SAFe 4 Advanced Scrum Master (4.5) PRACTICE TEAM (70% Passing)
Which statement is true about the phase-gate milestone model and risk reduction? Answer is 'A' A. It does not mitigate risk as intended B. It creates large batches of requirements C. It reduces pr oduct increment values D. It helps to visualize and limit WIP When does the Inspect and Adapt event happen? Answer is 'D' A. At the end of the System Demo B. At the end of every two weeks C. At the end of the second day of PI Planning D. At the end of each PI Who reviews the top capabilities for the upcoming PI? Answer is 'C' A. Project Manager B. Solution Architect/Engineer C. Solution Management D. Project Owner Why should team members continuously and actively engage with other teams during PI Planning? Answer is 'C' A.To manage dependencies and resolve impediments B. To understand how the other team is working C. To foster an environment of capacity and velocity D. To create a backlog of features the team can adopt Show Less
Geschreven voor
- Instelling
- South University
- Vak
- SAFe Scrum Master
Documentinformatie
- Geüpload op
- 11 april 2023
- Aantal pagina's
- 17
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
safe 4 advanced scrum master 45 practice team 70 passing