Chapter 10 1. Standard costs should generally be based on the actual costs of prior periods. Ans: False Difficulty: Easy 2. The standard direct labour rate should NOT include fringe benefits. Ans: False Difficulty: Easy 3. From a standpoint of cost control, the most effective time to recognize material price variances is when the materials are placed into production. Ans: False Difficulty: Medium 4. The material quantity variance is computed based on the quantity of all materials purchased during the period. Ans: False Difficulty: Medium 5. Purchase of poor quality materials will generally result in a favourable materials price variance and an unfavourable labour rate variance. Ans: False Difficulty: Medium 6. At the end of the variance analysis cycle, management should be able to cast blame on individuals responsible for unfavourable variances. Ans: False Difficulty: Medium 7. (Appendix 10B) A favourable labour efficiency variance would result in a credit balance in the labour efficiency variance account. Ans: True Difficulty: Medium 8. Management by exception means that a manager's attention is directed toward those parts of the organization where things are NOT proceeding according to plans. Ans: True Difficulty: Easy 9. The production manager is usually held responsible for the labour efficiency variance. Ans: True Difficulty: Easy 10. All cost variances should be considered exceptions that require the attention of management. Ans: False Difficulty: Easy 11. (Appendix 10A) A mix variance for direct materials can be derived as the difference between the quantity variance and the yield variance. Ans: True Difficulty: Medium Page 1 12. Standard costs can be used in conjunction with job-order costing but NOT with process costing. Ans: False Difficulty: Medium 13. The overhead spending variance contains price but not quantity elements. Ans: False Difficulty: Easy 14. The variable overhead efficiency variance reflects how efficiently variable overhead resources were used. Ans: False Difficulty: Medium 15. A reason for keeping a constant denominator activity level is to maintain stability in the amount of overhead cost that is applied to each unit of product manufactured over the period. Ans: True Difficulty: Easy 16. The fixed portion of the predetermined overhead rate is used for product costing purposes and has no significance in terms of cost control. Ans: True Difficulty: Medium 17. In a standard costing system, under- or overapplied fixed overhead is equal to the sum of the fixed overhead budget variance and the fixed overhead volume variance. Ans: True Difficulty: Medium 18. If the standard hours allowed for the actual output of the period is greater than the denominator level of activity (in hours), then the overhead budget variance will be unfavourable. Ans: False Difficulty: Medium 19. The fixed overhead budget variance is NOT controllable by managers because fixed costs are NOT controllable. Ans: False Difficulty: Medium 20. One cause of an unfavourable overhead volume variance would be increases in cost for fixed overhead items. Ans: False Difficulty: Medium 21. If the denominator activity (in hours) used to compute the predetermined overhead rate is equal to the actual activity (in hours) for the period, then there is no volume variance. Ans: False Difficulty: Hard 22. Because managers want stable unit cost figures, the accountant creates an artificial stability so far as fixed costs are concerned by applying fixed costs to products as if the fixed costs were really variable. Ans: True Difficulty: Medium Chapter 10, Standard Costs and Overhead Analysis 23. Waste or excessive usage of overhead items will show up as part of the variable overhead efficiency variance. Ans: False Difficulty: Easy 24. Capacity analysis is most affected by the presence of variable costs, NOT fixed costs. Ans: False Difficulty: Hard 25. (Appendix 10A) Direct labour efficiency variance can be analyzed further into mix and yield variances if more than one class of direct labour that are good substitutes is used in operations. Ans: True Difficulty: Medium 26. Which of the following refers to standards that allow for no machine breakdowns or other work interruptions and that require peak efficiency at all times? A) Normal standards. C) Ideal standards. B) Practical standards. D) Budgeted standards. Ans: C Difficulty: Easy 27. To measure controllable production inefficiencies, which of the following is the best basis for a company to use in establishing the standard hours allowed for the output of one unit of product? A) Average historical performance for the last several years. B) Engineering estimates based on ideal performance. C) Engineering estimates based on attainable performance. D) The hours per unit that would be required for the present workforce to satisfy expected demand over the long run. Ans: C Difficulty: Medium

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Chapter 10
1. Standard costs should generally be based on the actual costs of prior periods.
Ans: False Difficulty: Easy

2. The standard direct labour rate should NOT include fringe benefits.
Ans: False Difficulty: Easy

3. From a standpoint of cost control, the most effective time to recognize material price
variances is when the materials are placed into production.
Ans: False Difficulty: Medium

4. The material quantity variance is computed based on the quantity of all materials
purchased during the period.
Ans: False Difficulty: Medium

5. Purchase of poor quality materials will generally result in a favourable materials price
variance and an unfavourable labour rate variance.
Ans: False Difficulty: Medium

6. At the end of the variance analysis cycle, management should be able to cast blame on
individuals responsible for unfavourable variances.
Ans: False Difficulty: Medium

7. (Appendix 10B) A favourable labour efficiency variance would result in a credit balance
in the labour efficiency variance account.
Ans: True Difficulty: Medium

8. Management by exception means that a manager's attention is directed toward those parts
of the organization where things are NOT proceeding according to plans.
Ans: True Difficulty: Easy

9. The production manager is usually held responsible for the labour efficiency variance.
Ans: True Difficulty: Easy

10. All cost variances should be considered exceptions that require the attention of
management.
Ans: False Difficulty: Easy

11. (Appendix 10A) A mix variance for direct materials can be derived as the difference
between the quantity variance and the yield variance.
Ans: True Difficulty: Medium




Page 1

,12. Standard costs can be used in conjunction with job-order costing but NOT with process
costing.
Ans: False Difficulty: Medium

13. The overhead spending variance contains price but not quantity elements.
Ans: False Difficulty: Easy

14. The variable overhead efficiency variance reflects how efficiently variable overhead
resources were used.
Ans: False Difficulty: Medium

15. A reason for keeping a constant denominator activity level is to maintain stability in the
amount of overhead cost that is applied to each unit of product manufactured over the
period.
Ans: True Difficulty: Easy

16. The fixed portion of the predetermined overhead rate is used for product costing purposes
and has no significance in terms of cost control.
Ans: True Difficulty: Medium

17. In a standard costing system, under- or overapplied fixed overhead is equal to the sum of
the fixed overhead budget variance and the fixed overhead volume variance.
Ans: True Difficulty: Medium

18. If the standard hours allowed for the actual output of the period is greater than the
denominator level of activity (in hours), then the overhead budget variance will be
unfavourable.
Ans: False Difficulty: Medium

19. The fixed overhead budget variance is NOT controllable by managers because fixed costs
are NOT controllable.
Ans: False Difficulty: Medium

20. One cause of an unfavourable overhead volume variance would be increases in cost for
fixed overhead items.
Ans: False Difficulty: Medium

21. If the denominator activity (in hours) used to compute the predetermined overhead rate is
equal to the actual activity (in hours) for the period, then there is no volume variance.
Ans: False Difficulty: Hard

22. Because managers want stable unit cost figures, the accountant creates an artificial
stability so far as fixed costs are concerned by applying fixed costs to products as if the
fixed costs were really variable.
Ans: True Difficulty: Medium

, Chapter 10, Standard Costs and Overhead Analysis


23. Waste or excessive usage of overhead items will show up as part of the variable overhead
efficiency variance.
Ans: False Difficulty: Easy

24. Capacity analysis is most affected by the presence of variable costs, NOT fixed costs.
Ans: False Difficulty: Hard

25. (Appendix 10A) Direct labour efficiency variance can be analyzed further into mix and
yield variances if more than one class of direct labour that are good substitutes is used in
operations.
Ans: True Difficulty: Medium

26. Which of the following refers to standards that allow for no machine breakdowns or other
work interruptions and that require peak efficiency at all times?
A) Normal standards. C) Ideal standards.
B) Practical standards. D) Budgeted standards.
Ans: C Difficulty: Easy

27. To measure controllable production inefficiencies, which of the following is the best
basis for a company to use in establishing the standard hours allowed for the output of
one unit of product?
A) Average historical performance for the last several years.
B) Engineering estimates based on ideal performance.
C) Engineering estimates based on attainable performance.
D) The hours per unit that would be required for the present workforce to satisfy
expected demand over the long run.
Ans: C Difficulty: Medium

28. Which of the following statements concerning practical standards is NOT correct?
A) Practical standards can be used for product costing and cash budgeting.
B) Practical standards can be attained by the average worker.
C) When practical standards are used, there is no reason to adjust standards if an old
machine is replaced by a newer, faster machine.
D) Under practical standards, large variances are less likely than under ideal standards.
Ans: C Difficulty: Easy

29. If a company follows a practice of isolating variances at the earliest point in time, what
would be the appropriate time to isolate and recognize a direct material price variance?
A) When material is issued. C) When material is used in production.
B) When material is purchased. D) When production is completed.
Ans: B Difficulty: Easy




Page 3

, 30. What does an unfavourable labour efficiency variance indicate?
A) The actual labour rate was higher than the standard labour rate.
B) The labour rate variance must also be unfavourable.
C) Actual labour hours worked exceeded standard labour hours for the production
level achieved.
D) Overtime labour was used during the period.
Ans: C Difficulty: Medium

31. What does a favourable labour rate variance indicate?
A) Actual hours exceed standard hours.
B) Standard hours exceed actual hours.
C) The actual rate exceeds the standard rate.
D) The standard rate exceeds the actual rate.
Ans: D Difficulty: Easy

32. (Appendix 10B) What does a credit balance in a direct labour efficiency variance account
indicate?
A) The average wage rate paid to direct labour employees was less than the standard
rate.
B) The standard hours allowed for the units produced were greater than actual direct
labour hours used.
C) The actual total direct labour costs incurred were less than standard direct labour
costs allowed for the units produced.
D) The number of units produced was less than the number of units budgeted for the
period.
Ans: B Difficulty: Hard

33. If the actual labour hours worked exceed the standard labour hours allowed, what type of
variance will occur?
A) Favourable labour efficiency variance.
B) Favourable labour rate variance.
C) Unfavourable labour efficiency variance.
D) Unfavourable labour rate variance.
Ans: C Difficulty: Easy

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
9 maart 2023
Aantal pagina's
182
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ExamsConnoisseur Self
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
587
Lid sinds
3 jaar
Aantal volgers
344
Documenten
1492
Laatst verkocht
3 weken geleden

4.2

68 beoordelingen

5
40
4
11
3
13
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen