Low Pressure Boiler COF NY Answered Questions 2023/2024
A fill line in an oil burner system is a line used to: - Fill the storage tank with oil. The aquastat is located - Below the water line. All heating, combustion, and cooking equipment shall be installed with adequate clearances from _______ construction. - Combustible The equipment must be provided with ______ or the building construction shall be _____ _____. - Insulation. Fire Protected During operation the surface of combustible construction materials will not be raised to a temp higher than _____ degrees F. - 170 degrees Equipment shall be so that the means of access for ordinary operation and maintenance will not be _______. - Hazardous Acceptance Tests: Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____ _____ has been issued by the ______. - Inspected and tested. Use permit, commissioner Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney connections. - Once a year Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the ________, specifying the _____of each boiler and ______ for inspection. - Annual, commissioner, location, arrangement. Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before the system is operated. - Hydrostatically, contractor The piping shall be tested at _____ times the max working pressure applicable to that part of the piping system but at a pressure ____ than the test pressure required for the storage tank. - 1/2, less The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than ____ psi. - 1 1/2, 25 psi The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for ___, but in no case less than _____ hour. - Joints, connections, leaks, 1/2 hour. A record must be kept of the pressure test showing the name of the _____ and the _____ at which the piping and tank were tested. - Contractor, pressure Gas piping must be tested by the _____ before operation. - Contractor For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be permanently located in an easily _____ and _____ location near the equipment. - Instruction Cards, visible, accessible No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the commissioner, the requirements of the ____ ____ control code have been met and until the approval for the storage of ____ ____ has been given by the fire commissioner. - Use permit, air pollution, fuel oil Every oil burning installation that is not fully automatic or requires preheating shall be operated under the direct supervision of a person holding a ____ ___ ______ issued by the FD. - COF Such person must be in the building at ____ ____ while in operation and present in the _____ _____ during startup. - All times, boiler room After any repairs to the boiler are made, ______ shall check the repairs and the functioning of all ____ _____ and the positioning of the ______. - Operators, control devices, valves All heating and combustion equipment that is fired with solid, liquid, or gas fuels, must comply with the requirements of the ____ _____ _____ code. - Air pollution control Low Temp Equipment have a temp of ____ degrees at the point of leaving the equipment. - 600 or less Median Temp Equipment have a temp of between ___ and ___ degrees F at the point of leaving the equipment under normal conditions. - 600 and 1000 High Temp Equipment have a temp of ____ or ____ degrees F leaving the equipment. - 1000 or greater Ventilation shall be capable of providing at least ____ cfm of air for each gallon of oil per ____. - 36, hour If ventilation is supplied mechanically, the ventilation system shall be _____ interlocked with the _____, so that the vent system maintains a pressure no ___ than the _____ atmospheric pressure. - Electrically, burner, less, outdoor
Geschreven voor
- Instelling
- Low Pressure Boiler COF NY
- Vak
- Low Pressure Boiler COF NY
Documentinformatie
- Geüpload op
- 7 maart 2023
- Aantal pagina's
- 8
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
low pressure boiler cof ny answered questions 20232024