Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CATEGORY 3 NON-CAB OPERATED TEST 2023 SCORED 94%

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
14-06-2023
Geschreven in
2022/2023

CATEGORY 3 NON-CAB OPERATED TEST 2022 WITH COMPLETE SOLUTION;(THIS'LL GET YOU AT LEAST A 94 ON THE TEST) Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes Category 2 The expiration date that is of particular importance to crane operators is The certification expiration date of the crane Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness crane operator A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. Category 3 Components that control, restrain, or position the load, and upon failure would cause dropping, shifting or uncontrolled movement of the loads are ____________. load controlling parts All of the following require a license to operate EXCEPT a: Non-cab operated category 3-bridge crane What is two-blocking and why is two-blocking dangerous? Two-blocking occurs when the hook block comes in contact with the upper sheave block during hoisting of the hook. It is dangerous because it could result in damage to the crane, parting of the hoist lines, and dropping the load. The formula for determining the area of a triangular shaped object is: Base x Height divided by 2 When are operators required to perform a pre-use check of the crane? Prior to the first use of the crane each day. Regardless of the method of communication used all crane signals must be ____________________. clear Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees Fahrenheit. True If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object? 120 cubic feet Is it necessary for the operator to see the load or work area? Not if there is a designated signal person who is in control of the lift and is in view of the operator, or if the signal giver is in constant radio contact with the operator. What is "inching"? Performing a motion very slowly, a little at a time The majority of crane accidents are attributed to which of the following? Personnel error

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CATEGORY 3 NON-CAB OPERATED TEST 2022 WITH
COMPLETE SOLUTION;(THIS'LL GET YOU AT
LEAST A 94 ON THE TEST)
Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as
______ cranes
Category 2
The expiration date that is of particular importance to crane operators is
The certification expiration date of the crane
Who is primarily responsible for evaluating a Crane Operators physical and
emotional fitness
crane operator
A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane.
Category 3
Components that control, restrain, or position the load, and upon failure would
cause dropping, shifting or uncontrolled movement of the loads are
____________.
load controlling parts
All of the following require a license to operate EXCEPT a:
Non-cab operated category 3-bridge crane
What is two-blocking and why is two-blocking dangerous?
Two-blocking occurs when the hook block comes in contact with the upper sheave block
during hoisting of the hook. It is dangerous because it could result in damage to the
crane, parting of the hoist lines, and dropping the load.
The formula for determining the area of a triangular shaped object is:
Base x Height divided by 2
When are operators required to perform a pre-use check of the crane?
Prior to the first use of the crane each day.
Regardless of the method of communication used all crane signals must be
____________________.
clear
Synthetic web slings should NOT be used in areas where temperatures exceed
194 degrees Fahrenheit.
True
If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the
object?
120 cubic feet
Is it necessary for the operator to see the load or work area?
Not if there is a designated signal person who is in control of the lift and is in view of the
operator, or if the signal giver is in constant radio contact with the operator.
What is "inching"?
Performing a motion very slowly, a little at a time
The majority of crane accidents are attributed to which of the following?
Personnel error

, Crane operators at naval activities may be required to operate various types of
cranes for which they hold a license. Which of the following can best assure
operator proficiency and safety?
Be familiarized by a qualified person before operating the crane for the first time
Which of the following is NOT an acceptable method of communication between
the signal person and the crane operator?
Signal Flags
Which of the following is used with a physical locking device placed at the energy
source?
Lockout Tag
Which of the following is considered to be the best way the operator can ensure
the crane is safe to operate on any given day?
Perform Daily Pre-use Checks
When crane accidents happen, you must do all of the following EXCEPT:
Continue to operate the crane until all lifts are completed
Components that provide protection for operation and maintenance personnel
working on or in the path of cranes.
General Safety Devices
If the crane operator and the rigger in charge disagree on whether or not a load is
safe to lift the operator should:
not operate the crane until contacting the supervisor to resolve the issue.
Components that support the load, and upon failure would cause dropping or
uncontrolled lowering of the load are ____________.
load bearing parts
What is meant by "skewing"?
Where one end of the bridge gets ahead of the other end, frequently causing binding on
the rails.
What are the principal parts of an overhead traveling crane?
Bridge girders, end trucks, trolley, and operator's cab or pendant control
Why shall sudden starts and stops of the bridge and trolley be avoided?
Sudden starts and stops could cause the trolley or bridge to derail
Select the proper method of landing a load.
Lower the load slowly, stop a few inches from the landing point, then slowly lower the
rest of the way.
The crane operator must check the certification information on the crane
for________ before operating the crane.
certification expiration date, crane ID, and certified capacity
What is the bridge crane communications hand signal pictured, with the palms
up, fingers closed; thumb pointing in the direction of motion, and jerking
horizontally?
Trolley travel
At what point during a lift may trolley or bridge travel be started?
When the tracks are clear and the load is high enough off the ground to pass over
obstacles safely

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 juni 2023
Aantal pagina's
5
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LECTMAGGY Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
146
Lid sinds
3 jaar
Aantal volgers
121
Documenten
6314
Laatst verkocht
2 weken geleden
LECTMAGGY

Here, you will find everything you need in NURSING EXAMS AND TESTBANKS.Contact us, to fetch it for you in minutes if we do not have it in this shop.BUY WITHOUT DOUBT!!!!Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3.3

28 beoordelingen

5
8
4
3
3
11
2
0
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen