Rigging Test Questions and Answers 2023 Graded A operator a signal person must be provided when the point of operation, meaning the load travel or the area near or at load placement is not in full view of the: dedicated spotter when the equipment is travelling and the view in the direction of travel is obstructed, a ____________ must be provided notify the crane who the signal is for For each signal, prior to giving the function/direction, the signal person must: signal person, operator, lift director When non-standard signals are used, the following people must contact each other prior to the lift operation and agree upon the non-standard signals which are going to be used: distance, function, direction which of the following are the three required elements of a voice signal? as many as are required per the lift plan How many persons may share a dedicated channel for the purpose of coordinating operations? proximity alarms which of the following are set to give the operator sufficient warning to prevent encroachment of power lines? effective, clear, and reliable when using electronic transmission devices, the transmitted signal must be: blocks installed at contact points to ensure that correct sling angles are maintained during choker hitch use, the sling may have: jaw and weldless eye A turnbuckle to be used in hoisting or rigging operations should be of what type construction? turnbuckle the attached drawing illustrates a device for adjustment of load and is termed a: find the center of gravity when lifting an object that is of irregular shape, you must always: the operator and signal person who is allowed to design a new signal system? site conditions preclude the use of hand, voice, or audio systems en an a new signal system be used? the operator, signal person, and lift director who determines if a new signal system is suitable?

Show more Read less
Institution
Course

Content preview

Rigging Test Questions and Answers 2023 Graded A
operator
a signal person must be provided when the point of operation, meaning the load travel
or the area near or at load placement is not in full view of the:
dedicated spotter
when the equipment is travelling and the view in the direction of travel is obstructed, a
____________ must be provided
notify the crane who the signal is for
For each signal, prior to giving the function/direction, the signal person must:
signal person, operator, lift director
When non-standard signals are used, the following people must contact each other prior
to the lift operation and agree upon the non-standard signals which are going to be
used:
distance, function, direction
which of the following are the three required elements of a voice signal?
as many as are required per the lift plan
How many persons may share a dedicated channel for the purpose of coordinating
operations?
proximity alarms
which of the following are set to give the operator sufficient warning to prevent
encroachment of power lines?
effective, clear, and reliable
when using electronic transmission devices, the transmitted signal must be:
blocks installed at contact points
to ensure that correct sling angles are maintained during choker hitch use, the sling may
have:
jaw and weldless eye
A turnbuckle to be used in hoisting or rigging operations should be of what type
construction?
turnbuckle
the attached drawing illustrates a device for adjustment of load and is termed a:




find the center of gravity
when lifting an object that is of irregular shape, you must always:
the operator and signal person
who is allowed to design a new signal system?
site conditions preclude the use of hand, voice, or audio systems
en an a new signal system be used?
the operator, signal person, and lift director
who determines if a new signal system is suitable?

, the new signal system is at least equally effective communication as the standard
system being replaced
what must be demonstrated prior to the use of a new signal system?
tower
some manufactures of carrier-mounted lattice boom cranes offer optional _________
attachments for their machines
bridge
the ___________ is the main structural member of an over head crane used to span the
width of the runway area
hoist
any overhead crane consists of three basic units; the bridge, trolley, and:
crawler
carrier-mounted lattice boom cranes are also commonly referred to as __________
cranes.
load hook
the crane is said to be in a particular quadrant of operation when the ______________
is located over that area
360
in addition to using flags and barricades to show the work zone near power lines, the
employer can define the work zone area ________ degrees around the equipment up to
the equipment's maximum working radius
block
two-blocking occurs when the ___________ or headache ball makes contact with the
sheaves at the boom tip
low
industrial cranes have _____________ centers of gravity to permit operation in narrow
aisles or runways without outriggers
front
high wind speed acting on the __________ of the boom can cause it to topple backward
if it is at a high boom angle
100%
whenever anything is lifted or raised from a horizontal position to a vertical position, the
crane load will be equal to _________ the weight of the object until the object is vertical
and clears the ground
radius
as a crane starts to tip, the load _________ begins to increase. This increases the
load's leverage on the crane and the tipping force
center of gravity
rotation of the upper works changes the location of the crane's:
angle
critical lifts are those where the load weight is close to the rated capacity of the crane.
When the lifting load weighs more than 75% of the rated capacity, or when lifts involve
two or more cranes, be sure to check the boom:
stops
the leverage the crane exerts on the load changes as it:
three

Written for

Course

Document information

Uploaded on
March 12, 2023
Number of pages
5
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.09
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
magdamwikash23 Western Governers University
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
3 year
Number of followers
94
Documents
5328
Last sold
5 days ago
Magda

NURSING STUDY GUIDES/EXAMS AND NOTES ALL VERIFIED BY EXPERTS All my uploaded documents, exams and essays are verified by relevant experts.I can assure an A or at least 90% if you use any of my documents.

3.9

14 reviews

5
7
4
2
3
2
2
2
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions