Contracts, Project Delivery With Complete Solution
Clinger Cohen Act/Defense Procurement Reform Act 1996
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build. What Year?
Standard of Care
The level of quality that any average Design Professional would be able to perform
given the circumstances.
Design Build
Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages.
Negotiated (Qualifications Based)
Procurement Method - Common for A/E
GMP (Guaranteed Maximum Price)
Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual
cost plus a fee only up to a certain amount.
Unit Price
Contract Format - cost per piece
Trust, Flexibility
Successful Design Build requires _____ & _______ between participants
Hammurabi
Singular responsibility for both design & construction was first made into a building code
by ____
Bridging Documents
Owner provided items such as 20% design or more and provides prescriptive specs at
RFP.
Design Build
Single point of responsibility for both design & construction is an attribute of what
delivery method?
Substantiation
The process of checking milestones along the way for completeness.
Prescriptive
Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance.
False
T/F Detailed estimating is the Building systems approach to estimating
False
T/F feasibility estimate is cost model and establishes budget for project
True
T/F key element of quality assurance is keeping communication lines open between
owner and DB
True
T/F in Design/cost relationship of DB, the constructor establishes design parameters for
architect
, False
T/F trust is most important thing for DB
Schematic estimating
DB estimating sequence where 15%-20% of design is completed
Trend logs
Provides baseline budgets and schedules and list estimate trends
Coordinating owner design reviews and approvals
What is NOT a design managers role?
Design Build Team
Who is responsible for ensuring quality assurance?
Weighted criteria
Awarded to proposer with highest combined total points of technical and price proposals
Conceptual estimating
Estimate provided with very little design
Trend estimating
Maintains control of budget and design process between major estimate phases
Feasibility estimate
Owner proforma based on sq ft or ROM estimates
Statement of qualifications
Determines if proposer is qualified for project with yes or no statement
DBIA 501
Contract for Design-Build Consultant Services
DBIA 520
Standard Form of Preliminary Agreement Between Owner and Design-Builder
DBIA 525
Standard Form of Agreement Between Owner & Design-Builder for a Lump Sum
DBIA 530
Standard Form of Agreement Between Owner & Design-Builder, Cost Plus Fee with an
Option for a Guaranteed Maximum Price
DBIA 535
Standard Form of General Conditions of Contract Between Owner & Design-Builder
DBIA 540
Standard Form of Agreement Between Design-Builder & Design Consultant,
DBIA 550
Standard Form of Agreement Between Design-Builder & General Contractor, Cost Plus
Fee with or without a Guaranteed Maximum Price
DBIA 580
Standard Form of Teaming Agreement Between Design-Builder & Teaming Party
Co-location
The term used to describe the situation where the designers and contractors are placed
in close proximity to one another, often in the same office or jobsite trailer.
Design Reconciliation
The process of managing the design to a set of pre-determined "targets"
ADePT
Technology to assess design value.
Request for Proposals