Construction Management Final Exam Over 60 Questions and Answers 100% Verified Why are the MSDS so important for workers to read at the job site? Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: Testing standards Which of the following is NOT an item of personal protective equipment that might be used by workers on the jobsite? Hardhat, Gloves Which of the following is NOT a type of personal protection equipment? Skin Protection Which of the following does NOT describe preparatory inspections? Preparatory inspections are never done by personnel employed by the contractor Which of the following are primary cause of injuries in the construction industry? Slips Trips and Falls, Being crushed or trapped, Electrical shocks Which of the following are primary component of an effective safety management plan? Substance abuse, Hazardous material communications, Personal protection Which Federal agency is responsible for establishing safety standards and enforcing them through inspections conducted at construction jobsites? OSHA Which quality control mechanism are mandated by the construction contract and used to check for conformance to the plans and specifications? submittals, mock ups, shop drawings Which of the following shows the general relationship between the level of quality and cost? when quality increases, cost increases All of the following are fundamental objectives of a quality management plan: Do things right the first time, Prevent things from going wrong, Continually improve the process What is an FOR? A report used to track questionable quality and safety performance on the jobsite Which of the following is a difference between quality control and quality assurance? Quality control happens at the project level while quality assurance happens at the process level

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Construction Management Final Exam Over 60 Questions
and Answers 100% Verified
Why are the MSDS so important for workers to read at the job site?
Material Safety Data Sheet provide important knowledge on how to work with toxic
materials at the job site.
Quality assurance includes all of the following practices EXCEPT:
Testing standards
Which of the following is NOT an item of personal protective equipment that
might be used by workers on the jobsite?
Hardhat, Gloves
Which of the following is NOT a type of personal protection equipment?
Skin Protection
Which of the following does NOT describe preparatory inspections?
Preparatory inspections are never done by personnel employed by the contractor
Which of the following are primary cause of injuries in the construction industry?
Slips Trips and Falls, Being crushed or trapped, Electrical shocks
Which of the following are primary component of an effective safety management
plan?
Substance abuse, Hazardous material communications, Personal protection
Which Federal agency is responsible for establishing safety standards and
enforcing them through inspections conducted at construction jobsites?
OSHA
Which quality control mechanism are mandated by the construction contract and
used to check for conformance to the plans and specifications?
submittals, mock ups, shop drawings
Which of the following shows the general relationship between the level of quality
and cost?
when quality increases, cost increases
All of the following are fundamental objectives of a quality management plan:
Do things right the first time, Prevent things from going wrong, Continually improve the
process
What is an FOR?
A report used to track questionable quality and safety performance on the jobsite
Which of the following is a difference between quality control and quality
assurance?
Quality control happens at the project level while quality assurance happens at the
process level
The name of the testing agency for construction in the United States is:
ASTM
What is not the concept behind a zero-punch list?
Complete the final walk-through with as many of the punch items noted on the list, To
have no change orders on the project, Please every expectation of the owner
What is the cost code chart usually made up of?
activity, code, project number

, What is the riskiest element of the project control and project planning?
estimating productivity
Periodic predictions stated in reports as to the final cost and schedule outcomes
on a project while the work is still going on are known as:
forecasts
What is an example of a factor that can impact project performance?
Defective Material, Hurricane in your project area,
Overcrowded Job sites
What is NOT an escalation clause?
It is a clause that covers when the truck can deliver building materials,

It is the same thing as a contingency and tries to account for unforeseen conditions,

It is a clause that covers risks associated with underground utilities, grading, and
excavation
What is the essential(s) of an effective project control system?
Quality Information , Good Reporting system
What does it mean to crash the schedule?
To compress the overall schedule by accelerating certain activities within it so that they
finish sooner
What does it mean to forecast in project management?
To predict the final cost and schedule outcomes on a project while the work is still in
progress
What are the three primary tracking elements when monitoring project
performance?
Quality, Cost, and Time
What is not one of the fundamental steps that is included in the project control
cycle?
update technology
The cost or time difference between the actual project performance and the
planned project performance is the definition of what?
variance
What is NOT an example of a source where you might gather field information
needed to develop your project controls?
requests for information
All of the following are TRUE regarding project activities except?
Used to keep track of your progress on the job
The two types of schedules introduced in this chapter are?
Gantt charts and Network Diagrams
Long lead items that fall into procurement activities include all of the following ?
Custom Lighting Fixtures,
Custom Cabinets ,
Custom Carpets
Gantt Charts are used to:
Show overall length of the project and each activity
What is one type of Network Diagram?

Geschreven voor

Vak

Documentinformatie

Geüpload op
8 mei 2023
Aantal pagina's
11
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ACADEMICAIDSTORE Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1214
Lid sinds
4 jaar
Aantal volgers
892
Documenten
12023
Laatst verkocht
21 uur geleden
ACADEMICAID STORE

Welcome to ACADEMICAID store! We specialize in reliable test banks, exam questions with verified answers, practice exams, study guides, and complete exam review materials to help students pass on the first try. Our uploads support Nursing programs, professional certifications, business courses, accounting classes, and college-level exams. All documents are well-organized, accurate, exam-focused, and easy to follow, making them ideal for quizzes, midterms, finals, ATI & HESI prep, NCLEX-style practice, certification exams, and last-minute reviews. If you’re looking for trusted test banks, comprehensive exam prep, and time-saving study resources, you’re in the right place.

Lees meer Lees minder
4.1

176 beoordelingen

5
98
4
29
3
28
2
6
1
15

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen