CAPM/PMP All In One Guide - Chapter 4 Questions and Answers. Rated A+. 2022/2023 1. You are the project manager for a pharmaceutical company. You are currently working on a project for a new drug your company is creating. A recent change in a law governing drug testing will impact your project and change your project scope. The first thing you should do as project manager is: A. Create a documented change request. B. Proceed as planned since the project will be grandfathered beyond the new change in the law. C. Consult with the project stakeholders. D. Stop all project work until the issue is resolved. - A 2. You are the project manager for the HALO Project. You and your project team are preparing the project plan. Of the following, which one is a project plan development constraint you and your team must consider? A. The budget as assigned by management B. Project plans from similar projects C. Project plans from similar projects that have failed D. Interviews with SMEs who have experience with the project work in your project plan - A 3. You are the project manager of a new project to develop a new software product. Management has not required a formal project management plan in the past, but they'd like you to develop a project management plan to serve as a model or template for all other projects in the organization. The primary purpose of your project management plan is: A. To define the work to be completed to reach the project end date. B. To define the work needed in each phase of the project life cycle. C. To prevent any changes to the scope. D. To provide accurate communication for the project team, project sponsor, and stakeholders regarding how the project will be executed, controlled, and closed. - D 4. In your project management plan development, you'll need several inputs. Of the following, which one is an input to project plan development? A. Assumptions B. Outputs from other project management processes C. Earned value management D. Business needs - B 5. Robert is the project manager of the HBQ Project. This project requires all of the telephones in the organization to be removed and replaced with an Internet phone. He's learned that the removal of some of the phones has damaged the walls in the office building and they will need to be repaired. This project has a deadline and little time for repairing errors that weren't anticipated. Based on this information, which one of the following is the best example of defect repair review? A. Adding labor to a project to reduce errors during the installation of hardware B. Retraining the project team on how to install a new material so that all future work with the new materials is done correctly C. Repairing an incorrectly installed door in a new home construction project D. Inspecting work that has been corrected because it was done incorrectly the first time - D 6. You are the project manager of the NHG Project. You have had to terminate a contract with a vendor. What is this an example of? A. A special case of contract closure B. Mitigation C. A contract claim D. Scope closure - A 7. The project plan provides a baseline for several things. Which one of the following does the project plan NOT provide a baseline for? A. Scope B. Cost C. Schedule D. Control - D 8. You are the project manager for your organization. When it comes to integrated change control, you must ensure that which one of the following is present? A. Supporting detail for the change B. Approval of the change from the project team C. Approval of the change from a subject matter expert D. Risk assessment for each proposed change - A 9. Keisha is the project manager for her organization and she's working with her project team to develop the project management plan for a new project. The project team is confused about the change management plan and how it governs changes within the project. The project plan provides what in regard to project changes? A. A methodology to approve or decline changes B. A guide to all future project risk management decisions C. A vision of the project deliverables D. A fluid document that may be updated as needed based on the CCB - A 10. You are assisting the project manager for the DGF Project. This project is to design and implement a new application that will connect to a database server. Management has requested that you create a method to document technical direction on the project and any changes or enhancements to the technical attributes of the project deliverable. Which one of the following

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CAPM/PMP All In One Guide - Chapter 4
Questions and Answers. Rated A+.
2022/2023


1. You are the project manager for a pharmaceutical company. You are currently working on a project
for a new drug your

company is creating. A recent change in a law governing drug testing will impact your project and
change your project scope.

The first thing you should do as project manager is:

A. Create a documented change request.

B. Proceed as planned since the project will be grandfathered beyond the new change in the law.

C. Consult with the project stakeholders.

D. Stop all project work until the issue is resolved. - ✔✔A



2. You are the project manager for the HALO Project. You and your project team are preparing the
project plan. Of the following,

which one is a project plan development constraint you and your team must consider?

A. The budget as assigned by management

B. Project plans from similar projects

C. Project plans from similar projects that have failed

D. Interviews with SMEs who have experience with the project work in your project plan - ✔✔A



3. You are the project manager of a new project to develop a new software product. Management has
not required a formal

project management plan in the past, but they'd like you to develop a project management plan to
serve as a model or

template for all other projects in the organization. The primary purpose of your project management
plan is:

, A. To define the work to be completed to reach the project end date.

B. To define the work needed in each phase of the project life cycle.

C. To prevent any changes to the scope.

D. To provide accurate communication for the project team, project sponsor, and stakeholders
regarding how the project

will be executed, controlled, and closed. - ✔✔D



4. In your project management plan development, you'll need several inputs. Of the following, which
one is an input to project plan

development?

A. Assumptions

B. Outputs from other project management processes

C. Earned value management

D. Business needs - ✔✔B



5. Robert is the project manager of the HBQ Project. This project requires all of the telephones in the
organization to be removed

and replaced with an Internet phone. He's learned that the removal of some of the phones has damaged
the walls in the office

building and they will need to be repaired. This project has a deadline and little time for repairing errors
that weren't

anticipated. Based on this information, which one of the following is the best example of defect repair
review?

A. Adding labor to a project to reduce errors during the installation of hardware

B. Retraining the project team on how to install a new material so that all future work with the new
materials is done correctly

C. Repairing an incorrectly installed door in a new home construction project

D. Inspecting work that has been corrected because it was done incorrectly the first time - ✔✔D



6. You are the project manager of the NHG Project. You have had to terminate a contract with a vendor.
What is this an example

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 oktober 2022
Aantal pagina's
7
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$7.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
QuickPass Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
418
Lid sinds
3 jaar
Aantal volgers
304
Documenten
6367
Laatst verkocht
2 maanden geleden
Get all Documents you need at discount.

All nursing docs available: question banks, summaries, study guide and test banks

3.8

98 beoordelingen

5
52
4
11
3
11
2
10
1
14

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen