Agile Practice Questions And Answers (Answered) With Rationale 2022/2023

Beoordeling
-
Verkocht
-
Pagina's
28
Cijfer
A
Geüpload op
26-01-2023
Geschreven in
2022/2023

Agile Practice Questions And Answers (Answered) With Rationale 2022/2023 A smart phone manufacturer is re-assessing its product development methods in response to a sharp increase in user complaints. Analysis of the complaints indicates that the users try to use some features in ways that designers did not anticipate.Given these findings, which agile practice would most effectively prevent the problem? Select one: a. Smoke Testing b. Acceptance Test-Driven Development c. Red, green, refactor d. Behavior-Driven Development Behavior-Driven Development is an extension of Test-Driven Development whereby automated tests and simulations are created before developing the product. Flaws are discovered by forcing the tests to fail before producing the unit in a way that will pass the tests. Distractors are incorrect because the tests are either based on team assumptions (ATDD), minimal (smoke) or too limited (persona). The correct answer is: Behavior-Driven Development Six months into a strategic agile project, company executives are closely monitoring its progress. The COO expresses his frustration that the last weekly burn-down charts show the projected completion date significantly moving back and forward several times.How can the project manager forecast the completion date with more accuracy and stability? Select one: a. Educate the executive committee on the flexible nature of agile planning. b. Reduce frequency of the progress reports sent to senior stakeholders. c. Plan for variable-size iterations according to story complexity and load. d. Ensure upcoming backlog items are elaborated in more detail with the team. Erratic progress curve variations are typical of inconsistent or uninformed story point estimates. Backlog refinement can ensure that overly complex stories are broken down and that past progress informs new story estimates. Distractors are false because they either ignore stakeholder needs or violate agile timeboxing principle (variable-size iterations). The correct answer is: Ensure upcoming backlog items are elaborated in more detail with the team. A project manager experienced in predictive methods is taking on an agile project for the first time. To help in adjusting, the project manager makes a watchlist of situations that arise from inadequate action as a servant leader.Which situations would result from a lack of servant leadership? (Choose THREE.) Select one or more: a. Team members avoid taking on challenging tasks b. Team members avoid direct communication with other departments c. Team members raise impediments they are unable to eliminate

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Agile Practice Questions And Answers (Answered)
With Rationale 2022/2023
A smart phone manufacturer is re-assessing its product development methods in
response to a sharp increase in user complaints. Analysis of the complaints
indicates that the users try to use some features in ways that designers did not
anticipate.Given these findings, which agile practice would most effectively
prevent the problem?
Select one:
a. Smoke Testing
b. Acceptance Test-Driven Development
c. Red, green, refactor
d. Behavior-Driven Development
Behavior-Driven Development is an extension of Test-Driven Development whereby
automated tests and simulations are created before developing the product. Flaws are
discovered by forcing the tests to fail before producing the unit in a way that will pass
the tests. Distractors are incorrect because the tests are either based on team
assumptions (ATDD), minimal (smoke) or too limited (persona).
The correct answer is: Behavior-Driven Development
Six months into a strategic agile project, company executives are closely
monitoring its progress. The COO expresses his frustration that the last weekly
burn-down charts show the projected completion date significantly moving back
and forward several times.How can the project manager forecast the completion
date with more accuracy and stability?
Select one:
a. Educate the executive committee on the flexible nature of agile planning.
b. Reduce frequency of the progress reports sent to senior stakeholders.
c. Plan for variable-size iterations according to story complexity and load.
d. Ensure upcoming backlog items are elaborated in more detail with the team.
Erratic progress curve variations are typical of inconsistent or uninformed story point
estimates. Backlog refinement can ensure that overly complex stories are broken down
and that past progress informs new story estimates. Distractors are false because they
either ignore stakeholder needs or violate agile timeboxing principle (variable-size
iterations).
The correct answer is: Ensure upcoming backlog items are elaborated in more detail
with the team.
A project manager experienced in predictive methods is taking on an agile project
for the first time. To help in adjusting, the project manager makes a watchlist of
situations that arise from inadequate action as a servant leader.Which situations
would result from a lack of servant leadership? (Choose THREE.)
Select one or more:
a. Team members avoid taking on challenging tasks
b. Team members avoid direct communication with other departments
c. Team members raise impediments they are unable to eliminate

,d. High performers in the team move to more senior positions
e. Project stakeholders express skepticism of agile methods
A is correct because servant leaders must promote professional development through
challenges. B is correct because servant leaders help team build bridges with external
groups. E is correct because servant leaders educate stakeholders on agile business
value. C and D are incorrect, because servant leaders remove impediments and
support personal growth beyond project interests.
The correct answers are: Team members avoid taking on challenging tasks, Team
members avoid direct communication with other departments, Project stakeholders
express skepticism of agile methods
A new team member, unaccustomed to agile practices, becomes nervous when
an operations engineer who often criticized his previous work appears at the
morning standup meeting.What could justify the project manager's invitation to
the operations engineer?
Select one:
a. It is a way for the project manager to learn more about the new member
b. It is an agile practice used to prevent routine setting in to daily meetings
c. It is a way to boost the new member's performance and keep him on his toes
d. It is a standard practice in agile to proactively correct misalignments
Proactively seeking input from different stakeholders and transparency of project
communications is considered good Agile practice. Distractors are wrong because they
do not promote the team member's integration to the team by promoting trust (breaking
routine, boost performance) or not favoring direct communication (learning about
member indirectly).
The correct answer is: It is a standard practice in agile to proactively correct
misalignments
A trend of stories uncompleted at the end of iterations has become apparent.
Multiple team members worked on these stories and no blockers were
identified .What can the agile team do to resolve the situation?
Select one:
a. Work with the product owner to further break down the stories in the backlog
and update the Definition of Ready
b. Put the stories in the blocked column and work with the product owner to
remove impediments
c. Put the stories back into the product backlog and wait for a less intensive
iteration to work on them
d. Use the next iteration for a team spike to determine feasibility of completing
the stories
When stories cannot be completed within one iteration, it is typically because the story
is not broken down into small enough goals. Distractors are incorrect because:- they do
not address the root cause by waiting or setting to blocked- product owner cannot
remove impediments if they are not identified and analyzed- devoting full team to a
spike is inefficient and bypasses normal backlog refinement.
The correct answer is: Work with the product owner to further break down the stories in
the backlog and update the Definition of Ready

, The empowered agile team showed impressive progress in the first four
iterations, but now the product owner has noticed low output in the latest five
iterations without any apparent reason.What could be the cause of this situation?
Select one:
a. Technical debt has set in and the team's output will keep dropping until the
cause is eliminated
b. The team worked on low complexity stories from the backlog in the first four
interactions
c. There is most likely a specific under-performing team member slowing the
team down
d. The team was in the storming stage of the development and now have moved
to norming
Some agile teams want to favor faster progress by completing less complex stories
before more complex ones. Prioritization of backlog should be value-based, not speed-
based. Distractors are wrong because:- the change is abrupt: technical debt is a slow
degradation- a low performer would have been apparent in earlier iterations- the team is
autonomous (post-norming).
The correct answer is: The team worked on low complexity stories from the backlog in
the first four interactions
Several items remain in the Kanban blocked column despite the team's efforts to
address them. The retrospective reveals that all the impediments can be traced
back to a particular department head, one the project manager has tried to
educate previously but who still shows resistance.What should the project
manager do next?
Select one:
a. Set up an information radiator ranking stakeholders according to their active
support of the project goals
b. Ask the department head for budgetary compensation proportional to the
delays incurred due to lack of cooperation
c. Ask the team members to find other stakeholders who can help work around
the department head's barriers
d. Use stakeholder analysis to identify an aligned senior stakeholder to influence
the department head
If stakeholders remain resistant despite the project manager's efforts it can be a case
where escalation is required. Distractors are wrong because:

- the project manager normally would have to resolve problems within an established
budget

- bypassing the stakeholder does not address the root cause, which would be likely to
resurface

- public "shaming" by rank does not promote trust and cooperation

The correct answer is: Use stakeholder analysis to identify an aligned senior
stakeholder to influence the department head

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 januari 2023
Aantal pagina's
28
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.28
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
magdamwikash23 Western Governers University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
114
Lid sinds
3 jaar
Aantal volgers
94
Documenten
5328
Laatst verkocht
1 week geleden
Magda

NURSING STUDY GUIDES/EXAMS AND NOTES ALL VERIFIED BY EXPERTS All my uploaded documents, exams and essays are verified by relevant experts.I can assure an A or at least 90% if you use any of my documents.

3.9

14 beoordelingen

5
7
4
2
3
2
2
2
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen