Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CAPM and PMP Exam Prep 150 Free Practice Test Questions 2022

Beoordeling
-
Verkocht
-
Pagina's
138
Cijfer
A+
Geüpload op
10-12-2022
Geschreven in
2022/2023

CAPM and PMP Exam Prep 150 Free Practice Test Questions 2022 CAPM Practice Test 150 Questions Study CAPM Practice Test 150 Questions 9 studiers in 3 days 3.7 (3 reviews) Flashcards Learn Test Match Term 1 / 23 A. Assumptions CM 4.7.2 PMBOK 5.3.3.1 Definition 1 / 23 Project planning is ongoing as the team analyzes how long it will take to process both a new order and a change order through the new call center. This analysis helps them determine how many employees must be working in the car center based on anticipated customer volume. This is an example of what? Created by nahariya_wright Terms in this set (23) Original A. Assumptions CM 4.7.2 PMBOK 5.3.3.1 Project planning is ongoing as the team analyzes how long it will take to process both a new order and a change order through the new call center. This analysis helps them determine how many employees must be working in the car center based on anticipated customer volume. This is an example of what? A. Determine budget CM 7.13; PMBOK 7.3 The project manager and her team are involved in establishing the cost of the project and applying them to the schedule in order to determine when these cost will occur. During the project during which process does this occur? D. initiating, planning, executing, monitoring and controlling, closing (IPEM&CC) CM 3.3.1; PMBOK 1.5.1 During project performance, the team will focus on the Project Life Cycle and the project management life cycle. What are the five phases of a project management life cycle (PMLC)? A. Risk Seeker CM 11.2.7; PMBOK 11 INTRO The project manager is considering quitting his job to develop a book and supporting products for the project management professional exam, and idea he created outside his job. If it sells well, he plans to start his own company and sell the products full-time. What characteristics is he showing towards risk? D. all of the above (Interactive, Push, Pull) CM 10.3.5; PMBOK 10.1.2.4 Which of the following communication methods should be applied to managing project engagement? B. Analogous estimating CM 6.4.2; PMBOK 7.2.2.2 The planning is progressing on schedule for the hotel renovation project. The project manager and the team are ready to begin estimating cost. Since the customer needs an estimate as soon as possible, what estimating methods should the team use? C. Sunk Cost CM 7.5; PMBOK NO REF You are a project manager assigned to a project that has spent $4,000,000. The original budget was $1,500,000. Senior Management is considering stopping this project. What term describes the $1,500,000 that has been spent so far? D. All of the above (A duration of zero, the competition of a major event in the project, the completion of major deliverables) CM 6.2/6.6.15 PMBOK 6.6.3.2 The project manager is having a team meeting and explaining to the team the upcoming Milestones that are due. What are the characteristics of a milestone? B. $10,000.00 CM 7.6.1; Calculating Standard Depreciation use begining value of asset subtracted by ending value then divide by the # of years. A new tape backup server has just been purchased for backing up the company's development and release software. The tape backup server cost $50,000 and it's necessary to upgrade the local area network with an ethernet switch, which has a cost of $10,000. The project manager is told that she needs to set up a depreciation schedule for the tape backup server over a five-year period with a value of $0 at the end of this period. She will use standard depreciation in the calculation. What is the amount per year the server will depreciate? A. 95.46% CM 8.8.10; PMBOK chap 8 (95.46% = 2 sigma, 68.26% = 1 sigma, 99.73% = 3 sigma) You are doing quality planning on a project the project Charter designates that the quality standard for the project is +/- 2 Sigma. This translates to what percentage? A. Lessons Learned CM 4.11.3; PMBOK GLOSSARY The team has just completed the process of evaluating the success of data-cleansing project. The team members analyze how the approach to planning and executing the project work. They documented how the sponsor and Senior Management supported the project? As well as the conflicts that were generated by three functional managers. What have they just completed? D. Slack CM 6.6.4; PMBOK 6.6.2.2 Flexability with an activity on a network diagram is also known as what? B. Control SCOPE CM 5.6; PMBOK 5.6 The project manager is working with the customer to gain formal acceptance of the documentation deliverables for a software project. The customer is saying that the delieverables are unusable in their present form because they don't align with the project requirements. Upon reviewing documentation, the customer tells the project manager that the requirements are not accurate and do not meet the intended needs of the project. Which of the following will help fix this problem? B. Malow's Hierarchy CM 5.6; PMBOK 5.6 A project manager studying different motivation theories is impressed with one Theory which states that that people are not motivated by money but by self-actualization. What theory and practice the project manager? D. The identification of social work packages that can be created outside the WBS, but within the project CM 5.4; PMBOK 5.4 The team has had five meetings to decompose the work of the aircraft carrier project. They are making progress and in a few more meetings should have all the decomposition complete for the multi-year project. All of the following are benefits of using a WBS except... C. Conduct procurement CM 12.2; PMBOK 12.2 A project will be using a company to provide technicians for a distribution center project. Presently, the project manager is in the contract negotiation with a bender and the negotiations are going smoothly. What process is the project manager involved? B. Acquiring organization CM 12.1.5; As the buyer involved in creating the request for proposal (RFP) for an infrastructure project, it will provide the RFP to sellers of products or Services. All of the following are alternative names for a seller except... A. Mandatory Dependency CM 6.3.1; PMBOK 6.3.2.2 Crosswinds Custom Homes is building a customer's Dreamhouse; however, rain has delayed the finish by 3 weeks. The schedule shows that the next task is the installation of the windows followed by the installation of outside siding. This is an example of what? D. Senior management CM 3.3.8; PMBOK 2.3 The project manager and functional manager are having a disagreement over resource allocation for a new Broadband project. The functional manager wants the resource for an operational issue that needs attention and the project manager wants the resource to work on the project so it stays on schedule. Which of the following roles can help resolve this problem? D. Activity - on - node (AON) CM 6.3.3; PMBOK 6.3.2.1 The project manager is creating a network diagram to show the sequencing on the project. He is using a method that includes dummies. All of the following Network diagram techniques display this dependency except... D. Shows who is to perform work in certain areas of the project CM 9.1.3; PMBOK 9.1.2.1 The project manager for the hotel development project is utilizing a Responsibility Assignment Matrix (RAM) to help make project execution go easier. What is the purpose of the RAM? B. The project manager plans to buy from the vendor CM 12.1.6 The project manager has been negotiating an integrated circuit vendor for the last six months and has sent the vendor a statement of work. The vendor has responded with a fixed-fee pricing proposal. The project manager responded with a letter of intent. Why did the project manager send the letter? A. project manager CM 3.3.8; PMBOK 2.3 The project is in a projectized environment. There are significant changes with the meeting the tight schedule of the project and personnel leaving the company. Project Personnel have been complaining to Senior Management about the environment hoping for a resolution. In this type of environment, who controls the resources?

Meer zien Lees minder
Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
10 december 2022
Aantal pagina's
138
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
academicexpert Alliant International University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1097
Lid sinds
5 jaar
Aantal volgers
670
Documenten
2403
Laatst verkocht
1 dag geleden
Academic Expert

Welcome to Academicexpert Stuvia shop! We offer a wide range of high-quality study materials, including Test Banks, Study Guides, and comprehensive notes for various courses. If you’re looking for specific materials, feel free to send me a message here on Stuvia, and I’ll help you find exactly what you need. Study smarter and achieve your best results!

3.6

146 beoordelingen

5
63
4
22
3
33
2
2
1
26

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen