Second Class Boiler License 2nd Minnesota questions with correct answers
Certificate of inspection. CORRECT ANSWER means a sticker attached to the boiler or pressure vessel which documents the month and year of the inspection and the employer of the inspector performing the inspection. Certificate of registration CORRECT ANSWER means a document that has been made available on the department's Web site that lists all registered boilers and pressure vessels at a location, including the last inspection date, the certificate expiration date, and the maximum allowable working pressure for each boiler or pressure vessel. High-pressure boiler CORRECT ANSWER means a boiler operating at a steam or other vapor pressure in excess of 15 psig, or a water or other liquid boiler in which the pressure exceeds 160 psig or the temperature exceeds 250 degrees Fahrenheit. Inspection due date CORRECT ANSWER means the last possible date that the inspection can be completed within the time limits in this chapter Insurance company boiler inspector CORRECT ANSWER means a national board-commissioned inspector who holds a current certificate of competency issued by the state. Low-pressure boiler. CORRECT ANSWER means a boiler operating at a steam or other vapor pressure of 15 psig or less, or a water or other liquid boiler in which the pressure does not exceed 160 psig and the temperature does not exceed 250 degrees Fahrenheit. National board. CORRECT ANSWER means the National Board of Boiler and Pressure Vessel Inspectors, which is an organization comprised of chief Insp
Geschreven voor
- Instelling
- Second Class Boiler
- Vak
- Second Class Boiler
Documentinformatie
- Geüpload op
- 6 maart 2023
- Aantal pagina's
- 10
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
second class boiler license 2nd minnesota questions with correct answers
Ook beschikbaar in voordeelbundel