Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

2023 WGU C215 Operations Management PVDC Final with complete solution

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
05-01-2023
Written in
2022/2023

2023 WGU C215 Operations Management PVDC Final with complete solution Which definition is used for quality, evaluates how well a product performs its intended function? - correct answer Fitness for use 14 points for quality improvement - correct answer Which total quality management (TQM) process was developed to stress management's responsibility for quality? ISO 9000 - correct answer Set of international standards on quality management and quality assurance, critical to international business -TQM process consists of 13 published standards and guidelines -Like when joint commission shows up at the hospitals Checklist - correct answer A list of common defects and the number of observed occurrences of these defects. scatter diagram - correct answer a plot of two variables showing whether they are related Control Chart - correct answer A graph that shows whether a sample of data falls within the common or normal range of variation. mean - correct answer A statistical measure of central tendency, or average, based on dividing a total by the number of individual cases. assignable causes of variation - correct answer -Causes can be identified and eliminated -e.g. poor employee training, worn tool, machine needing repair common causes or random - correct answer Stuff you cannot identify -Random causes that we cannot identify, unavoidable Cpk measures - correct answer How close one is to a target and how consistent one is with the average performance. -How closely it measures Six Sigma - correct answer Technical tolls and people involvement The empirical rule, 3 standard deviations. This is 3 sigma's. 6 sigmas and you are almost at 100% DMAIC DMAIC (Define, Measure, Analyze, Improve, Control) - correct answer a six sigma process that outlines the steps that should be followed to improve an existing business process define stage - correct answer includes the voice of the customer and value stream Job Design - correct answer It does not have anything to do with people. -The process by which managers decide how to divide tasks into specific jobs waiting time - correct answer -Screen patients and fast track those with minor ailments -amount of time a process has been waiting in the ready queue Service location decisions - correct answer -proximity to customers -Quality of life issues proximity to customers - correct answer -key factor of a location analysis for a service company -if you need to have a car repaired, you wont drive too far. Capacity Planning - correct answer Hospital- Capacity is beds and output is the patients. If you have 1 pt for 2 days and one for 3 days. The output is how many patients and not how many beds we have. capacity utilization - correct answer are you using more workers and what are your resources? Measures how much of the available capacity is actually being used. Measures effectiveness. Capacity Focus - correct answer facilities that are small, specialized, and focused on a narrow set of objectives. effective capacity - correct answer capacity measurement at the best operating level - correct answer when the average unit cost is minimized center of gravity approach - correct answer an approach for locating a single facility that minimizes the distance to existing facilities. -use the breakeven analysis -how many units needed to manufacture to breakeven. break-even analysis - correct answer the process of determining the number of units a firm must sell to cover all costs. Considers fixed costs, variable Fed EX is in Tennessee so it will be in the middle repetitive process - correct answer classic assembly line. A line process, a continuous process. Project Process - correct answer make a one-at-a-time product exactly to customer specifications, expensive. Like an automobile collision shop that does body and engine repair as well as custom vehicle paint job. Batch Process - correct answer a process in which goods or services are produced in groups (batches) and not in a continuous stream eg. auto shop offers body repair, engine repair, and custom vehicle paint options Bottleneck in a flowchart - correct answer the longest part in the process eg manufacturing a car and the car needs to be painted or the time the cake in the oven. compute process velocity - correct answer Throughput time/value-added time -How fast we are going Actual output/standard output - correct answer Which formula would indicate that a fast-food restaurant was performing at, above, or below its benchmark? -We know how many burgers were making and what the standard is output/input - correct answer productivity formula Throughput time/value-added time - correct answer How long it takes from the raw materials to become finished goods. Process - correct answer Each item goes through process Which total quality management (TQM) process was developed to stress management's responsibility for quality? - correct answer 14 points for quality improvement Hybrid - correct answer any mix of elements from a product layout and a process layout, to gain the advantages of both eg group technology standard time - correct answer Determines how long it takes a qualified operator to perform a duty of the job requirements under the assumption that the operator is working at a sustainable pace with the proper tools for the process. -How long t takes somebody to finish the work performance time - correct answer How long it actually took observed time - correct answer Actual time -The time measured from stopwatch infinite loading - correct answer A scheduling approach that ignores capacity constraints. -Working backwards -ex Amazon doesn't have the computer you want but they have a network where they can send you to someone who can give it to you finite loading - correct answer -Working forward. -Jobs are assigned to work centers taking into account the work center capacity and job processing times. -Have fixed capacity -ex I go to a bike shop to buy a bike. They know what people will want. They offer repair, the can say I need this employee for repair shop. They have resources to manage Backwards Scheduling - correct answer Begins with required delivery date and works in the reverse order to determine when each process step must be preformed. Respect for people - correct answer A 3rd element element of JIT that considers human resources as an essential part of the JIT philosophy. Reducing waste is achieved - correct answer by Just in time and lean system Lean Systems - correct answer systems that maximize productivity by reducing waste and delays. Not sacrificing productivity -JIT is a part of lean system

Show more Read less
Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Course

Document information

Uploaded on
January 5, 2023
Number of pages
14
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ATIQUIZ Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
846
Member since
3 year
Number of followers
698
Documents
1567
Last sold
2 months ago
NURSING BANK

ACE YOUR EXAMS

3.7

93 reviews

5
42
4
15
3
15
2
7
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions