SAFe 5 Advanced Scrum Master Test with all Answers correct
SAFe 5 Advanced Scrum Master Test with all Answers correct How does a Scrum Master lead a team's in relentless improvement? An effective decision-making framework provides which two ultimate outcomes? What are two Release Train Enginner responsibilities? What is one way to improve the skills of a team member? Who should vote on root causes? One of the Scrum Master's main responsibilities is to communicate with management and outside stakeholders to hel the team in what way? A team's Product Owner (PO) takes an unexxpected leave of absence for the last week of the Iteration. Trhee of the team's Sotires have been completed and are waiting to be accepted. The Scrum Master asks the Product Manager (PM) to attend the Iteration Review and accept the Sotires. The PM responds that he is not familiar enough with the intent to feel comfortable accepting these responsabilities. He suggest keeping the iteration open for additional week and waiting for the PO to come back. What should the team's Scrum Master do? The Agile Team need to learn or acquire new skills. Where is this list of skills found? Who participates in the Inspect and Adapt event? What are three Interation Retrospective anti-patterns? What are two examples of tasking anti-patterns? (Choose two.) Wich two actions enhance an Agile Release Train's performance? How does the Scrum Master hel teams address the challenges of modern Enterprises? What is the skill type Scrum Masters try to get the Agile Team to achieve? One state on the team Kaban board has people waiting while the previous stage is overloaded. What should the Scrum Master consider doing? How can learning Milestones be used? CORRECT ANSWERS To test the conecpt of a new Feature or Capability What is one Extreme Programming (XP) rule adopted in SAFe? Why are SAFe Scrum Masters challenged differently in a Enterprise? SAFe Scrum Master interact with wich level(s) of Framework? Wich tow events explicity implement the Lean-Agile Mindset of relentless improvement? Who is responsible for assisting to establish Continuous Integration in SAFe? What is the connection between feedback and optimun batch size? During Iteration Review, the team decides to carry forward three Stories to the next iteration. This is the second time during this PI that some of the team's Stories are carried over. What are two actions the Scrum Master should take? Who reviews the top Capabilities for the upcoming PI? Wich statement describes how Kanban teams handle capacity during PI Planning? Which technique is used to identify root causes during the problem-solving workshop? What are two key areas a team should be organized aroung? What anti-pattern can emerge during the Scrum of Scrums? A team achieved less than 80% predictability during the quantitative measurement of the Inspect and Adapt event. What would be an unacceptable action for this team's Scrum Master take? In complex systems development, what do local integration points ensure? Wich SAFe organizational construct allows businesses to build large and complex systems wich require hundreds of people in a Lean-Agile manner? Achieving the goals of Release on Demand requires an understanding of how to decouple what? What improves collaboration between Scrum Masters and System Architects, System Teams and Operations? What is the most effective way to estabilish Built-in Quality? What action should be taken on relentless improvement backlog items from the problem-solving worshop? How do Kanban Teams implement the SAFe Lean-Agile mindset of relentless improvement? Wich SAFe configuration requires having a Vision? What are two typical anti-patterns with Product Owners (POs)? What is a recommended Story-Splitting technique for Agile Teams? What is the first step in the problem-solving workshop? What are three benefits a community of practice offers? (Choose three.) What provides objective evidence that the system is iterating? Wich statement is tru about the phase-gate Milestone model? Wich pilar of the SAFe House of Lean supports not imposing wishful thinking? Considering individual skill sets, an E-shaped person has a combination of what? When does the Inspect and Adapt event happen? During PI Planning, the scrum of scrums meetings help accomplish which two actions? What is one characteristic of an effective Agile Team?:
Geschreven voor
- Instelling
- South University
- Vak
- SAFe Scrum Master
Documentinformatie
- Geüpload op
- 12 april 2023
- Aantal pagina's
- 22
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
safe 5 advanced scrum master test with all answers correct
-
safe 5 advanced scrum master
-
how does a scrum master lead a teams in relentless improvement
-
an effective decision making framework provi
Ook beschikbaar in voordeelbundel