Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

2015 IRC Plumbing Questions with 100% Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
04-11-2022
Geschreven in
2022/2023

Storm drainage sump pumps shall be of a capacity and head appropriate to _______ use requirements. Correct Answer: anticipated 2015 IRC Section P3303.1.1 Pump capacity and head. Electrical services within the scope of the IRC are limited to _____-volt, 0- to _____- ampere, single-phase systems. Correct Answer: 120/240 & 400 2015 IRC Section E3401.2 Scope. Boiler pressure-relief valve discharge shall be pipes to drains by gravity to within _____ inches of the floor or to an open receptor. Correct Answer: 18 2015 IRC Section M2002.4 Pressure-relief valve. Polyethylene tubing for hydronic piping systems shall be installed with _____ ______ joints. Correct Answer: heat fusion 2015 IRC Section M2104.2 Piping joints, Item 2. The maximum amount of fuel oil stored above ground or inside a building shall be _____ gallons. Correct Answer: 660 (The supply tank shall be supported on rigid noncombustible supports to prevent settling or shifting) 2015 IRC Section M2201.2 Above-ground tanks. Vent piping on oil tanks shall be not smaller than _____-inch pipe. Correct Answer: 1 1/4 2015 IRC Section M2203.4 Vent piping. Oil tank vent piping shall terminate outside of building at a point not less than _____ feet, measured vertically or horizontally, from any building opening. Correct Answer: 2 2015 IRC Section M2203.5 Vent termination. Components of a solar thermal energy system that might be subject to pressure drops below atmospheric pressure during operations shall be protected by a _____-_____ _____. Correct Answer: vacuum-relief valve

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

2015 IRC Plumbing Questions with 100% Correct Answers

Storm drainage sump pumps shall be of a capacity and head appropriate to _______ use
requirements. Correct Answer: anticipated

2015 IRC Section P3303.1.1 Pump capacity and head.

Electrical services within the scope of the IRC are limited to _____-volt, 0- to _____- ampere,
single-phase systems. Correct Answer: 120/240 & 400

2015 IRC Section E3401.2 Scope.

Boiler pressure-relief valve discharge shall be pipes to drains by gravity to within _____ inches
of the floor or to an open receptor. Correct Answer: 18

2015 IRC Section M2002.4 Pressure-relief valve.

Polyethylene tubing for hydronic piping systems shall be installed with _____ ______ joints.
Correct Answer: heat fusion

2015 IRC Section M2104.2 Piping joints, Item 2.

The maximum amount of fuel oil stored above ground or inside a building shall be _____
gallons. Correct Answer: 660 (The supply tank shall be supported on rigid noncombustible
supports to prevent settling or shifting)

2015 IRC Section M2201.2 Above-ground tanks.

Vent piping on oil tanks shall be not smaller than _____-inch pipe. Correct Answer: 1 1/4

2015 IRC Section M2203.4 Vent piping.

Oil tank vent piping shall terminate outside of building at a point not less than _____ feet,
measured vertically or horizontally, from any building opening. Correct Answer: 2

2015 IRC Section M2203.5 Vent termination.

Components of a solar thermal energy system that might be subject to pressure drops below
atmospheric pressure during operations shall be protected by a _____-_____ _____. Correct
Answer: vacuum-relief valve

2015 IRC Section M 2301.2.4 Vacuum relief.

, The minimum unobstructed total area of the outside and return air ducts or openings to a forced
air warm-air FURNACE shall not be less than _____ square inches for each 1000 Btu/h output
rating. Correct Answer: 2 (This also applies to supply ducts.)

2015 IRC Section G2442.2 Forced-air furnaces.

Domestic clothes dryer transition ducts shall be metal and limited to a single length not to exceed
_____ feet. Correct Answer: 8 (Transition ducts shall not be concealed within construction.)

2015 IRC Section G2439.7.3 Transition ducts.

What size are fuel-gas-fired domestic clothes dryer ducts? Correct Answer: 4 inches

2015 IRC Section G2439.7.1 Material and size.

The lowest portion of a gas floor furnace shall have not less than ______-inch clearance from
grade level. Correct Answer: 6 (Except where the lower 6-inch portion of the floor furnace is
sealed by the manufacturer to prevent entrance of water, the minimum clearance shall be reduced
to not less than 2 inches.)

2015 IRC Section G2437.4 Clearance

Vent connectors for draft-hood-equipped appliances shall not be _____ than the draft hood outlet
diameter. Correct Answer: smaller

2015 IRC Section G2428.3.17 Connector maximum and minimum size.

A Type B-W gas vent shall terminate at least _____ feet in vertical height above the bottom of
the wall furnace. Correct Answer: 12

2015 IRC Section G2427.6.4 Minimum height.

A Type B or a Type L gas vent shall terminate at least _____ feet in vertical height above the
highest connected APPLIANCE DRAFT HOOD or FLUE COLLAR. Correct Answer: 5

2015 IRC Section G 2427.6.4 Minimum Height

Gas APPLIANCE shutoff valves shall be located in the same room as the APPLIANCE and not
further than _____ feet from the APPLIANCE. Correct Answer: 6 (Each appliance shall be
provided with a shutoff valve separate from the appliance.)

2015 IRC Section G2420.5.1 Located within same room.

Fuel gas appliance connectors shall not exceed an overall length of _____ feet. Correct Answer:
6

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
4 november 2022
Aantal pagina's
6
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
HIGHFLYER Yale School Of Medicine
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
288
Lid sinds
4 jaar
Aantal volgers
263
Documenten
1825
Laatst verkocht
8 maanden geleden

4.0

82 beoordelingen

5
43
4
16
3
11
2
5
1
7

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen