Ultimately, the use of open systems design is expected to result in lower life cycle
costs. Correct Answer: -*True*
-False
When making tradeoffs among competing features, what can be used to
quantifiably compare alternatives by selecting, weighting, and applying criteria?
Correct Answer: -Delphi technique
-Parametric modeling
-Least squares regression analysis
-*Decision matrix*
What problem-solving process is used within an Integrated Product and Process
Development (IPPD) management process to provide a design that balances
capability needs? Correct Answer: -Technical Performance Measurement
-Test and Evaluation
-*Systems Engineering*
-Configuration Management
During the Operational Test (OT) effort, the purpose of validation is to determine
______________________. Correct Answer: -The type and quantity of critical
technical parameters to be monitored
-The number of test units and test ranges required for all test events
-*Whether or not we have "built the right thing"*
-The maximum capabilities of a system achievable under unrealistic operating
conditions
Using ________________, as part of the life cycle logistics and systems
engineering processes to influence the design, also helps to determine the most cost
effective way to support the system throughout its life. Correct Answer: -*Product
Support Analysis (PSA)*
-Reliability Centered Maintenance (RCM)
-A Full-Up Systems-Level (FUSL) test
-An In-Service Review (ISR)
______________ shows how different parts of a system fit together from various
perspectives as a system is designed and developed. Correct Answer: -*Virtual
Prototypes*