1. Question : (TCO B) Three-point
estimate: The SuperFlyer
Corporation is developing a
revolutionary flying disc.
The new toy can fly straight
over a great distance, which
is exciting by itself.
However, this disc will
also return to the
owner in response to
their voice!
Because this is an advance
over anything that this
company has done before,
estimating
the amount and cost of the
hi- tech materials are
difficult. The project
manager recommends
using a range estimating
process to develop an
estimate. The values below
are submitted by the
project team.
Current estimates for
cost of material are as
follows:
Optimistic cost of smart
$5.00 resin:
Most likely cost of smart
$6.00 resin:
Pessimistic cost of smart
$7.50 resin:
Current estimates for
total material
requirements are as
This study source was downloaded by 100000861168648 from CourseHero.com on 04-07-2023 14:20:48 GMT -05:00
https://www.coursehero.com/file/8526778/Quiz-1/
, follows:
Optimistic
quantity Most
likely quantity
Pessimistic
quantity
This study source was downloaded by 100000861168648 from CourseHero.com on 04-07-2023 14:20:48 GMT -05:00
https://www.coursehero.com/file/8526778/Quiz-1/
Grading Summary
These are the automatically computed results of Date Taken: 8/2/2013
your exam. Grades for essay questions, and Time Spent: 1 h , 42 min , 58 secs
comments from your instructor, are in the "Details" Points (97.5%)
section below.
Received:
Question Type: # Of Questions: # Correct:
Essay 5 N/A
Grade Details - All Questions
1. Question : (TCO B) Three-point
estimate: The SuperFlyer
Corporation is developing a
revolutionary flying disc.
The new toy can fly straight
over a great distance, which
is exciting by itself.
However, this disc will
also return to the
owner in response to
their voice!
Because this is an advance
over anything that this
company has done before,
estimating
the amount and cost of the
hi- tech materials are
difficult. The project
manager recommends
using a range estimating
process to develop an
estimate. The values below
are submitted by the
project team.
Current estimates for
cost of material are as
follows:
Optimistic cost of smart
$5.00 resin:
Most likely cost of smart
$6.00 resin:
Pessimistic cost of smart
$7.50 resin:
Current estimates for
total material
requirements are as
This study source was downloaded by 100000861168648 from CourseHero.com on 04-07-2023 14:20:48 GMT -05:00
https://www.coursehero.com/file/8526778/Quiz-1/
, follows:
Optimistic
quantity Most
likely quantity
Pessimistic
quantity