Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

C857 Software Quality Assurance Pre-Assessment

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
10-01-2023
Written in
2022/2023

C857 Software Quality Assurance Pre-Assessment (Answers on top of the questions) Inspection Management has requested that the development team have a moderator review their newest module of code. Which type of review is being asked for? Black box An informal review of a module of code has been completed. The development team has decided to evaluate the module from an end user perspective. Which method should be used to determine if the code meets quality standards? Black box testing There is a requirement to verify the usability of a product as it is being delivered to ensure overall design and functionality without regard to the internal functioning of the code. Which quality method meets this requirement? Code inspection QA proposes a formal group meeting where the programmer narrates, statement by statement, the logic of a program as an error detection technique. Which quality method meets this proposal? Backtracking A program's state changes from what is expected. Which practice should be applied to find the location of the defect? Reproducing the error A web developer or QA tester encounters an error. What is the best practice to initiate resolution of this error? Ask to document each issue with details in a bug report. Which action should a developer take after receiving an email from a QA tester stating that the application under test is not working? Ask the QA team to provide the steps that led to that error. Which step should be taken first by a developer about a bug that was identified or reported by the QA team? Talk directly with the QA engineer. Which action should a developer take after the review of a bug report? Ask the developer if the bug report was reviewed. Which action should the QA team lead take when the developer has failed to provide feedback after the bug report was delivered? Regression During the implementation phase of a project, the developer realizes the need to change part of the project that has already been written and tested. Which test type should be performed after these changes are made? Configuration management Which standards and procedures are used for managing change in an evolving software product? Acceptance Which test should be used during the requirements phase? It can help reduce the costs of software development by identifying errors.

Show more Read less
Institution
Course

Content preview

C857 Software Quality Assurance Pre-Assessment
(Answers on top of the questions)

Inspection
Management has requested that the development team have a moderator review their
newest module of code. Which type of review is being asked for?
Black box
An informal review of a module of code has been completed. The development team
has decided to evaluate the module from an end user perspective. Which method
should be used to determine if the code meets quality standards?
Black box testing
There is a requirement to verify the usability of a product as it is being delivered to
ensure overall design and functionality without regard to the internal functioning of the
code. Which quality method meets this requirement?
Code inspection
QA proposes a formal group meeting where the programmer narrates, statement by
statement, the logic of a program as an error detection technique. Which quality method
meets this proposal?
Backtracking
A program's state changes from what is expected. Which practice should be applied to
find the location of the defect?
Reproducing the error
A web developer or QA tester encounters an error. What is the best practice to initiate
resolution of this error?
Ask to document each issue with details in a bug report.
Which action should a developer take after receiving an email from a QA tester stating
that the application under test is not working?
Ask the QA team to provide the steps that led to that error.
Which step should be taken first by a developer about a bug that was identified or
reported by the QA team?
Talk directly with the QA engineer.
Which action should a developer take after the review of a bug report?
Ask the developer if the bug report was reviewed.
Which action should the QA team lead take when the developer has failed to provide
feedback after the bug report was delivered?
Regression
During the implementation phase of a project, the developer realizes the need to
change part of the project that has already been written and tested. Which test type
should be performed after these changes are made?
Configuration management
Which standards and procedures are used for managing change in an evolving software
product?
Acceptance
Which test should be used during the requirements phase?
It can help reduce the costs of software development by identifying errors.

Written for

Course

Document information

Uploaded on
January 10, 2023
Number of pages
3
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.19
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
kiokomiss
2.0
(1)

Get to know the seller

Seller avatar
kiokomiss Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
3 year
Number of followers
1
Documents
384
Last sold
1 year ago
kiokomiss

NURSING STUDY GUIDES/EXAMS AND NOTES ALL VERIFIED BY EXPERTS All my uploaded documents, exams and essays are verified by relevant experts.I can assure an A or at least 90% if you use any of my documents.

2.0

1 reviews

5
0
4
0
3
0
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions