CONSTRUCTION OF A SINGLE STOREY RESIDENTIAL BUILDING
FERRERAS, BRGY. SUKLAYIN BALER, AURORA
CONSTRUCTION SCHEDULE
Wt. MONTH
ITEM NO. DESCRIPTION
(%) JUNE 1-30, 2022 JULY 1-31, 2022
N/A ACCOMPLISHMENT (%) 38.03% 53.62% 70.91%
A.1.1 (3) Construction of Field Office for the Engineer 3.39%
B.1 Offices, Shops, Stores And Workmens Accommodation 10.35%
B.3 Permits and Clerance 10.34%
B.5 Project Billboard /Signboard 1.12%
B.7(2) Occupational Safety and Health Program 0.52%
B.9 Mobilization/Demobilization 3.82%
801(1) Removal of Structure and Obstruction 1.46%
803(1) a Structure Excavation (Common Soil) 0.62%
804(1)a Embankment for Structural Excavation 0.29%
804(4) Gravel Fill 0.23%
900(1)c2 STRUCTURAL CONCRETE (FOOTING, CLASS A, 28 DAYS) 2.38%
900(1)c4 Structural Concrete (Columns), Class A, 28 days 1.06%
900(1)c6 Structural Concrete (Beams/Girders) 2.30%
902(1) Reinforcing Steel (Deformed), Grade 40 2.83%
903(2) Formworks and Falseworks 14.2%
1001(6) Catch Basin (Concrete) 0.06%
1001(8) Sewer Line Works 0.26%
1001(11) Septic Vault (Concrete) 0.69 %
1002(5) Plumbing Fixtures 1.83%
1002(6) Cold Waterline pipes and fittings 0.86%
1003(1) Marine Plywood on Metal Frame Ceiling 6.0%
1010(2)b Doors(wood panel) 6.33%
1014 Pre painted Metal Sheets (long span) 7.63%
1018(1) Glazed Tiles And Trims 0.44%
1018(2) Unglazed Tiles 0.58%
1027(1) Cement Plaster Finish 4.48%
1032(1) a Painting Works (Masonry Painting) 3.68%
1043(1) PVC Doors and Frames (set) 0.13%
1046(2)a1 CHB Non Load Bearing (including Reinforcing Steel), 150mm 8.71%
1047(2)b Structural Steel Roof Truss 0.41%
10472)c Structural Steel purlins 0.48%
1047(3)b Metal Structure Accessories, Sagrod 0.04%
1100(1) Conduits, Boxes and Fittings 1.02%
FERRERAS, BRGY. SUKLAYIN BALER, AURORA
CONSTRUCTION SCHEDULE
Wt. MONTH
ITEM NO. DESCRIPTION
(%) JUNE 1-30, 2022 JULY 1-31, 2022
N/A ACCOMPLISHMENT (%) 38.03% 53.62% 70.91%
A.1.1 (3) Construction of Field Office for the Engineer 3.39%
B.1 Offices, Shops, Stores And Workmens Accommodation 10.35%
B.3 Permits and Clerance 10.34%
B.5 Project Billboard /Signboard 1.12%
B.7(2) Occupational Safety and Health Program 0.52%
B.9 Mobilization/Demobilization 3.82%
801(1) Removal of Structure and Obstruction 1.46%
803(1) a Structure Excavation (Common Soil) 0.62%
804(1)a Embankment for Structural Excavation 0.29%
804(4) Gravel Fill 0.23%
900(1)c2 STRUCTURAL CONCRETE (FOOTING, CLASS A, 28 DAYS) 2.38%
900(1)c4 Structural Concrete (Columns), Class A, 28 days 1.06%
900(1)c6 Structural Concrete (Beams/Girders) 2.30%
902(1) Reinforcing Steel (Deformed), Grade 40 2.83%
903(2) Formworks and Falseworks 14.2%
1001(6) Catch Basin (Concrete) 0.06%
1001(8) Sewer Line Works 0.26%
1001(11) Septic Vault (Concrete) 0.69 %
1002(5) Plumbing Fixtures 1.83%
1002(6) Cold Waterline pipes and fittings 0.86%
1003(1) Marine Plywood on Metal Frame Ceiling 6.0%
1010(2)b Doors(wood panel) 6.33%
1014 Pre painted Metal Sheets (long span) 7.63%
1018(1) Glazed Tiles And Trims 0.44%
1018(2) Unglazed Tiles 0.58%
1027(1) Cement Plaster Finish 4.48%
1032(1) a Painting Works (Masonry Painting) 3.68%
1043(1) PVC Doors and Frames (set) 0.13%
1046(2)a1 CHB Non Load Bearing (including Reinforcing Steel), 150mm 8.71%
1047(2)b Structural Steel Roof Truss 0.41%
10472)c Structural Steel purlins 0.48%
1047(3)b Metal Structure Accessories, Sagrod 0.04%
1100(1) Conduits, Boxes and Fittings 1.02%