Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

C857 Software Quality Assurance Pre-Assessment

Beoordeling
-
Verkocht
-
Pagina's
3
Cijfer
A
Geüpload op
10-01-2023
Geschreven in
2022/2023

C857 Software Quality Assurance Pre-Assessment (Answers on top of the questions) Inspection Management has requested that the development team have a moderator review their newest module of code. Which type of review is being asked for? Black box An informal review of a module of code has been completed. The development team has decided to evaluate the module from an end user perspective. Which method should be used to determine if the code meets quality standards? Black box testing There is a requirement to verify the usability of a product as it is being delivered to ensure overall design and functionality without regard to the internal functioning of the code. Which quality method meets this requirement? Code inspection QA proposes a formal group meeting where the programmer narrates, statement by statement, the logic of a program as an error detection technique. Which quality method meets this proposal? Backtracking A program's state changes from what is expected. Which practice should be applied to find the location of the defect? Reproducing the error A web developer or QA tester encounters an error. What is the best practice to initiate resolution of this error? Ask to document each issue with details in a bug report. Which action should a developer take after receiving an email from a QA tester stating that the application under test is not working? Ask the QA team to provide the steps that led to that error. Which step should be taken first by a developer about a bug that was identified or reported by the QA team? Talk directly with the QA engineer. Which action should a developer take after the review of a bug report? Ask the developer if the bug report was reviewed. Which action should the QA team lead take when the developer has failed to provide feedback after the bug report was delivered? Regression During the implementation phase of a project, the developer realizes the need to change part of the project that has already been written and tested. Which test type should be performed after these changes are made? Configuration management Which standards and procedures are used for managing change in an evolving software product? Acceptance Which test should be used during the requirements phase? It can help reduce the costs of software development by identifying errors.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

C857 Software Quality Assurance Pre-Assessment
(Answers on top of the questions)

Inspection
Management has requested that the development team have a moderator review their
newest module of code. Which type of review is being asked for?
Black box
An informal review of a module of code has been completed. The development team
has decided to evaluate the module from an end user perspective. Which method
should be used to determine if the code meets quality standards?
Black box testing
There is a requirement to verify the usability of a product as it is being delivered to
ensure overall design and functionality without regard to the internal functioning of the
code. Which quality method meets this requirement?
Code inspection
QA proposes a formal group meeting where the programmer narrates, statement by
statement, the logic of a program as an error detection technique. Which quality method
meets this proposal?
Backtracking
A program's state changes from what is expected. Which practice should be applied to
find the location of the defect?
Reproducing the error
A web developer or QA tester encounters an error. What is the best practice to initiate
resolution of this error?
Ask to document each issue with details in a bug report.
Which action should a developer take after receiving an email from a QA tester stating
that the application under test is not working?
Ask the QA team to provide the steps that led to that error.
Which step should be taken first by a developer about a bug that was identified or
reported by the QA team?
Talk directly with the QA engineer.
Which action should a developer take after the review of a bug report?
Ask the developer if the bug report was reviewed.
Which action should the QA team lead take when the developer has failed to provide
feedback after the bug report was delivered?
Regression
During the implementation phase of a project, the developer realizes the need to
change part of the project that has already been written and tested. Which test type
should be performed after these changes are made?
Configuration management
Which standards and procedures are used for managing change in an evolving software
product?
Acceptance
Which test should be used during the requirements phase?
It can help reduce the costs of software development by identifying errors.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
10 januari 2023
Aantal pagina's
3
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$7.09
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
kiokomiss
2.0
(1)

Maak kennis met de verkoper

Seller avatar
kiokomiss Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
3 jaar
Aantal volgers
1
Documenten
384
Laatst verkocht
1 jaar geleden
kiokomiss

NURSING STUDY GUIDES/EXAMS AND NOTES ALL VERIFIED BY EXPERTS All my uploaded documents, exams and essays are verified by relevant experts.I can assure an A or at least 90% if you use any of my documents.

2.0

1 beoordelingen

5
0
4
0
3
0
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen