Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Overig

CVEN4051B remedial option report University of New South Wales CVEN 4051

Beoordeling
-
Verkocht
-
Pagina's
30
Geüpload op
14-04-2023
Geschreven in
2022/2023

BOTANY INDUSTRIAL PARK REMEDIAL ACTION PLAN 2020 Jaehyeok Lee z University of NSW Conten 1. Introduction............................................................................................................4 1.1 Introduction..................................................................................................4 1.2 Scope............................................................................................................4 1.3 Feasibility Assessment Structure..................................................................4 2. Site setting................................................................................................................5 2.1 Site Identity..................................................................................................5 2.1.1 Site description.......................................................................................5 2.1.2 Site history.............................................................................................6 2.1.3 Site Surrounding area.............................................................................6 2.2 Site Environmental setting...........................................................................6 2.2.1 Climate...................................................................................................7 2.2.2 Geology..................................................................................................7 2.2.3 Topography/ Hydrology...........................................................................8 2.3 Hydrogeology...............................................................................................8 2.3.2 Groundwater flow history..........................................................................8 2.4 Sensitive environmental receptors............................................................9 3. CSM...........................................................................................................................9 3.1 Contaminants of potential concern (COPC)..................................................9 3.1.1 Source of contamination.........................................................................9 3.2 Nature of the Contamination......................................................................10 3.2.1 Vapour phase.......................................................................................10 3.2.2 Aqueous phase.....................................................................................10 3.2.3 Solid phase...........................................................................................10 3.2.4 DNAPL phase........................................................................................10 3.3 Environmental media.................................................................................10 3.4 Exposure pathways....................................................................................11 3.5 Potential Receptors.....................................................................................11 3.6 Risk assessment on human health.............................................................11 3.7 Risk assessment on environment...............................................................11 4. Development/Assessment of remediation options.................................................12 4.1 Remediation objective................................................................................12 4.2 Remediation goal........................................................................................12 4.3 Site-Specific Protection Requirements(SSPR).............................................12 4.4 Methodology long-list.................................................................................13 4.5 Preliminary screening assessment.............................................................14 4.5 Feasibility assessment................................................................................15 4.5.1 Nano-remediation(nZVI).......................................................................15 4.5.2 Electrokinetic Separation(ES)...............................................................18 4.5.3 Surfactant enhanced aquifer remediation(SEAR).................................20 4.6 Preferred Remediation option.....................................................................22 5.Validation.................................................................................................................23 6.References...............................................................................................................24 Y Figure 1 Site Location....................................................................................................5 Figure 2 Mean total monthly rainfall.............................................................................7 Figure 3 Long-term rainfall pattern...............................................................................7 Figure 4 Current estimated flow direction and hydraulic head (Orica Botany, 2017)...9 Figure 5 extent of contamination (Orica Botany, 2017)..............................................13 Figure 6 Electrokinetic separation (FRTR, -)................................................................18 Figure 7 Areas where clay comprises 10% (Orica Botany, 2017)............................22 Table 1 BIP site description...........................................................................................5 Table 2 Southland blocks site description.....................................................................5 Table 3 Conceptual groundwater flow regime over period...........................................8 Table 4 BCR comparison..............................................................................................22 1. Introduction 1.1 Introduction This document is created to provide various remediation options and set up the remediation strategies for the BIP to protect the human health and environment around the model area. Orica was announced by The NSW Environmental protection Authority(EPA) to clean up the contaminated land. Orica investigated and assessed the model area and created a Conceptual Site Model (CSM). The CSM provided by Orica[CITATION Ori17 l 1042 ] has widely contributed over this document to develop the remediation objectives and to setup the remediation goals. This document contains assessment of number of possible methodologies in

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

BOTANY INDUSTRIAL
PARK REMEDIAL
ACTION PLAN
2020




Jaehyeok Lee z5108344
University of NSW

,Conten
1. Introduction............................................................................................................4
1.1 Introduction.................................................................................................. 4
1.2 Scope............................................................................................................ 4
1.3 Feasibility Assessment Structure..................................................................4
2. Site setting................................................................................................................5
2.1 Site Identity.................................................................................................. 5
2.1.1 Site description....................................................................................... 5
2.1.2 Site history............................................................................................. 6
2.1.3 Site Surrounding area............................................................................. 6
2.2 Site Environmental setting...........................................................................6
2.2.1 Climate................................................................................................... 7
2.2.2 Geology.................................................................................................. 7
2.2.3 Topography/ Hydrology...........................................................................8
2.3 Hydrogeology............................................................................................... 8
2.3.2 Groundwater flow history..........................................................................8
2.4 Sensitive environmental receptors............................................................9
3. CSM...........................................................................................................................9
3.1 Contaminants of potential concern (COPC)..................................................9
3.1.1 Source of contamination.........................................................................9
3.2 Nature of the Contamination......................................................................10
3.2.1 Vapour phase....................................................................................... 10
3.2.2 Aqueous phase..................................................................................... 10
3.2.3 Solid phase........................................................................................... 10
3.2.4 DNAPL phase........................................................................................ 10
3.3 Environmental media.................................................................................10
3.4 Exposure pathways.................................................................................... 11
3.5 Potential Receptors..................................................................................... 11
3.6 Risk assessment on human health.............................................................11
3.7 Risk assessment on environment...............................................................11
4. Development/Assessment of remediation options.................................................12
4.1 Remediation objective................................................................................ 12
4.2 Remediation goal........................................................................................ 12
4.3 Site-Specific Protection Requirements(SSPR).............................................12
4.4 Methodology long-list.................................................................................13

, 4.5 Preliminary screening assessment.............................................................14
4.5 Feasibility assessment................................................................................15
4.5.1 Nano-remediation(nZVI).......................................................................15
4.5.2 Electrokinetic Separation(ES)...............................................................18
4.5.3 Surfactant enhanced aquifer remediation(SEAR).................................20
4.6 Preferred Remediation option.....................................................................22
5.Validation.................................................................................................................23
6.References...............................................................................................................24
Y

Figure 1 Site Location....................................................................................................5
Figure 2 Mean total monthly rainfall.............................................................................7
Figure 3 Long-term rainfall pattern...............................................................................7
Figure 4 Current estimated flow direction and hydraulic head (Orica Botany, 2017)...9
Figure 5 extent of contamination (Orica Botany, 2017)..............................................13
Figure 6 Electrokinetic separation (FRTR, -)................................................................18
Figure 7 Areas where clay comprises > 10% (Orica Botany, 2017)............................22


Table 1 BIP site description...........................................................................................5
Table 2 Southland blocks site description.....................................................................5
Table 3 Conceptual groundwater flow regime over period...........................................8
Table 4 BCR comparison..............................................................................................22

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 april 2023
Aantal pagina's
30
Geschreven in
2022/2023
Type
OVERIG
Persoon
Onbekend

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ExamsConnoisseur Self
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
587
Lid sinds
3 jaar
Aantal volgers
344
Documenten
1492
Laatst verkocht
1 maand geleden

4.2

68 beoordelingen

5
40
4
11
3
13
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen