Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. - A qualified person Under OSHA construction requirements for crane and derricks, when a crane operator is employed by a company, who must pay for the crane operator's certification? - The crane operator's employer Inspection of hoists should include: - Both A & B (Hooks & Safety latches) Hoists shall be: - All of the above Daily inspections need to include: - Checking of the wire rope for damage or

Show more Read less
Institution
Course

Content preview

OSHA 30 Exam Study Questions (255 Questions with 100% Correct Answers)

Those who work on a crane or near crane operations must be trained. Which of the following is
true for this training? Correct Answer: D. All of the above

Certain inspections of crane equipment may be made by a(n) ___________ person; however,
crane inspections are typically required to be made by a(n) __________ person. Correct Answer:
Competent, qualified

After safety-related modifications have been made to crane equipment, the equipment must be
inspected by __________ prior to use. Correct Answer: A qualified person

Under OSHA construction requirements for crane and derricks, when a crane operator is
employed by a company, who must pay for the crane operator's certification? Correct Answer:
The crane operator's employer

Inspection of hoists should include: Correct Answer: Both A & B (Hooks & Safety latches)

Hoists shall be: Correct Answer: All of the above

Daily inspections need to include: Correct Answer: Checking of the wire rope for damage or
"caging"

Hoists shall be inspected: Correct Answer: Daily, prior to use

Do not perform maintenance on a conveyor until: Correct Answer: All hazardous energies are
disconnected and blocked

Which crane has the ability to be "jacked-up" as needed? Correct Answer: Tower

Load charts must: Correct Answer: Indicate rates lifting capacity and be visible to operator

Standards for safety can be found in: Correct Answer: 29 CFR 1926 Subpart CC

If a crane contacts a power line, the operator should normally stay in the cab until power has
been de-energized. Correct Answer: True

Above the heavy line crossing the load chart are values for failure in: Correct Answer: Structure

Cranes must maintain a minimum of ____ feet away from power lines: Correct Answer: 10'

Each of the following is true for an operator who needs the leave a suddenly energized crane
EXCEPT: Correct Answer: Walk to safety in a zigzag pattern

An annual inspection of each crane: Correct Answer: All of the above

,What is the minimum distance allowed between a spoils pile and trench's edge? Correct Answer:
Two feet

To be classified as Type A, the soil cannot be: Correct Answer: All of the Above

A cubic yard of soil can weigh as much as: Correct Answer: A small pickup truck

A soils are usually clays and cemented soils such as caliche and hardpan. Correct Answer: True

Each of the following is Type B soil EXCEPT: Correct Answer: Sand

Which of the following are common soil classification tests? Correct Answer: All except C

The definition of type C-60 soil is provided by manufacturers to allow the competent person an
opportunity to use vertical shores or... Correct Answer: True

A defining feature of Stable Rock is that it will: Correct Answer: Remain intact while exposed

OSHA requires that the competent person perform two visual and two manual tests on a soil
sample fresh out of the ground and not impacted by weather conditions at the site. Correct
Answer: False

A soil cannot be Type A if it is: Correct Answer: All of the above

The most important distinction between Stable Rock/Types A&B and Type C is: Correct
Answer: Degrees of stability

Which of the following statements is true of kickout? Correct Answer: All of the above

Mixed oak timbers have a greater bending strength per square inch than Douglas fir. Correct
Answer: False

Type B soils afford afford how many options of protection? Correct Answer: Four

In type C soil, the angle of repose is very low; how many degrees must the angle be? Correct
Answer: 34 degrees

Which soil type is the most common? Correct Answer: Type B

Shores must be pumped to a minimum pf 750 pounds of pressure but more is recommended.
Correct Answer: True

Aluminum hydraulic shoring permits both installation and removal without entering the trench
Correct Answer: True

, The struts of a screw jack system must be adjusted manually, which creates a hazard because the
worker is required to: Correct Answer: Be in the trench in order to adjust the strut

The depth at which an excavation needs attention from a registered professional engineer is:
Correct Answer: 20 feet

Shoring and shielding can be custom-built from tabulated data approved by a registered
professional engineer. Correct Answer: True

All systems have a seat of manufacturer's tabulated data to be used for proper design and
installation of the equipment. Correct Answer: True

Placing a shield between the side of an excavation and the work area can minimize the risk in the
event of a cave-in. Correct Answer: True

Walkways must have handrails when at ________ or more above lower level. Correct Answer: 6
feet

Establishing eye contact with your equipment operator is a general safety principle when
working outside the working radius. Correct Answer: True

All surface encumbrances must be removed or supported within: Correct Answer: The zone of
influence

A competent person must inspect all excavations, adjacent areas, and protective systems daily,
____________, and as needed throughout the shift. Correct Answer: Before work begins

When using a ladder in a trench, it must be: Correct Answer: All of the above

Being dangerously close to a falling load is: Correct Answer: Not allowed

Each of the following is true of accumulating water hazards EXCEPT: Correct Answer: Special
supports or shields are not allowed

Each of the following is true of underground installations EXCEPT: Correct Answer: They must
be removed

A surface encumbrance is anything that could create a ___________ in or around a trench.
Correct Answer: Hazard

When exposed to vehicular traffic, your evacuation site must have: Correct Answer: All of the
above

Warning systems for Mobile Equipment include barricades, hand signals, stop logs. Correct
Answer: True

Written for

Institution
Course

Document information

Uploaded on
October 12, 2022
Number of pages
16
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom NURSING
Follow You need to be logged in order to follow users or courses
Sold
4900
Member since
4 year
Number of followers
3235
Documents
55602
Last sold
1 day ago
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.0

1193 reviews

5
632
4
216
3
196
2
40
1
109

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions