PSM 1 Flashcards | Quizlet. University of the Cumberlands BUSINESS EMBA
The maximum length of the Sprint Review (its time-box) is: 4 hours for a monthly Sprint. For shorter Sprints it is usually shorter. Who is responsible for managing the progress of work during a Sprint? The Development Team Who is on the Scrum Team? 1) The Scrum Master 2) The Product Owner 3) The Development Team Which two things does the 1) Deliver an increment of potentially releasable Development Team do during software the first Sprint? 2) Develop and deliver at least one piece of functionality Which of the below are roles on a Scrum Team? 1) Development Team 2) Product Owner 3) Scrum Master Which statement best describes the Sprint Review? It is when the Scrum Team and stakeholders inspect the outcome of the Sprint and figure out what to do next (upcoming Sprint) To inspect the product increment with stakeholders and collect feedback on next steps The time-box for a Daily Scrum is? 15 minutes When might a Sprint be abnormally cancelled? When the Sprint Goal becomes obsolete What is the role of Management in Scrum? Support the Product Owner with insights and information into high value product and system capabilities. Support the Scrum Master to cause organizational change that fosters empiricism, self-organization, The three pillars of empirical process control are: Inspection, Transparency, Adaptation What is the recommended size for a Development Team (within the Scrum Team)? 3 to 9
Geschreven voor
- Instelling
- University Of The Cumberlands
- Vak
- BUSINESS EMBA
Documentinformatie
- Geüpload op
- 20 februari 2023
- Aantal pagina's
- 52
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
psm 1 flashcards | quizlet university of the cumberlands business emba psm 1 terms in this set 277 the maximum length of the sprint review its time box is 4 hours for a monthly sprint fo