been proper if executed by a warranted PCO, the price can be determined to be fair and reasonable, and there must have been enough of the proper type of funding available to pay for the item both at the time of the commitment and at the time of the ratification. B. An investigation is required to be completed within 30 days of discovery of the unauthorized commitment explaining how and why it occurred, how future occurrences will be avoided, and describing any corrective actions taken against responsible individuals. Legal review is also required. C. HCA for actions of $30K or more and COCO for actions under $30K You are the Contracting Officer for a much-delayed effort. On Friday you finally receive the necessary authority to release the contract for signature. It's late on Friday afternoon when you e-mail the modification to the contractor for signature. The only person at the contractor's office on Friday afternoon is the Company President's 17 year old daughter who is working there as a summer-hire secretary. She knows her father urgently wants the contract modification so she signs the document and returns it to your office. You note the last name is the same as the President's so assume that he's the one who signed the modification. Is this a legal agreement? legal/question 010 Probably not. The elements of a contract are - offer, acceptance, consideration, for a lawful purpose, certainty of terms, and legal capacity. It is unlikely that a 17 year old summer hire would have the authority to bind the company, regardless of her relationship to the Company President. Courts may generally find that individuals lack "the age majority" if they are under 18 years of age. The law in a given jurisdiction may never actually use the term "age of majority" and the term thereby refers to a collection of laws bestowing the status of adulthood. The age of majority is a legally fixed age, concept, or statutory principle, which may differ depending on the jurisdiction, and may not necessarily correspond to actual mental or physical maturity of an individual. In practical terms, there are certain specific actions which a person who attains the age of majority is permitted to take, which they could not do before. These may include entering into a binding contract, buying stocks, voting, buying and/or consuming alcoholic beverages, driving motor vehicles on public roads, and marrying without obtaining consent of others. The ages at which these various rights or powers may be exercised vary as between the various rights and as between different jurisdictions. For example, the ages at which a person may obtain a license to drive a car or consume alcoholic beverages vary considerably between and also within jurisdictions. You are the Contracting Officer for a follow-on buy source selection. The current effort has had the same Program Manager for over 10 years. She began as the PM while still a Military Officer and then retired and was re-hired as an A&AS employee to continue to manage the program. She has extensive experience on the program and is considered a Primary "Go To" person for all Program-related managerial issues. The Program Director wants to utilize the PM's experience to the fullest extent possible and has proposed that the PM be listed as chief of the technical evaluation team and also a voting member of the source selection board. Is it permissible to have a non-Government employee (A&AS contractor) as chief of the technical evaluation team and a voting member of the source selection board? Acq plan/question 014 It is not permissible to have a non-Government employee as a voting member of any source selection board. FAR 7.503(c)(12)(ii). FAR policy states that contracts shall not be used for the performance of inherently governmental functions. OMB may review Agency decisions to determine whether a function is or is not an inherently governmental function, but a list of examples is in FAR 7.503(c). They include: control of criminal investigations or prosecutions, command of military forces, determination of agency policy and application of regulations, determining budget priorities, and direction and control of federal employees. Specifically, included in this list are determining what supplies or services shall be acquired by the Government on a prime contract and being a voting member of any source selection boards You have a contract for engineering services with a basic period of performance and several one year options for continued performance. The contract states that all options must be exercised by 1 October of each year. The basic period of performance has just expired and on 5 October you realize that you never exercised the option for continued performance. There is still an immediate need for the services. How would you try to rectify this situation? Once the option has expired there is no contract. You may have to prepare a J&A (depending on your original authorizations) and enter into a bilateral agreement with the contractor to obtain continued performance by the same contractor. The contractor is entitled to renegotiate the price. The end of the fiscal year 10 is coming up and you get a phone call from HQ telling you that several million dollars just became available - they don't want the money to go to waste and want to give it to you to support your requirements. Your Program Director urges you to use the money to buy spare parts for his aircraft which have been operating 24/7 since "the war" began. The Program Director has estimated the funds will by enough replenishment spares for the remainder of the war. Do you have any concerns? You have two major concerns. First, you have to ask HQ the color of money and year of the funds they want to send you. Do not assume that they are sending you FY10 O&M funds. If they are sending you FY10 O&M funds you can use the funds for "operations and maintenance' but you will have to obligate the money before the end of the fiscal year closes out. Once you have determined the kind and year of money, you can address the Program Director's request. Since the Program Director is asking you to buy replenishment spares, you can use the money to buy these spares assuming the Program Director can show you a bona fide need for the spares. This means you can buy sufficient spares for a current need (which includes a reasonable inventory) but you cannot stockpile. Even if the contractor cannot deliver the spares in FY10, you still have a bona fide need of FY10 if the contractor can deliver the spares in a "reasonable" time. Here the Program Director appears to want you to buy spares sufficient to satisfy his needs for the entire war, a sure indication of his intent to stockpile. You will have to go back to the program director to find out the spares he can actually put on an aircraft right now plus find out what a reasonable inventory is for his program. You cannot use current O&M funds to satisfy a "future" need since that violates the bona fide needs rule. Please define a Certificate of Current Cost or Pricing Data and its purpose. What are some of the key things you would expect to see or review before accepting the certificate? There are several exceptions to obtaining a Certificate - please list some of them. The definition is as follows: A Certificate of Current Cost or Pricing Data certifies that to the best of the company's knowledge, the cost or pricing data submitted were accurate, complete, and current as of the date of agreement on price or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price. The purpose is to have the company commit as to the accuracy, completeness, and currency of submitted data. If the data is later found to be incorrect or appropriate data was not submitted, the government reserves the right to a downward contract price adjustment for any monetary damages incurred. Key things we would expect to see or review in a Certificate are: The certificate is in the format shown in FAR 15.406-2 Current as of the date of agreement on price or an earlier agreed upon date Signed by an authorized representative of the company and dated as close as practicable to the date when price negotiations were concluded Check for qualifications or new information disclosed by the sweep and evaluate its impact on the negotiated price Exceptions: Adequate Price Competition Prices set by law or regulation Commercial Item Waiver has been granted Modifying a contract or subcontract for commercial items What is the requirement for obligating funds when awarding indefinite-quantity contracts? (1) For indefinite-delivery indefinite-quantity (IDIQ) contracts all supplies and services to be furnished shall be obtained via delivery orders(s) or task order(s) issued by individuals designated in the contract. (2) Upon execution of the contract, an obligation shall be recorded based upon the issuance of a delivery or task order for the cost/price of the minimum quantity specified. Obtaining a certification of availability of funding from the finance office does not satisfy the requirement to record an obligation in the official accounting records of the Government for the minimum order amount established by the award of an IDIQ contract. The Government's actual obligation must be recorded at the time of contract award. Recording and subsequently reporting the required obligation using anything other than a delivery or task order will result in the action not being reported in FPDS-NG. the Recording of Obligations Act is implemented in the DoD Financial Management Regulation (FMR) (DoD 7000.14-R - see paragraph of the FMR). The Defense Finance and Accounting Service (DFAS) is responsible for recording contractual obligations in the Air Force accounting records.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Contracting Officer warrant board
questions 2
You are the PCO for a major competitive negotiated source selection. The RFP, which
reflects the user's requirements and is based on the user's budget, has a requirement
for 220 cargo loaders to be delivered at 55 per year over the next four years. One
offeror proposes to deliver all 220 loaders in the first year at a dramatically reduced
price. Can you accept the offeror's proposal? What factors should you consider in your
decision? - Answer You can accept the offeror's proposal under certain circumstances.
Firstly, what did the RFP say about alternate proposals? Is this a situation where
requirements are changed and the other offerors should be allowed to propose on the
basis of the changed requirements? You need to ask the user if he wants all 220 in the
first year and are the operating locations physically able to accommodate their loaders
in the first year. Finally, the offeror could be taken into discussions and asked to
conform to the RFP with there being the possibility of not being selected for award or
elimination from the competitive range if the proposal is not made compliant with the
RFP.

You are the PCO on a new $2B aircraft development program. The program is in
contract negotiations for a Fixed Price Incentive (Firm Target) System Development and
Demonstration contract award to a sole source contractor. The program director, a fast-
burning young colonel, e-mails you that she is very concerned with the aircraft's ultimate
speed at the full specification payload. She would like the contractor to achieve the
faster, desired objective speed rather than the mandatory threshold speed, and thinks
that an objective performance incentive would be the way to go to achieve her goal. You
are asked to go to her office and discuss the matter and the issues involved in using
such an incentive. What do you tell the colonel? - Answer There are a number of
considerations for the colonel:
The desired additional speed should provide benefit to the Air Force in order to justify
the expenditure of funds to achieve it. The colonel should be able to articulate the
justification.
The situation is very amenable to a classic performance incentive that would allow the
contractor to earn profit for achieving the desired speed above and beyond what the
final FPIF profit would be for achieving threshold speed. If the contractor perceives this
can't happen, he will either not sign up to the incentive or will ignore it from Day One.
The incentive and resulting payment have to be structured so as to be based on
observable, measurable results that would determine how much is earned by the
contractor. Subjectivity is not allowable under current AF policy without HCA approval.
We have to be very careful to understand what possible unintended consequences
could be caused by the existence of this feature in the contract. For example, will the
contractor reduce aircraft weight beyond safe limits in order to help achieve the
payment? Also, will the contractor consume excessive schedule to get the extra speed?

,There has to be a cost incentive in place so that the contractor doesn't spend an
unconstrained amount of money to win the payment, such as under a CPFF contract.
The FPIF share line serves this purpose when balanced against the incentive.
The incentive has to be balanced with the FPIF share line so that the contractor doesn't
spend more money to achieve the desired speed than he has potential to earn by
receiving the payment. Similarly, the contractor can't be allowed to spend an excessive
amount of money with little cost penalty to achieve success.

: In AFRL, Contracting Officers are also Grants Officers. They can award Grants and
Assistance Instruments as well as contracts. What is Assistance? How does it differ
from Acquisition? What gives the Grants Officers their authority to enter into
assistance? What are the types of Assistance? - Answer When the principal purpose is
to transfer a thing of value, to carry out a public purpose of support or stimulation
authorized by law of the United States, it is Assistance.
Acquisition, by contrast, has the principal purpose of acquiring property or services for
the direct benefit or use of the United States Government.
Federal agencies must be authorized by statute to support or stimulate a public
purpose. The statutory authority from Congress must exist either in broad legislation or
in a program-specific statute. Absent that statutory authority, a Grants Officer may not
use an assistance instrument.
Authorities to issue Assistance can be of three types: (1) Provide to the Secretary of
Defense by statute, e.g., 10 U.S.C. 2391; (2) Authority provided to DoD components
that requires no delegation by the Secretary of Defense, e.g., 10 U.S.C. 2358; (3)
Authority coming indirectly from statutes, i.e., federal statute authorizing a program that
is consistent with using a grant or cooperative agreement.
Two types of Assistance are Grants and Cooperative Agreements. They differ in the
following way: In a Grant, substantial involvement is not expected between the agency
and the recipient. In Cooperative Agreement, substantial involvement is expected
between the agency and the recipient. Cooperative Agreements, then, are particularly
useful in the research arena when the Government is interested in being involved in
program decisions or may be doing some testing or research themselves.

You are the Contracting Officer for a well established transport aircraft program. The
program is nearing the end of production. A Program Manager approaches you
requesting that you issue a Broad Area Announcement (BAA) to support the
development of a source list to supply active noise reducing headsets. The headsets
are commercially available from multiple sources and the PM wants to receive
performance specification sheets from each offeror and then request sample headsets
be submitted for testing. The end result of the effort will be the development of a source
list that can be used by various Air Force Bases to individually procure the needed
headsets for the Base's specific requirements. The PM tells you that he will not be
procuring any of the headsets as a result of the BAA. What do you advise the PM? -
Answer You should advise the PM that BAAs are a method of solicitation and can only
be used if the Government intends to award a contract. You might suggest that the
development of the source list could be achieved by issuing a Sources Sought Synopsis
with the synopsis specifying the 2 step process (spec sheets first and then sample

,headsets from selected offerors), and the ultimate intent of the process, e.g., a source
list for use by individual users in future procurements. You might also advise the PM
that there could be liability issues associated with the use, handling, and return of the
headsets to the offerors and that it might be appropriate for the Government to cover
shipping and any damage/wear to the units for the testing.

You are the Contracting Officer on a new Research and Development program.
Proposals were recently received in response to a Broad Agency Announcement, and a
Cost Plus Fixed Fee contract type is anticipated. The proposal most favored by the
technical team was priced significantly under what was estimated for the effort. The
contractor proposed fee in an amount that equates to 20% of the estimated cost. The
users have more than enough funds to cover the proposal and want you to accept the
price as is. How should you advise the user and what factors should you consider in
determining a reasonable fee? - Answer The statutory limitation on fee for CPFF type
contracts do no permit exceeding 15% of estimated cost for experimental,
developmental, or research performed under a CPFF contract. Since the proposed
amount of fee is outside the statutory limitations you need to determine what a fair and
reasonable rate is that falls within the limitations. The FAR recommends a structured
approach for determining fee such as Weighted Guidelines. If a cost reasonableness
review determines the estimated costs to be acceptable, we can still negotiate and
adjust the fee.

A. Under what circumstances is ratification of an unauthorized commitment permitted?
B. In general, what are the generic procedures for handling ratification actions?
C. Who are the approval authorities for ratifications? - Answer A. If the contract award
would have been proper if executed by a warranted PCO, the price can be determined
to be fair and reasonable, and there must have been enough of the proper type of
funding available to pay for the item both at the time of the commitment and at the time
of the ratification.
B. An investigation is required to be completed within 30 days of discovery of the
unauthorized commitment explaining how and why it occurred, how future occurrences
will be avoided, and describing any corrective actions taken against responsible
individuals. Legal review is also required.
C. HCA for actions of $30K or more and COCO for actions under $30K

You are the Contracting Officer for a much-delayed effort. On Friday you finally receive
the necessary authority to release the contract for signature. It's late on Friday afternoon
when you e-mail the modification to the contractor for signature. The only person at the
contractor's office on Friday afternoon is the Company President's 17 year old daughter
who is working there as a summer-hire secretary. She knows her father urgently wants
the contract modification so she signs the document and returns it to your office. You
note the last name is the same as the President's so assume that he's the one who
signed the modification. Is this a legal agreement?

legal/question 010 - Answer Probably not. The elements of a contract are - offer,
acceptance, consideration, for a lawful purpose, certainty of terms, and legal capacity. It

, is unlikely that a 17 year old summer hire would have the authority to bind the company,
regardless of her relationship to the Company President. Courts may generally find that
individuals lack "the age majority" if they are under 18 years of age.
The law in a given jurisdiction may never actually use the term "age of majority" and the
term thereby refers to a collection of laws bestowing the status of adulthood. The age of
majority is a legally fixed age, concept, or statutory principle, which may differ
depending on the jurisdiction, and may not necessarily correspond to actual mental or
physical maturity of an individual.
In practical terms, there are certain specific actions which a person who attains the age
of majority is permitted to take, which they could not do before. These may include
entering into a binding contract, buying stocks, voting, buying and/or consuming
alcoholic beverages, driving motor vehicles on public roads, and marrying without
obtaining consent of others. The ages at which these various rights or powers may be
exercised vary as between the various rights and as between different jurisdictions. For
example, the ages at which a person may obtain a license to drive a car or consume
alcoholic beverages vary considerably between and also within jurisdictions.

You are the Contracting Officer for a follow-on buy source selection. The current effort
has had the same Program Manager for over 10 years. She began as the PM while still
a Military Officer and then retired and was re-hired as an A&AS employee to continue to
manage the program. She has extensive experience on the program and is considered
a Primary "Go To" person for all Program-related managerial issues.
The Program Director wants to utilize the PM's experience to the fullest extent possible
and has proposed that the PM be listed as chief of the technical evaluation team and
also a voting member of the source selection board.
Is it permissible to have a non-Government employee (A&AS contractor) as chief of the
technical evaluation team and a voting member of the source selection board?

Acq plan/question 014 - Answer It is not permissible to have a non-Government
employee as a voting member of any source selection board. FAR 7.503(c)(12)(ii). FAR
policy states that contracts shall not be used for the performance of inherently
governmental functions. OMB may review Agency decisions to determine whether a
function is or is not an inherently governmental function, but a list of examples is in FAR
7.503(c). They include: control of criminal investigations or prosecutions, command of
military forces, determination of agency policy and application of regulations,
determining budget priorities, and direction and control of federal employees.
Specifically, included in this list are determining what supplies or services shall be
acquired by the Government on a prime contract and being a voting member of any
source selection boards

You have a contract for engineering services with a basic period of performance and
several one year options for continued performance. The contract states that all options
must be exercised by 1 October of each year. The basic period of performance has just
expired and on 5 October you realize that you never exercised the option for continued
performance. There is still an immediate need for the services. How would you try to
rectify this situation? - Answer Once the option has expired there is no contract. You

Geschreven voor

Vak

Documentinformatie

Geüpload op
24 juli 2022
Aantal pagina's
60
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$21.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EvaTee Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5233
Lid sinds
4 jaar
Aantal volgers
3570
Documenten
56251
Laatst verkocht
7 uur geleden
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

952 beoordelingen

5
453
4
167
3
174
2
48
1
110

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen