Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

BTEC Unit 9 IT Project Management - Assignment 2 2023 | National Diploma in Information Technology

Beoordeling
-
Verkocht
-
Pagina's
59
Cijfer
A+
Geüpload op
20-02-2023
Geschreven in
2022/2023

BTEC Unit 9 IT Project Management - Assignment 2 2023 | National Diploma in Information Technology. BTEC Level 3 Diploma in Information Technology BTEC Level 3 Extended Diploma in Information Technology Unit number and title Unit 9: IT Project Management Learning aim(s) (For NQF only) B: Carry out a project initiation for an IT project C: Carry out the planning, execution, monitoring and controlling of an IT project, using an appropriate methodology Assignment title Project Management in action Assessor O.Brown Issue date 01/12/2021 Hand in deadline 22/12/2021 Vocational Scenario or Context You have recently been recruited by a new software development company based in Enniskillen as a trainee project manager. You have been asked to manage your first software development project Task 1 You have been asked to project manage the development of a software solution (the software solution will be developed for Unit 6 – Web Development) You need to: • Research and evaluate two possible solutions to the IT problem, identifying and evaluating the project risks and constraints and suggest viable methods of controlling the risks. • Prepare a feasibility study (including an introduction to the project, overall description, a requirements specification and success criteria) and select a preferred solution.) • Project manage the development of the software solution, including the planning, execution, monitoring and control of the project. You need to perform the project management processes in a consistent and effective manner using an appropriate methodology. You should include evidence of: o Project phasing, dividing up the user requirements. Unit 9: IT Project Management 2 o Use of typical project management processes such as the development of risks, issues and tasks, prioritising of work, management of barriers or constraints, regular meetings, budget and resource control) Checklist of evidence required • Evaluation of two possible solutions • Evidence of research into two different solutions • Feasibility study • Evidence of project management planning, monitoring and control of the development activities Criteria covered by this task: Unit/Criteria reference To achieve the criteria you must show that you are able to: BC.D2 Evaluate consistently and comprehensively at least two researched and realistic solutions to an IT problem on a given theme and justify using logical chains of reasoning a preferred solution. BC.D3 Perform consistently and effectively appropriate project management processes to implement an IT-based project. B.M2 Assess consistently at least two adequately researched solutions to an IT problem on a given theme and recommend a preferred solution. C.M3 Perform soundly and consistently appropriate project management processes to implement an IT-based project. B.P3 Research with some inconsistencies an IT problem, based on a given theme and scope out at least two alternative solutions. B.P4 Prepare with some inconsistencies a feasibility study on an IT project and select a preferred solution. C.P5 Plan with some inconsistencies and/or omissions the implementation of an IT project. C.P6 Execute with some inconsistencies and/or omissions the implementation of an IT project. C.P7 Monitor and control with some inconsistencies and/or omissions the implementation of an IT project. Sources of information to support you with this Assignment Lawton, I. PRINCE2 Made Simple, P2MS Press, 2015. 978- 9 Cole,R. and Scotcher, E. Brilliant Agile Project Management: A Practical Guide to Using Agile, Scrum and Kanban, Pearson 2015. 978-0 Newton, R. Project Management Step by Step: How to Plan and Manage a Highly Successful Project, Pearson 2016. 978- 7 Unit 9: IT Project Management 3 Other assessment materials attached to this Assignment Brief e.g., work sheets, risk assessments, case study Unit 9: IT Project Management 4 Unit 9 – IT Project Management (Learning Aim B&C) Learning Aim B – Carry out a project initiation for an IT project Unit Introduction: In this assignment, I will be initiating the project by researching a problem by using my creative skills to generate a range of solutions. I will investigate two solutions to my web development problem. I will also undertake a feasibility study to select an appropriate solution and outline the requirements of the project. Furthermore, I will be planning and executing to undertake a major project as part of my BTEC course. Finally, I will be carrying out the plans that I have made by using an appropriate methodology to explain and analyse the useful contents and by investigating the benefits and drawbacks of this methodology. Initiating the Project: Scenario/User Requirements: Performance Indicators for measuring the success of Hot Beans Web New Innovative website: • A profile of the company itself - A subpage stating all of the company’s awards received - A short paragraph stating the company’s history - A short paragraph stating what are the company’s key values - An insight into what the development process would look like for a potential customer • Profiles of existing trainee web developers - Personal Statement from each trainee web developers - Comments from CEO on each trainee web developer • Job Specification and all required qualifications Unit 9: IT Project Management 5 - Paragraph containing the expected work ethic of a new potential web developer for Hot Beans - Fact File which easily shows at a glance the overall job description - The required qualifications or substitutes (where applicable) - Advertise the courses offered by Hot Beans and what qualification would be awarded • An online application form - Hyperlinks which opens a Google Forms Application Form for the user to fill in and automatically be sent off for processing by recruitment officer • Links to web development courses - Links to Google Forms for each online course Hot Beans offer and the application form should all the user to select the relevant course they wish to partake in - Clear instructions for payment method and the terms and conditions for how payment should be completed The Scenario to Initiate the Project will include: o Each subpage will have their own navigation button at the top of the main menu o The main menu will contain the buttons for each subpage and also a button navigating the user back the ‘home’ page o Google Forms will be created and hyperlinked into the website allowing users to apply for these courses from the comfort of their own home o The staff profiles being added into the website is the make the audience feel more included and like they have the ability to get to know the staff they may be working with as employees or as customers if they wish to avail of Hot Beans services of web development in the future. Scope of the Project: The scope of this project will cover the requirements which are stated above, allowing the user to navigate easily around the website, being able to read about the history of the company, while also being able to register a place at one of Hot Beans prestigious courses. There will be hyperlinks allowing the user to open the Google Forms which allows them to Unit 9: IT Project Management 6 complete the booking, however payment will be taken over the phone once Hot Beans staff call the applicant to confirm their booking of the relevant course Input of the Project: The input of this project will be the individuals applying for course, the form will collect their Title, Full Name, Date of Birth, Current Occupation and also and Telephone Number and Email Address – this will allow the admin staff at Hot Beans to prioritise users on a ‘first come first serve basis’ meaning that if you want to book a place at Hot Beans, you have to get your place booked quickly, other users records are stored on the responses of the form because if someone who has secured a place, and pulls out of the course, the next person in line can then be contacted to offer them a place on the course Process of the Project: The process of this project includes; the input information is collected and then stored in the response section of the Google Form created for the course. This allows the Hot Beans Admin staff to view who submitted their form first to fulfil their ‘first come first serve’ system and allow them to contact customers accordingly. Output of the Project: The output of this project would be the retrieval of the information provided via the Google Form response section and then the admin staff then email or telephone the relevant people to confirm their booking – the list shows the order that the people have applied in order to keep the ‘first come first serve’ policy Storage of the Project: Google Forms are stored on a cloud-based storage system through your Google Account, in the event of the forms becoming deleted they are stored in your ‘bin’ for 30days, giving the company plenty of time to restore the forms should this occur. The website however should be stored on a centrally based server, which has regular backups taken should the main Unit 9: IT Project Management 7 server become damaged, the backup (stored offsite) will have the website stored with a relatively recent version (if not the latest version) meaning little to no data will be lost User Interface of the Project: The interface that I have chosen for this website is Graphical User Interface (GUI) as this type of interface is visually instinctive/intuitive to use and suitable for this type of project. This type of interface allows users to utilise the facilities available with ease using icons and buttons and also not having to already acquired training on using other text-based interfaces such as Command Line Interfaces (CLI) which provides a simple text based layout. This kind of interface would need user to manually enter the commands and names of folders etc. they wish to open, meaning they would need to be very IT savvy to navigate the website. Also, it is very plain and simple and has no ability to be modified to look appealing, leaving the company no ability to make the business shine in a good light through use of colourful images or banners, making GUI the most suitable interface for this project. Project completion duration When creating my project, there will be a Gantt chart created showing a more detailed version of the timeline planned for the duration of the development of Hot Beans new website and associated online application forms, should any of the stages go on longer than expected, this will be documented as part of an attached diary log. Project Lifecycle: Phases Input Output Initiation User Requirements User Constraints Feasibility Report Legislation Implications Phase review and next steps Planning Feasibility Report Legislation Implications Next Steps Project and test plans Constraint’s list Phase review Unit 9: IT Project Management 8 Execution Project and test plans Constrains list Deliverable product Test results Phase review Evaluation Deliverable product Test results Release of deliverable product User documentation Final evaluation report In the first assignment I studied methodologies in detail and I learned that it is important to choose a methodology based on the requirements of my project. As Hot Beans has asked me to set up a website as part of my training I am going to use the Waterfall methodology. I am working on this project on my own with input from other departments in Hot Beans. I am constrained with time as I have a tight hand in date, I will have a discussion with the client at the start of the project but I don’t want to be going back for continuous direction. I intend to get my ideas documented early on and then be free to implement the prototyping and design stages. I will test my website near the end of the project. My research also showed me that waterfall methodology is recommended for software development and website development.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

BTEC Unit 9 IT
Project Management
- Assignment 2 2023 |
National Diploma in
Information Technology

,Unit 9: IT Project
Management
Assignment 2


E. Bullion National Diploma in Information Technology

,Unit 9: IT Project Management


BTEC Assignment Brief
BTEC Level 3 Diploma in Information Technology
Qualification BTEC Level 3 Extended Diploma in Information Technology

Unit number and title
Unit 9: IT Project Management
B: Carry out a project initiation for an IT project
Learning aim(s) (For NQF
C: Carry out the planning, execution, monitoring and
only)
controlling of an IT project, using an appropriate methodology
Project Management in action
Assignment title

Assessor
O.Brown
Issue date
01/12/2021
Hand in deadline
22/12/2021


You have recently been recruited by a new software
development company based in Enniskillen as a trainee
project manager. You have been asked to manage your first
software development project
Vocational Scenario or
Context




You have been asked to project manage the development of a
software solution (the software solution will be developed for
Unit 6 – Web Development)
You need to:
• Research and evaluate two possible solutions to the IT
problem, identifying and evaluating the project risks and
constraints and suggest viable methods of controlling the
risks.
Task 1 • Prepare a feasibility study (including an introduction to the
project, overall description, a requirements specification
and success criteria) and select a preferred solution.)
• Project manage the development of the software solution,
including the planning, execution, monitoring and control of
the project. You need to perform the project management
processes in a consistent and effective manner using an
appropriate methodology. You should include evidence of:
o Project phasing, dividing up the user requirements.



1

, Unit 9: IT Project Management


o Use of typical project management processes such
as the development of risks, issues and tasks,
prioritising of work, management of barriers or
constraints, regular meetings, budget and resource
control)

Checklist of evidence • Evaluation of two possible solutions
required • Evidence of research into two different solutions
• Feasibility study
• Evidence of project management planning, monitoring and
control of the development activities

Criteria covered by this task:
Unit/Criteria
To achieve the criteria you must show that you are able to:
reference
Evaluate consistently and comprehensively at least two researched
BC.D2 and realistic solutions to an IT problem on a given theme and justify
using logical chains of reasoning a preferred solution.
Perform consistently and effectively appropriate project management
BC.D3
processes to implement an IT-based project.
Assess consistently at least two adequately researched solutions to an IT
B.M2
problem on a given theme and recommend a preferred solution.
Perform soundly and consistently appropriate project management
C.M3
processes to implement an IT-based project.
Research with some inconsistencies an IT problem, based on a given
B.P3
theme and scope out at least two alternative solutions.
Prepare with some inconsistencies a feasibility study on an IT project and
B.P4
select a preferred solution.
Plan with some inconsistencies and/or omissions the implementation of
C.P5
an IT project.
Execute with some inconsistencies and/or omissions the implementation
C.P6
of an IT project.
Monitor and control with some inconsistencies and/or omissions the
C.P7
implementation of an IT project.

Sources of information to
support you with this Lawton, I. PRINCE2 Made Simple, P2MS Press, 2015. 978-
Assignment 0992816339
Cole,R. and Scotcher, E. Brilliant Agile Project Management: A
Practical Guide to Using Agile, Scrum and Kanban, Pearson
2015. 978-1292063560
Newton, R. Project Management Step by Step: How to Plan
and Manage a Highly Successful Project, Pearson 2016. 978-
1292142197




2

Geschreven voor

Study Level
Publisher
Subject
Course

Documentinformatie

Geüpload op
20 februari 2023
Aantal pagina's
59
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DRBRIGHT2026 Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
929
Lid sinds
3 jaar
Aantal volgers
696
Documenten
5592
Laatst verkocht
6 dagen geleden
ALPHA STUDY CENTRE.

Alpha Academy is a dedicated study centre where you will find QUALITY & RELIABLE study resources that will help you prepare, revise and pass your examinations for all majors and modules in real TIME.. Good Luck from ALPHA ACADEMY.

3.7

183 beoordelingen

5
95
4
25
3
19
2
7
1
37

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen