ACQ 202 2023 with complete solution questions and answers
There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. Engineering Which appropriation category would fund the design of new equipment, material, or software? Research, Development, Test and Evaluation What's the primary purpose of an Analysis of Alternatives (AoA)? Provide decision-making aid in selecting a cost-effective material alternative When comparing alternative concepts to provide needed warfighting capabilities, which of the following must be met? Thresholds Estimating potential demand for a capability and developing a rough order of magnitude (ROM) estimate of future sales are characteristics of which International Acquisition & Exportability (IA&E) Assessment area? International Markets Both the Army and Marine Corps have a capability need to procure additional helicopters beyond the number specified in the current contract; the helicopter program is currently in production. What cost estimating technique would the services most likely use as a basis requesting the funding to pay for the additional aircraft? Actual Cost The largest amount of software life cycle cost comes during the design development False An AOA is a study of the _________ Potential Acquisition Strategies for the alternatives WRONG Which of the following guidance documents requires DoD Components to incorporate interoperability and defense exportability aspects into Joint Capabilities Integration and Development System requirements documents to ensure they are addressed in initial planning and design? DFARS Which of the following are characteristics of ICPs Shared cost, Shared risks and benefits, and Government-to-Government To obtain guidance and (if required) approvals on the level and type of protection required, the DoD Component International Program Organization and Program Management Offices (PMOs) must engage: TSFD technology area ("pipe") owners/authorities In certain situations, there may be a U.S. Government requirements to restrict specific portions of a weapon system sale to FMS only while permitting other portions to be acquired DCS True As a general rule of thumb _______ of the total ownership costs of a system occur late in the life cycle, due to costs associated with operations and support. 70-80% What element of IA&E assess the risks of transferring controlled technology and information that provide U.S. warfighters a combat advantage as well as the benefits of international participation? Sales and Transfers WRONG For FMS non-program of record acquisition programs, the FMS customer nation is responsible for developing, awarding, and executing the contract in accordance with their own contracting policies and procedures. False ____refers to the cost of procuring prime mission equipment. Flyaway cost The ____ and the _____ along with the Funding Plan should be established early on in the JCTD to ensure that preparations are developed to facilitate movement of the JCTD into the acquisition process. Management Plan and Transition Plan What document is developed for DoD acquisition programs with substantial international involvement, as a companion to the Acquisition Strategy, to ensure effective integration of domestic and international acquisition efforts throughout the program's life cycle? IBP The best time to reduce life cycle costs is ____ in the life cycle process. ____ can be applied throughout the life cycle to achieve an affordable and effective system. Early/Affordability and Should cost Which of the following IA&E activities addressed in the "International Considerations" sections of the Acquisition Strategy could influence the program's overall acquisition strategy? ... A software-costing model that bases cost estimates up statistical data such as source lines of code is an example of a ____ costing model. Top-down, Delphi WRONG Based on the information from the ICD, an AoA inlcudes: Functional areas, Range of military OPs, and Key attributes as defined by Measure of Effectiveness An International Agreement is established between the U.S. and a partner nation to develop a new defense capability. What are the benefits that typically result from establishing a successful ICP? Enhanced, Enhanced, Lower What is a characteristic of a JCTD? Demonstrates technology in a field environment Which of the following IA&E areas described in the International Considerations section of a program's Acquisition Strategy could have a significant long-term impact on overall program affordability? Establishing a domestic, Coordination with partner, and International partner FMS, BPC, DCS and ACSAs are Security Cooperation equipment and financing activities under what element of International Acquisition & Exportability? Sales and Transfers During which part of the IA&E Assessment does the Program Management Office and Integrated Product Team identify the TSFD technology areas ("pipes") that are relevant to the program's future international acquisition activities? Program Protection Considerations The Navy is in the early stages of developing the next generation attack submarine with state... Analogy WRONG Affordability and Should Cost means Performance and schedule tradeoffs will be made to achieve cost objectives
Written for
- Institution
- ACQ 202
- Course
- ACQ 202
Document information
- Uploaded on
- February 16, 2023
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
parametric
-
acq 202 2023 with complete solution questions and answers
-
there are four basic techniques used by the dod for creating cost estimates analogy
-
and actual costs are three techniques engin