Bailey Bridge PE exam 2023 with 100% correct answers
Task 1: Which of the following are details included within the bridge assembly party? all Task 2: Which duties are each assembly party detail responsible for completing? Decking Detail b. Lay stringers, chess, and ribbands on bridge Transom Detail a. Carry, place and clamp down transoms Bracing Detail c. Obtain, install, and adjust sway braces, rakers, and bracing frames Panel Detail d. Carry, place and pin together panels in the launching nose and bridge Task 3: Each unloading party consists of one noncommissioned officer and ___ soldiers. 8 Task 1: In what order should your unit assemble the launching nose of the bridge? place panels connect second bay place sway braces rocking rollers When placing the panels on the ground behind the rocking rollers, should the female or male ends be placed forward? female Once the panel pins have been inserted, where on the panels are the transoms clamped? behind forward uprights What is used to secure the front end of the assembled bays onto the rocking rollers? steel pickets Task 1: In what order should your unit construct the first bay of the bridge? connect panels of inner truss to launching nose add outer truss panels insert 2nd and 3rd transoms add 2nd pay panels position stringers and tighten sway brace position 3rd bay panels loosely fix sway braces, rakers, and bracing frames tighten first bay bracing and deck first bay
Written for
- Institution
- Bailey Bridge PE
- Course
- Bailey Bridge PE
Document information
- Uploaded on
- May 10, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
bailey bridge pe exam 2023 with 100 correct answers
-
task 1 which of the following are details included within the bridge assembly party
-
task 2 which duties are each assembly party detail responsib