Children nearby, noise concerns, and having facility lights emitting into a residential
neighborhood are examples of what aspect of site Analysis? - Answer Nuisance
potentials
The master plan needs to consider generally accepted land use guidelines. - Answer
True
An architect selected for facility design should demonstrate competency and philosophy
in which of the following areas? - Answer All of the above
Mission, goals, objectives; critical issues and strategic responses and details about
clientatle; and an outline of short-range and long-range planning and history of the
organization should be included in the organization's: - Answer Program statement
Change orders and preparation of the punch list occurs in the Design Phase. - Answer
False
An interior designer is a recommended member of a Design Team? - Answer True
The master plan can be used to answer which of the following common questions? -
Answer All of the above
The master plan is not concerned with goals and objectives for transportation and
circulation, utilities and services, and landscape design. - Answer False
The size of a space includes actual dimensions and required accessory space only. -
Answer False
The written portion of the construction documents comes in three parts: 1) Bidding and
Contract Requirements, 2) General Requirements, and what? This third part of the
construction documents includes items such as finishes, furnishings, and masonry. -
Answer Specifications
Methods of this include 1) Lump Sum, 2) Lump Sum with Alternatives, and 3) Unit
Prices - Answer None of the above
Area temperature, humidity, amount of sunshine, precipitation, etc. are examples of
what aspect of Site Analysis? - Answer Climactic conditions
An organization's ad hoc planning advisory committee should be composed of which of
the following members? - Answer All of the above
, Which of the following bids can be handled informally? - Answer Bids from $0 to
$25,000
Which of the following would not be considered an essential member of a master plan
committee? - Answer Equipment Vendor Representatives
Reasonable anticipation that harm or injury is a likely result from certain acts,
omissions, or conditions is known as what? - Answer Foreseeability
When planning facility buffer/safety zones, what is the preferred distance from endline
to wall/obstruction for basketball? - Answer 10 feet
Facility users being forced to walk across a court or between two adjacent courts to get
to another part of the facility is an example of poor planning regarding Buffer/Safety
Zones. - Answer False
Horizontal vs. Vertical Circulation deals with with aspect of planning safe facilities? -
Answer Security and Access Control
Managers of sports facilities are expected to carry out which of the following duties? -
Answer All of the above
Which is not an example of cost-efficient supervision of a facility? - Answer Additional
staff
Typically, what is the first area to be cut when a project goes over budget? - Answer
Storage Spaces
Increased usage of Closed Circuit Television systems in an innovative trend in regards
to what aspect of planning safe facilities? - Answer Supervision
A lack of adequate __________________ space is the #1 complaint from facility
managers. - Answer storage
It is recommended that basketball courts be designed to have at least 15 ft of clear
space on the sidelines and the end of the court. - Answer False
It is important to consider adequate buffer zone or safety zone when designing a facility.
- Answer True
_____________ is the failure to act as a reasonably prudent facility manager would act
in the same or similar circumstances. - Answer Negligence
Which of the following is not a pitfall to avoid when planning sustainable facilities? -
Answer Legal implications