Exam (elaborations) CLC 222 Module 3 Exam: Contract Management
CLC 222 Module 3 Exam: Contract Management • When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) o Incorrect: The Statement of Work • If the COR is monitoring the contract and notices that most of the deliverables are late, this could be an indicator of a problem with the contractor's ability to perform the contract. o Correct: True • A bilateral modification is used to. o Correct: All of these answers are correct • When changes are made to a contract, the government must determine if the change is within ?scope.? In plain English that means the work falls under the basic intent of the original contract. o Correct: True • The COR should work with the Contracting Officer if the COR identifies a need to change the current contract. o Correct: True • During negotiations for a proposed change to the contract, the COR may be asked to: o Correct: All these responses are correct • When a contractor performs work beyond that required by the contract without a formal change order and it is perceived that such work was ordered by the Government or caused by Government fault, this is defined as? o Correct: Constructive change
Geschreven voor
- Instelling
- National Defense University
- Vak
- CLC 222 Module 3
Documentinformatie
- Geüpload op
- 25 oktober 2022
- Aantal pagina's
- 2
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
clc 222 module 3 exam contract management • when reviewing the contract
-
which of the following shall be reviewed for technical and contractual understanding select all that apply o incorrect th