What is JCIDS (Joint Capabilities Integration and Development System)? - Answer assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System - Answer Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? - Answer Materiel Development Decision What are the two steps in pre-systems acquisition? - Answer Materiel solution analysis and technology development Which milestone is the program initiation? - Answer Milestone B The MDA may authorize entry into the acquistion system at any point? True or False - Answer True What are the most expensive programs? - Answer ACAT IA Who is the single point of accountability for accomplishing program objectives? - Answer program manager What says the DOD may not obligate funds for a major defense acquisition program after the program enters the Engineering and Manufacting phase? - Answer 10 USC 2435 What is systems engineering? - Answer overarching process that a program team applies to transition from a stated capability need to an operationally suitable system. It is the integrating mechanism across the technical efforts Program managers prepare a _________ for each milestone review, beginning with Milestone A. - Answer Systems Engineering Plan (SEP) Integrated Product and Process Development (IPPD) is - Answer mgmt technique that simultaneously integrates all essential acquisition activities through the use of multidisciplinary teams to optimize design, manufacturing and supportability processes. What are the 3 levels of IPT's - Answer Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT) that advise the PM What are the 8 technical management processes? - Answer 1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk Management 6. Configuration Management 7. Data Management 8. Interface Management

Show more Read less
Institution
Course

Content preview

CDFM Module 4 Solved Perfectly And
Graded A+
What is JCIDS (Joint Capabilities Integration and Development System)? - Answer
assesses gaps in military joint warfighting capabilities and recommends solutions to
resolve these gaps

Defense Acquisition System - Answer Process by which DoD acquires weapon
systems and automated information systems

What document provides entry into Milestone A the the Defense Acquisition System?
- Answer Materiel Development Decision

What are the two steps in pre-systems acquisition? - Answer Materiel solution
analysis and technology development

Which milestone is the program initiation? - Answer Milestone B

The MDA may authorize entry into the acquistion system at any point? True or False
- Answer True

What are the most expensive programs? - Answer ACAT IA

Who is the single point of accountability for accomplishing program objectives? -
Answer program manager

What says the DOD may not obligate funds for a major defense acquisition program
after the program enters the Engineering and Manufacting phase? - Answer 10 USC
2435

What is systems engineering? - Answer overarching process that a program team
applies to transition from a stated capability need to an operationally suitable system.
It is the integrating mechanism across the technical efforts

Program managers prepare a _________ for each milestone review, beginning with
Milestone A. - Answer Systems Engineering Plan (SEP)

Integrated Product and Process Development (IPPD) is - Answer mgmt technique
that simultaneously integrates all essential acquisition activities through the use of
multidisciplinary teams to optimize design, manufacturing and supportability
processes.

What are the 3 levels of IPT's - Answer Overachring Integrated Product Team (OIPT)
that oversees entire program, Integrateing Integrated Product Team (IIPT), and
Working Level Integrated Product Team (WIPT) that advise the PM

What are the 8 technical management processes? - Answer 1. Decision Analysis 2.
Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk
Management 6. Configuration Management 7. Data Management 8. Interface
Management

, CDFM Module 4 Solved Perfectly And
Graded A+
What is decision analysis? - Answer provide the basis for evaluating and selecting
alternatives

SEP is a mandated tool for this activity - Answer Technical planning

_______ measures technical progress and the effectiveness of plans and
requirements - Answer technical assessment

What maintains the traceability of all requirements from needs? - Answer
requirements management

_________ is an audit trail of decisions and design modifications - Answer
configuration management

What answers the question of "did you build it right"? - Answer verification

What answers "is this the right solution"? - Answer validation

What is a system of system engineering? - Answer satisfy capabilities thru multiple
and interacting systems. Not to be confused with a "family of systems"

What is the formal entry point into the acquisition process? - Answer Material
Solution Analysis Phase

What is not a decision point but opens the gate if all criteria has been met? - Answer
MDA

Which pases enters approved ICD and study guidance for conducting AOA and is
guided by ICD and AOA plan? - Answer materiel solution analysis phase

Which phase reduces technology risks, determine and mature the appropriate set of
technologies to be integrated into a full system and to demonstrate critical
technologies on prototypes? - Answer technology development phase

The MDA for an MDAP, without the authority to delegate, shall sign a certification
memorandum for record prio to ______________? - Answer Milestone A

What follows the completion of technology development? - Answer Milestone B
decision

The purpose of the _____________ phase is to develop a system or an increment of
capability; complete full system integration; develop an affordable and executable
manufacturing process; ensure operational supportability with particular attention to
minimizing the logistics footprint - Answer EMD (Engineering and Manufacturing
Devlopment)

Written for

Course

Document information

Uploaded on
July 5, 2023
Number of pages
11
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$6.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
PROFICIENTTUTOR

Get to know the seller

Seller avatar
PROFICIENTTUTOR New York University
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
2 year
Number of followers
0
Documents
577
Last sold
1 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions