Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MGMT404_WK7_QUIZ (ALL possible questions and Answers)

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
11-12-2022
Geschreven in
2022/2023

MGMT404_WK7_QUIZ (ALL possible questions and Answers) PART 1 Here are the possible QUESTION that you can have on the Week 7 Quiz, along with the Correct Answers. There are 3 possibilites per question with 6 questions. If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same server. Senior management has said this project will cost $10,000. A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000. (TCO 4) An example of parametric estimating would be: If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same server. Senior management has said this project will cost $10,000. The consulting company doing the work estimates the work to cost $40,000. A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000. (TCO 4) An example of bottom up estimating would be: If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same server. Senior management has said this project will cost $10,000. The consulting company doing the work estimates the work to cost $40,000. A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000. (TCO 6) You are the project manager of a major IT project in Italy. You review your earned value report and you see that your SPI is .68. What does this mean to you? The project is doing fine. No corrective actions are needed. The project is slightly ahead of schedule. No corrections are needed. The project is slightly behind schedule. Corrections are needed. The project is very much behind schedule. Immediate corrections are needed. The project is doing fine. It should be completed 18 months ahead of schedule. The project is slightly ahead of schedule. No corrections are needed. The project is slightly behind schedule. Corrections are needed. The project is very much behind schedule. Immediate corrections are needed.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

MGMT404_WK7_QUIZ (ALL possible questions and Answers)

PART 1

Here are the possible QUESTION that you can have on the Week 7 Quiz, along with the Correct

Answers. There are 3 possibilites per question with 6 questions.


(TCO 4) An example of bottom up estimating would be:
If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same
server.
Senior management has said this project will cost $10,000.
The consulting company doing the work estimates the work to cost $40,000.
A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000.

(TCO 4) An example of parametric estimating would be:
If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same
server.
Senior management has said this project will cost $10,000.
The consulting company doing the work estimates the work to cost $40,000.
A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000.

(TCO 4) An example of bottom up estimating would be:
If it cost two dollars today to buy a server, then it will cost three dollars tomorrow to buy the same
server.
Senior management has said this project will cost $10,000.
The consulting company doing the work estimates the work to cost $40,000.
A 100-square foot building costs $1100; therefore, a 1000-square foot building should cost $11000.

(TCO 6) You are the project manager of a major IT project in Italy. You review your earned value
report and you see that your SPI is .68. What does this mean to you?
The project is doing fine. No corrective actions are needed.
The project is slightly ahead of schedule. No corrections are needed.
The project is slightly behind schedule. Corrections are needed.
The project is very much behind schedule. Immediate corrections are needed.

(TCO 6) You are the project manager of a major IT project in Italy. You review your earned
The project
value reportisand
doing
youfine.
seeItthat
should
yourbeSPI
completed 18 months
is 1.18. What ahead
does this of schedule.
mean to you?
The project is slightly ahead of schedule. No corrections are needed.
The project is slightly behind schedule. Corrections are needed.
The project is very much behind schedule. Immediate corrections are needed.

, (TCO 6) You are the project manager of a major IT project in Italy. You review your earned value
report and you see that your CPI is .78. What does this mean to you?
The project is doing fine. It will be completed on budget.
The project is slightly under budget. No corrections are needed.
The project is slightly over budget. Corrections are needed.
The project is very much over budget. Immediate corrections are needed.

(TCO 4) Which of the below is an example of an indirect cost to a project?
Concrete needed to complete a parking
garage A consultant for an IT project
Boats for a river rescue
Janitorial services for an entire building

(TCO 4) Which of the below is an example of a fixed cost to a project?
Cost of mortgage on a building needed for the project
Cost of a day rental van needed for the project
Cost of labor to support the project
Cost of electricity needed to operate a machine needed for the project

(TCO 4) Which of the below is an example of an indirect cost to a project?
Servers needed to complete an IT
project A consultant for a construction
project Cranes to support the making of
a movie
Administrative services serving two projects

(TCO 7) Which of the following is an example of a formal written form of communication?
Meeting notes made at a meeting with the VP of the
company E-mails between an important client and yourself
Contracts with a client
A memo from the senior VP of the company

(TCO 7) Which of the following is an example of an informal verbal form of communication?
A major status meeting with project clients on the project’s progress
Presentations to senior management on the project status
Contracts with a client
A memo from the senior VP of the company
(TCO 7) Which of the following is an example of a formal verbal form of communication?
Meeting notes made at a meeting with the VP of the company
A presentation by the project team to senior management
Contracts with a client that have been reviewed by lawyers
A memo from the senior VP of the company

Geschreven voor

Vak

Documentinformatie

Geüpload op
11 december 2022
Aantal pagina's
8
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$17.44
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LECTMAGGY Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
146
Lid sinds
3 jaar
Aantal volgers
121
Documenten
6325
Laatst verkocht
3 weken geleden
LECTMAGGY

Here, you will find everything you need in NURSING EXAMS AND TESTBANKS.Contact us, to fetch it for you in minutes if we do not have it in this shop.BUY WITHOUT DOUBT!!!!Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3.3

28 beoordelingen

5
8
4
3
3
11
2
0
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen