Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CIV1298H - New topics in CivMin: Building Information Modelling Individual Assignment

Beoordeling
-
Verkocht
-
Pagina's
23
Cijfer
A
Geüpload op
24-03-2023
Geschreven in
2022/2023

Individual assignment final assignment

Instelling
Vak

Voorbeeld van de inhoud

GROUP 1 - BIM use in Estimating

Executive Summary
First, this paper aimed to understand how the current BIM application facilitated quantity
surveyors to leverage the valuable input from the designer’s three-dimensional model to promptly
improve the accuracy of the cost estimation result and the status of the BIM 5D adaption in the
construction cost consulting industry. Second, it discussed the applicable industry standard of the
BIM 5D modeling and explained how BIM 5D cost estimation could enhance the reliability of the
quantity take-off workflow in the pre-construction planning stage. Third, the relevant literature
review summarized the benefits of implementing the BIM 5D in the cost estimating practice and
the central dilemma of the BIM 5D adaption in the cost consulting industry. Fourth, two case
studies demonstrated the workflow and processes in estimating using BIM in different design
phases. The relative benefits and challenges were evaluated as well. Fifth, the paper discussed
significant limitations which prevent the BIM 5D adoption process, including the lack of BIM
mandate, incompatibility, high setup cost, BIM 5D designer's knowledge, and legal factor. Sixth,
the paper focuses on the BIM 5D future trend in Canada, considering BIM mandate establishment,
market demand, BIM education, and stakeholder collaboration.




ii | P a g e

, GROUP 1 - BIM use in Estimating

Contents
Executive Summary ........................................................................................................................ ii
1 Introduction ............................................................................................................................. 1
2 Objective ................................................................................................................................. 1
3 Methodology ........................................................................................................................... 2
4 Literature Review.................................................................................................................... 2
4.1 History of BIM Development .......................................................................................... 2
4.2 BIM 5D for Quantity Surveying Practice ........................................................................ 4
4.3 BIM Industry Format - IFC.............................................................................................. 5
5 Case Study 1 - Workflows Incurred by the Adoption of BIM Software by a Construction
Company ......................................................................................................................................... 5
5.1 BIM integration with Cost Estimating ............................................................................. 6
5.2 Technological Challenges of Implementing BIM-based Cost Estimating ....................... 6
5.3 Organizational Challenges of Implementing BIM-based Cost Estimating ...................... 7
5.3.1 Existing Methodology at the Company and Proposed Improvements...................... 7
6 Case Study 2 – Investigation of Leveraging BIM Information Exchange Standards for
Conducting LOD-Based Cost Estimating....................................................................................... 9
6.1 Introduction ...................................................................................................................... 9
6.2 Level of Cost Estimating ................................................................................................ 10
6.3 BIM Cost Estimating Workflows................................................................................... 10
6.4 Facilitating the Process Using Industry Standards......................................................... 12
6.4.1 Standards Applicable to BIM.................................................................................. 13
6.4.2 Standards Applicable to Cost Databases................................................................. 13
6.5 Final remarks .................................................................................................................. 14
7 Limitations ............................................................................................................................ 14
7.1 Lack of BIM Mandate .................................................................................................... 14
7.2 Incompatibility ............................................................................................................... 14
7.2.1 Environment ............................................................................................................ 15
7.2.2 Incomplete Cost Information .................................................................................. 15
7.3 High Setup Cost ............................................................................................................. 15
7.4 BIM 5D Designer's Knowledge ..................................................................................... 15
7.5 Legal Factor.................................................................................................................... 15


iii | P a g e

, GROUP 1 - BIM use in Estimating

7.6 Other limitations............................................................................................................. 16
8 Future Trend.......................................................................................................................... 16
8.1 BIM Mandate Establishment.......................................................................................... 16
8.2 Market Demand .............................................................................................................. 16
8.3 BIM Education ............................................................................................................... 16
8.3.1 BIM Certification .................................................................................................... 17
8.3.2 BIM 5D Showcase Competition ............................................................................. 17
8.3.3 Continuous Learning ............................................................................................... 17
8.3.4 BIM Online Learning .............................................................................................. 17
8.4 Stakeholders Collaboration ............................................................................................ 17
9 Conclusions ........................................................................................................................... 17
10 References............................................................................................................................. 19


List of Figures
Figure 1. Realization process of building lifecycle management ................................................... 3
Figure 2. Current cost estimating workflow at the construction company ..................................... 8
Figure 3. Proposed cost estimating process .................................................................................... 9
Figure 4. New framework ............................................................................................................. 12
Figure 5. Framework..................................................................................................................... 13
Figure 6. Causes of Incompatibility (Xu, 2019) ........................................................................... 14

List of Table
Table 1. Levels of estimating and difficulty ................................................................................ 10




iv | P a g e

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
24 maart 2023
Aantal pagina's
23
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
xxxxxx1

Maak kennis met de verkoper

Seller avatar
xxxxxx1 University of Toronto
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3
Lid sinds
3 jaar
Aantal volgers
2
Documenten
44
Laatst verkocht
10 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen