Field Installation Guide
Outlines the procedure to follow in order to successfully perform an install
Services kits
download them on the Nutanix share point page
Pre-delivery questions to be verified
BOM, Cables, Scope, Statement of work, Level of effort
verify assumptions
1. Work during business hours
2. Network admin available on call
Verify Go/No Go Criteria
1. Power, racks ready
2. Network cabling ready
3. Network switch ports configured
Verify Exclusions
1. Configuring/troubleshooting network
Post-delivery - Deliverables
1. As-built documentation
2. Updated configuration worksheet
3. Validation test documentation
4. Best Practices
5. Knowledge Transfer
Number of nodes to form a cluster
3 nodes minimum
Where to bare metal Platform-wise
1. Foundation VM
2. Portable Foundation
How should VM network be set
Bridged