In the U.S., enforcement of safety work rules resides with:
Occupational Safety & Health Administration
(OSHA)
Utility pruning is the pruning of trees located in the vicinity of power lines for the
purpose of __________ __________ __________.
ensuring reliable service
A comprehensive vegetation management program should be __________ rather
than reactive, & based on principals of __________ vegetation management.
proactive;
integrated
What is a volt?
a unit of electrical force
Major storms or __________ weather events are the usual cause of power
outages over large areas.
catastrophic
Without __________, messages can have multiple meanings.
context
ISA BMPs provide a practical guide for implementing __________ __________.
industry standards
Electrical resistance determines how much __________ is required to move
electricity along a conductor and is measured in __________.
energy;
ohms
When communicating, a person's experience & __________ will influence how the
person reacts.
perceptions
Crew mobilization for a storm event is much more rapid from a __________
status.
standby
NERC standards are specific to what line voltages?
200 kV & above
An important first step in any vegetation management program should be to
asses system conditions, which is often done through an __________.
inventory
Which type of cuts are less unacceptable?
internodal cuts
(e.g. topping)
A worker neglecting to wear cut-resistant chaps while operating a chainsaw is
committing an unsafe __________, while an employer failing to provide chaps is
creating an unsafe __________.
act;
condition
A conductor carrying more than __________ volts would be considered a NERC
line.
,200,000
Communication is both verbal & nonverbal. When a customer is confronted with
contradictory information, the person will usually believe the __________
message.
nonverbal
Voluntary safety standards for pruning, trimming, repairing, maintaining &
removing trees, & cutting brush:
ANSI Z133
NERC standards require the reporting of all tree caused outages by __________
categories
three
A traditional cycle will schedule maintenance __________ trees grow into
conductors.
before
Which type of cuts are more acceptable?
nodal cuts
(e.g. drop-crotch, thinning)
The __________-__________ rule suggests that workers should take time before
starting a job to check for potentially unsafe conditions & discuss them.
two-minute
According to ANSI Z133, the minimum approach distance for persons other than
qualified line-clearance arborists for 50 kV & less is __________.
10 feet
Trees growing into contact with a single-phase distribution conductor pose
__________ threat of a tree-ground fault.
little
Where should the final cut be made for proper utility pruning?
just outside of the branch bark ridge and the branch collar
A vegetation management scheduling unit may be an entire __________ or a
__________ __________.
circuit;
geographical area
2 examples of protective equipment:
circuit breakers
lightning receptors
On a storm site, cutting should not begin until all risks have been assessed & the
__________ approach has been decided & adopted.
safest
Actively __________ can facilitate understanding a customer's perceptions and
demonstrate the utility representative's sincere interest in a customer.
listening
As clearance work progresses, __________ between crews & dispatcher is
critically important to determine locations of downed or damaged lines.
communication
__________ negotiation uses the best aspects from both hard & soft bargaining.
interest-based
,An energized wire or conductor in a circuit is also known as a __________.
phase
Fast-growing, problem species are sometimes known as __________ __________.
cycle busters
Flush cuts damage which tissues?
the trunk
Clearing for a new distribution line is likely to be paid for by a __________ budget.
capital
Surface temperatures at the point of contact with high voltage can reach
__________ degrees F.
1,000
__________ __________ occurs when someone touches an energized fixture.
__________ __________ can occur when a person touches a conductive object
that is in contact with an energized fixture.
direct contact;
indirect contact
A grid-based scheduling system is most likely to be used by highly __________
utilities.
urbanized
Why is utility pruning done?
to maintain safety and rights-of-way
Reactive maintenance is often called __________.
hotspotting
True or False?
Guy wires are intended to help support poles but may become unintentionally
energized.
true
One of the highest personal risks in a storm is __________.
fatigue
When trying to negotiate mutually agreeable solutions & gain commitment based
on customer interests, the focus should be on __________, no on specific
individuals.
issues
A __________ is similar to a fuse or cutout, but it resets after a predetermined
time period.
re-closer
Always consider that all lines are __________.
energized
Tree replacement programs are an important aspect of many utility customer
relations programs & focus on selecting:
the right tree for the right place
If a structurally weak tree were on or close to the utility right-of-way, __________
__________ & __________ would be considered targets.
utility lines & equipment
A challenge with grid-based scheduling is that circuits may traverse many grids,
allowing for a variety of __________ __________.
, tree conditions
The difference in voltage between two objects someone simultaneously touches:
touch potential
Which type of pruning encourages the growth of branches away from the wires?
directional pruning
Minimum working distances for qualified line-clearance arborists are specified in
the __________ safety standard.
ANSI Z133
The sound of a running home generator should alert crews to the possibility of
__________.
backfeed
Measuring customer satisfaction by the number of __________ received is a very
reactive approach to customer relations.
complaints
Ideally, TGRs should be applied when a tree is actively growing & __________-
__________ months before pruning takes place.
2-3
What is the maximum amount of foliage that should be removed in one growing
season?
25%
(this is according to ANSI A300)
The most expensive way to schedule work is:
hotspotting
__________ __________ is the difference in voltage on the ground between two of
a person's body parts near where electricity goes into the ground.
step potential
A energized human body, tree, or climbing rope are all examples or __________
contact
indirect
A contractor is paid for each tree pruned or removed when contracted using a
__________ __________ contract.
unit price
When is it acceptable to deviate from the pruning standards?
during storm restoration
Besides pruning, __________ & __________ treatments are often part of an
integrated vegetation management program.
mechanical & herbicide
When installing underground conductors, __________ should be used in tree root
protection zones.
tunneling
Crew members should always refer customer relations questions about the
status of power restoration to:
the utility
The __________ has been adopted by most states & regulatory bodies throughout
the U.S. as the recognized document providing safety provisions for those
working with or near electric supply equipment.