Summary Chapter 14 'managing for stakeholders' Gower Handbook of Project Management, ISBN: 9781472422965

Beoordeling
-
Verkocht
-
Pagina's
6
Geüpload op
07-10-2022
Geschreven in
2022/2023

Chapter 10 Gower Handbook of Project Management, ISBN: 2965

Instelling
Vak

Voorbeeld van de inhoud

Summary of the hand of project management | Remco van der Schoot


2.2. HOOFDSTUK 14 – MANAGGING FOR STAKEHOLDERS (P.217-233).
Every project needs financial and non-financial contributions from persons, groups, and entities:


2.2.1. THE ESSENCE OF PROJECT STAKEHOLDER MANAGEMENT
WHO ARE THE PROJECT STAKEHOLDERS?
Project stakeholders = all persons, groups and entities that can affect or are in a position of being affected by the
project.
- Each stakeholder has a help potential and harm potential
- All project stakeholders make their own subjective assessments of the (potential) project success.

Key stakeholders = stakeholders with a high help or harm potential:
- High help potential = the stakeholder can provide significant contributions to the project
- High harm potential has to meanings:
1. The needed contributions from this stakeholder are difficult or impossible to replace
2. The stakeholder can affect other stakeholders’ contributions or perceptions of the project




WHAT IS PROJECT STAKEHOLDER MANAGEMENT?
Project stakeholder management = all purposeful stakeholder-related activities conducted to enhance project
success.

Project stakeholder management consists of two main types of activities:
1. Stakeholder analysis:
a. Contains information about: (key) stakeholders’ requirements, wishes and concerns related to
the project, their project success criteria and potential to help of harm the project.
2. Interacting with the stakeholders in purposeful ways:
a. Contains engaging and disengaging the stakeholders based on information from the
stakeholder analysis

WHAT ARE THE CORE CHALLENGES OF PROJECT STAKEHOLDER MANAGEMENT?
- Identifying the (key) stakeholders
- Acquiring proper knowledge about the stakeholders’ requirements, whishes, concerns and success
criteria
- Conflicts between requirements, whishes, concerns, and success criteria from various stakeholders

P a g i n a 10 | 35

, Summary of the hand of project management | Remco van der Schoot


- No unlimited resources for making stakeholder analyses and interacting with the stakeholders


2.2.2. STAKEHOLDER MANAGEMENT APPROACHES
Two approaches two stakeholder management:
1. Management of stakeholders
2. Management for stakeholders

Management of stakeholders Management for stakeholders
Approach Instrumental Ethical
Stakeholders’ assessed on their potentials for helping and All stakeholders are valuable in their own right
importance harming the project and are entitled to receive management
attention
Purpose of is to procure contributions needed by the
stakeholder project and to prevent stakeholder from
management undertaking actions against the interests of
the project
View on means to obtain project success for the
stakeholders project investor and the members of the
project organization (making stakeholders
comply with the needs of the project).
Conflicts trade-offs between stakeholders are based Search for a win-win situation. If that is not an
between on their help and harm potential (more option, the negative side effects for each
stakeholders important for project success = higher stakeholder are minimized as well as making
chance in getting top priority) the decision process transparent
Values Fairness, transparency, and participation
Downsides Manipulative orientation, lack of ethical Lack of focus on the most important
considerations and narrow focus on the stakeholders, delay of the project due the
interests of the project (may only give short long-lasting searches for win-win situations
sighted benefits, if any at all). and non-ambitious solutions due to not
accepting conflicts and unpleasant trade-offs.
Integrating The instrumental focus to enhance the The ethical focus to ensure that the
the two project progress by giving most attention to requirements, whishes, concerns, and success
the key stakeholders so that they will help criteria for a broad range of stakeholders are
and not harm the project determined and incorporated in the project
plan


2.2.3. PROJECT STAKEHOLDER MANAGEMENT PROCESS
Stakeholder management process consists of three sub processes:
1. Project stakeholder analysis:
a. Identify project stakeholders
i. Who can affect or be affected by the project
b. Assess project stakeholders
i. Needed contributions, help and harm potentials,
needs, expectations and success criteria
ii. Information and communication needs
c. Prioritize project stakeholders
i. Prioritize the stakeholders
ii. Agree upon strategies how to treat stakeholders
d. Plan stakeholder engagement and disengagement
i. Plan how and when to engage and disengage each
stakeholder
2. Project stakeholder engagement:


P a g i n a 11 | 35

Gekoppeld boek

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Heel boek samengevat?
Onbekend
Geüpload op
7 oktober 2022
Aantal pagina's
6
Geschreven in
2022/2023
Type
SAMENVATTING

Onderwerpen

$4.79
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
RSCHO Hogeschool Utrecht
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
305
Lid sinds
3 jaar
Aantal volgers
135
Documenten
58
Laatst verkocht
1 maand geleden
De studeerkast

De studeerkast bevat mijn voorbereidende documenten, welke ik heb gebruik tijdens mijn vijf jaar () aan de Hogeschool Utrecht (HU). In deze vijf jaar heb ik de bachelor Integrale Veiligheidskunde (IVK) en de master Projectmanagement (MPM) afgerond. De studeerkast wordt komende vier jaar aangevuld met samenvatting op het gebied cybersecurity, zoals CISSP, CISM en The Computer Security Handbook. Ik schrijf samenvatting vaak uitgebreider en maak veel gebruik van tabellen, bullet-points en figuren. Als je iets tegenkomt waar ik kan verbeteren of iets wat fout staat aangegeven. Bericht me s.v.p. dan ga ik hiermee direct aan de slag!

Lees meer Lees minder
4.3

26 beoordelingen

5
11
4
13
3
2
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen