PMBOK 6TH EDITION GLOSSARY, Exam Questions with answers, Study Guide. Rated A A set of conditions that is required to be met before deliverables are accepted. - Acceptance Criteria. Products, results, or capabilities produced by a project and validated by the project customer or sponsors as meeting their specified acceptance criteria. - Accepted Deliverables. Within the quality management system, accuracy is an assessment of correctness. - Accuracy. The process of obtaining team members, facilities, equipment, materials, supplies, and other resources necessary to complete project work. - Acquire Resources. Obtaining human and material resources necessary to perform project activities. Acquisition implies a cost of resources, and is not necessarily financial. - Acquisition. A distinct, scheduled portion of work performed during the course of a project. - Activity. Multiple attributes associated with each schedule activity that can be included within the activity list. Activity attributes include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, imposed dates, constraints, and assumptions. - Activity Attributes. The time in calendar units between the start and finish of a schedule activity. See also duration. - Activity Duration. The quantitative assessments of the likely number of time periods that are required to complete an activity. - Activity Duration Estimates A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed. - Activity List. See precedence diagramming method (PDM). - Activity-on-Node (AON). The realized cost incurred for the work performed on an activity during a specific time period. - Actual Cost (AC). The time in calendar units between the actual start date of the schedule activity and either the data date of the project schedule if the schedule activity is in progress or the actual finish date if the schedule activity is complete. - Actual Duration. A project life cycle that is iterative or incremental. - Adaptive Life Cycle. A technique that allows large numbers of ideas to be classified into groups for review and analysis. - Affinity Diagrams. Any document or communication that defines the initial intentions of a project. This can take the form of a contract, memorandum of understanding (MOU), letters of agreement, verbal agreements, email, etc. - Agreements. A technique used to evaluate identified options in order to select the options or approaches to use to execute and perform the work of the project. - Alternative Analysis. A technique for estimating the duration or cost of an activity or a project using historical data from a similar activity or project. - Analogous Estimating. Various techniques used to evaluate, analyze, or forecast potential outcomes based on possible variations of project or environmental variables and their relationships with other variables. - Analytical Techniques. A factor in the planning process that is considered to be true, real, or certain, without proof or demonstration. - Assumption. A project document used to record all assumptions and constraints throughout the project life cycle. - Assumption Log. Method of measuring quality that consists of noting the presence (or absence) of some characteristic (attribute) in each of the units under consideration. - Attribute Sampling. The right to apply project resources, expend funds, make decisions, or give approvals. - Authority. A critical path method technique for calculating the late start and late finish dates by working backward through the schedule model from the project end date. - Backward Pass. A graphic display of schedule-related information. In the typical bar chart, schedule activities or work breakdown structure components are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-placed horizontal bars. See also Gantt chart. - Bar Chart. The approved version of a work product that can be changed only through formal change control procedures and is used as a basis for comparison to actual results. - Baseline. Supporting documentation outlining the details used in establishing project estimates such as assumptions, constraints, level of detail, ranges, and confidence levels. - Basis of Estimates. Benchmarking is the comparison of actual or planned products, processes, and practices to those of comparable organizations to identify best practices, generate ideas for improvement, and provide a basis for measuring performance. - Benchmarking. The documented explanation defining the processes for creating, maximizing, and sustaining the benefits provided by a project or program. - Benefits Management Plan. All documents used to solicit information, quotations, or proposals from prospective sellers. - Bid Documents. The meetings with prospective sellers prior to the preparation of a bid or proposal to ensure all prospective vendors have a clear and common understanding of the procurement. Also known as contractor conferences, vendor conferences, or pre-bid conferences. - Bidder Conference. A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). - Bottom-Up Estimating. The approved estimate for the project or any work breakdown structure component or any schedule activity. - Budget. The sum of all budgets established for the work to be performed. - Budget at Completion (BAC). See reserve. - Buffer. A documented economic feasibility study used to establish validity of the benefits of a selected component lacking sufficient definition and that is used as a basis for the authorization of further project management activities. - Business Case. The net quantifiable benefit derived from a business endeavor. The benefit may be tangible, intangible, or both. - Business Value. A decomposition technique that helps trace an undesirable effect back to its root cause. - Cause and Effect Diagram. A modification to any formally controlled deliverable, project management plan component, or project document. - Change. A process whereby modifications to documents, deliverables, or baselines associated with the project are identified, documented, approved, or rejected. - Change Control. A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions. - Change Control Board (CCB). A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled. - Change Control System. Manual or automated tools to assist with change and/or configuration management. At a minimum, the tools should support the activities of the CCB. - Change Control Tools. A comprehensive list of changes submitted during the project and their current status. - Change Log. A component of the project management plan that establishes the change control board, documents the extent of its authority, and describes how the change control system will be implemented. - Change Management Plan. A formal proposal to modify a document, deliverable, or baseline. - Change Request. See project charter. - Charter. A technique for systematically reviewing materials using a list for accuracy and completeness. - Checklist Analysis. A tally sheet that can be used as a checklist when gathering data. - Checksheets. A request, demand, or assertion of rights by a seller against a buyer, or vice versa, for consideration, compensation, or payment under the terms of a legally binding contract, such as for a disputed change. - Claim. The process of processing, adjudicating, and communicating contract claims. - Claims Administration. The process of finalizing all activities for the project, phase, or contract. - Close Project or Phase. The process(es) performed to formally complete or close a project, phase, or contract. - Closing Process Group. A numbering system used to uniquely identify each component of the work breakdown structure (WBS). - Code of Accounts. The process of determining, documenting, and managing stakeholder needs and requirements to meet project objectives. - Collect Requirements. An organizational placement strategy where the project team members are physically located close to one another in order to improve communication, working relationships, and productivity. - Colocation. A systematic procedure, technique, or process used to transfer information among project stakeholders. - Communication Methods. A description, analogy, or schematic used to represent how the communication process will be performed for the project. - Communication Models. An analytical technique to determine the information needs of the project stakeholders through interviews, workshops, study of lessons learned from previous projects, etc. - Communication Requirements Analysis. A component of the project, program, or portfolio management plan that describes how, when, and by whom information about the project will be administered and disseminated. - Communications Management Plan. A technique to identify the preferred communication method, format, and content for stakeholders for planned communication activities. - Communication Styles Assessment. Specific tools, systems, computer programs, etc., used to transfer information among project stakeholders. - Communication Technology. The process of obtaining seller responses, selecting a seller, and awarding a contract. - Conduct Procurements. A component of the project management plan that describes how to identify and account for project artifacts under configuration control, and how to record and report changes to them. - Configuration Management Plan. A collection of procedures used to track project artifacts and monitor and control changes to these artifacts. - Configuration Management System. Within the quality management system, conformance is a general concept of delivering results that fall within the limits that define acceptable variation for a quality requirement. - Conformance. A limiting factor that affects the execution of a project, program, portfolio, or process. - Constraint. A visual depiction of the product scope showing a business system (process, equipment, computer system, etc.), and how people and other systems (actors) interact with it. - Context Diagrams. An event or occurrence that could affect the execution of the project that may be accounted for with a reserve. - Contingency.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

PMBOK 6TH EDITION GLOSSARY, Exam
Questions with answers, Study Guide.
Rated A


A set of conditions that is required to be met before deliverables are accepted. - ✔✔Acceptance
Criteria.



Products, results, or capabilities produced by a project and validated by the project customer or
sponsors as meeting their specified acceptance criteria. - ✔✔Accepted Deliverables.



Within the quality management system, accuracy is an assessment of correctness. - ✔✔Accuracy.



The process of obtaining team members, facilities, equipment, materials, supplies, and other resources
necessary to complete project work. - ✔✔Acquire Resources.



Obtaining human and material resources necessary to perform project activities. Acquisition implies a
cost of resources, and is not necessarily financial. - ✔✔Acquisition.



A distinct, scheduled portion of work performed during the course of a project. - ✔✔Activity.



Multiple attributes associated with each schedule activity that can be included within the activity list.
Activity attributes include activity codes, predecessor activities, successor activities, logical relationships,
leads and lags, resource requirements, imposed dates, constraints, and assumptions. - ✔✔Activity
Attributes.



The time in calendar units between the start and finish of a schedule activity. See also duration. -
✔✔Activity Duration.

,The quantitative assessments of the likely number of time periods that are required to complete an
activity. - ✔✔Activity Duration Estimates



A documented tabulation of schedule activities that shows the activity description, activity identifier,
and a sufficiently detailed scope of work description so project team members understand what work is
to be performed. - ✔✔Activity List.



See precedence diagramming method (PDM). - ✔✔Activity-on-Node (AON).



The realized cost incurred for the work performed on an activity during a specific time period. -
✔✔Actual Cost (AC).



The time in calendar units between the actual start date of the schedule activity and either the data
date of the project schedule if the schedule activity is in progress or the actual finish date if the schedule
activity is complete. - ✔✔Actual Duration.



A project life cycle that is iterative or incremental. - ✔✔Adaptive Life Cycle.



A technique that allows large numbers of ideas to be classified into groups for review and analysis. -
✔✔Affinity Diagrams.



Any document or communication that defines the initial intentions of a project. This can take the form
of a contract, memorandum of understanding (MOU), letters of agreement, verbal agreements, email,
etc. - ✔✔Agreements.



A technique used to evaluate identified options in order to select the options or approaches to use to
execute and perform the work of the project. - ✔✔Alternative Analysis.



A technique for estimating the duration or cost of an activity or a project using historical data from a
similar activity or project. - ✔✔Analogous Estimating.

,Various techniques used to evaluate, analyze, or forecast potential outcomes based on possible
variations of project or environmental variables and their relationships with other variables. -
✔✔Analytical Techniques.



A factor in the planning process that is considered to be true, real, or certain, without proof or
demonstration. - ✔✔Assumption.



A project document used to record all assumptions and constraints throughout the project life cycle. -
✔✔Assumption Log.



Method of measuring quality that consists of noting the presence (or absence) of some characteristic
(attribute) in each of the units under consideration. - ✔✔Attribute Sampling.



The right to apply project resources, expend funds, make decisions, or give approvals. - ✔✔Authority.



A critical path method technique for calculating the late start and late finish dates by working backward
through the schedule model from the project end date. - ✔✔Backward Pass.



A graphic display of schedule-related information. In the typical bar chart, schedule activities or work
breakdown structure components are listed down the left side of the chart, dates are shown across the
top, and activity durations are shown as date-placed horizontal bars. See also Gantt chart. - ✔✔Bar
Chart.



The approved version of a work product that can be changed only through formal change control
procedures and is used as a basis for comparison to actual results. - ✔✔Baseline.



Supporting documentation outlining the details used in establishing project estimates such as
assumptions, constraints, level of detail, ranges, and confidence levels. - ✔✔Basis of Estimates.



Benchmarking is the comparison of actual or planned products, processes, and practices to those of
comparable organizations to identify best practices, generate ideas for improvement, and provide a
basis for measuring performance. - ✔✔Benchmarking.

, The documented explanation defining the processes for creating, maximizing, and sustaining the
benefits provided by a project or program. - ✔✔Benefits Management Plan.



All documents used to solicit information, quotations, or proposals from prospective sellers. - ✔✔Bid
Documents.



The meetings with prospective sellers prior to the preparation of a bid or proposal to ensure all
prospective vendors have a clear and common understanding of the procurement. Also known as
contractor conferences, vendor conferences, or pre-bid conferences. - ✔✔Bidder Conference.



A method of estimating project duration or cost by aggregating the estimates of the lower-level
components of the work breakdown structure (WBS). - ✔✔Bottom-Up Estimating.



The approved estimate for the project or any work breakdown structure component or any schedule
activity. - ✔✔Budget.



The sum of all budgets established for the work to be performed. - ✔✔Budget at Completion (BAC).



See reserve. - ✔✔Buffer.



A documented economic feasibility study used to establish validity of the benefits of a selected
component lacking sufficient definition and that is used as a basis for the authorization of further
project management activities. - ✔✔Business Case.



The net quantifiable benefit derived from a business endeavor. The benefit may be tangible, intangible,
or both. - ✔✔Business Value.



A decomposition technique that helps trace an undesirable effect back to its root cause. - ✔✔Cause and
Effect Diagram.



A modification to any formally controlled deliverable, project management plan component, or project
document. - ✔✔Change.

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 oktober 2022
Aantal pagina's
46
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
QuickPass Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
418
Lid sinds
3 jaar
Aantal volgers
304
Documenten
6367
Laatst verkocht
1 maand geleden
Get all Documents you need at discount.

All nursing docs available: question banks, summaries, study guide and test banks

3.8

98 beoordelingen

5
52
4
11
3
11
2
10
1
14

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen