DBIA: Principles of Design-Build and Post Award & Contracts Study Guide with complete solution

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A
Geüpload op
09-05-2023
Geschreven in
2022/2023

DBIA: Principles of Design-Build and Post Award & Contracts Study Guide with complete solution Miller Act 1935 Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 Bill directing A/E's selected on qualifications, what year? Clinger Cohen Act/Defense Procurement Reform Act 1996 Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Standard of Care The level of quality that any average Design Professional would be able to perform given the circumstances. Design Bid Build Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), Multi Prime Project Delivery - Many contracts through Owner CM at Risk Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. Design Build Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Low Bid Procurement Method - Most Familiar Negotiated (Qualifications Based) Procurement Method - Common for A/E Best Value Procurement Method - Qualifications and Price Sole Source Procurement Method - Direct Lump Sum Contract Format w/ agreed upon fixed price Cost Plus Fee Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage GMP (Guaranteed Maximum Price) Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. Unit Price Contract Format - cost per piece Target Price

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

DBIA: Principles of Design-Build and Post Award &
Contracts Study Guide with complete solution
Miller Act 1935
Federal Government passed bond requiring payment and performance bonds on all
public works, what year?
Brooks Bill 1972
Bill directing A/E's selected on qualifications, what year?
Clinger Cohen Act/Defense Procurement Reform Act 1996
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build.
Standard of Care
The level of quality that any average Design Professional would be able to perform
given the circumstances.
Design Bid Build
Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they
want),
Multi Prime
Project Delivery - Many contracts through Owner
CM at Risk
Project Delivery method allowing the contractor to come on board very early in design
for preconstruction services yet maintains separation between Designer and Builder
contractually.
Design Build
Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages.
Low Bid
Procurement Method - Most Familiar
Negotiated (Qualifications Based)
Procurement Method - Common for A/E
Best Value
Procurement Method - Qualifications and Price
Sole Source
Procurement Method - Direct
Lump Sum
Contract Format w/ agreed upon fixed price
Cost Plus Fee
Contract Format - contractor reimbursed for actual cost plus an agreed upon
percentage
GMP (Guaranteed Maximum Price)
Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual
cost plus a fee only up to a certain amount.
Unit Price
Contract Format - cost per piece
Target Price

, Contract Format - established cost/benchmark determined jointly by project team.
Trust, Flexibility
Successful Design Build requires _____ & _______ between participants
Hammurabi
Singular responsibility for both design & construction was first codified by ____
Bridging Documents
Owner provided items such as 20% design or more and provides prescriptive specs at
RFP.
Spearin Doctrine
Owner is responsible for implied warranties in the sufficiency of the specifications.
Performance Requirements
____ ____ should identify end results.
Design Build
Single point of responsibility for both design & construction is an attribute of what
delivery method?
Substantiation
The process of checking milestones along the way for completeness.
Prescriptive
Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance.
False
T/F Detailed estimating is the Building systems approach to estimating
False
T/F feasibility estimate is cost model and establishes budget for project
True
T/F key element of quality assurance is keeping communication lines open between
owner and DB
True
T/F in Design/cost relationship of DB, the constructor establishes design parameters for
architect
False
T/F trust is most important thing for DB
Schematic estimating
DB estimating sequence where 15%-20% of design is completed
Trend logs
Provides baseline budgets and schedules and list estimate trends
Committed Design
Drawings and specs are approved by DOR and confirmed within budget
Coordinating owner design reviews and approvals
What is NOT a design managers role?
Design Build Team
Who is responsible for ensuring quality assurance?
Direct DB
When programming and design is developed by DB entity
Spearin Doctrine

Geschreven voor

Vak

Documentinformatie

Geüpload op
9 mei 2023
Aantal pagina's
7
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
magdamwikash23 Western Governers University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
114
Lid sinds
3 jaar
Aantal volgers
94
Documenten
5328
Laatst verkocht
1 week geleden
Magda

NURSING STUDY GUIDES/EXAMS AND NOTES ALL VERIFIED BY EXPERTS All my uploaded documents, exams and essays are verified by relevant experts.I can assure an A or at least 90% if you use any of my documents.

3.9

14 beoordelingen

5
7
4
2
3
2
2
2
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen