Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SCMG 202 Module 3 Exam, Part II Complete With Answers

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
14-07-2023
Written in
2022/2023

SCMG 202 Module 3 Exam, Part II Complete With Answers.1) Which is true about the Work Breakdown Structure (WBS)? The WBS cannot be used by contract personnel. The WBS is a tool that can help identify and assess technical risk. The WBS can be used to track key performance parameters against projected values as a system evolves over time. The WBS can be used to track contractor performance in terms of only cost against an established baseline. 2) As part of the life cycle product support and system engineering processes, ____________ is used to influence design and determine the most cost effective way to support the system. Technical Performance Measures Earned Value Management Product Support Analyses Parametric Cost Estimating 3) One of the benefits of using redundant back-up systems is: Increased transportability Increased number of parts Increased reliability Increased size and weight 4) When applying the systems engineering process to determine

Show more Read less
Institution
Course

Content preview

SCMG 202 Module 3 Exam, Part II
1) Which is true about the Work Breakdown Structure (WBS)?
10144431 1

The WBS cannot be used by contract personnel.


The WBS is a tool that can help identify and assess technical risk.


The WBS can be used to track key performance parameters against

projected values as a system evolves over time.
The WBS can be used to track contractor performance in terms of only cost against an

established baseline.

2) As part of the life cycle product support and system engineering
processes, ____________ is used to influence design and determine the most
cost effective way to support the system.
10144476 1

Technical Performance Measures


Earned Value Management


Product Support Analyses


Parametric Cost Estimating


3) One of the benefits of using redundant back-up systems
is:
10144438 1

Increased transportability


Increased number of parts


Increased reliability


Increased size and weight


4) When applying the systems engineering process to determine

, the optimal design solution, the impact on both immediate costs and life
cycle costs needs to be considered, with the greatest weight placed on
immediate costs.
10144465 2

True


False


5) Tracking Technical Performance Measures on high-risk
components should provide:
10144434 1

Detailed program cost and schedule data


A product and process oriented framework for the Work Breakdown Structure



A baseline for preparing the technical Statement of Work Early


warning signs of potential performance problems


6) In our decision matrix, Option 1 receives a "3" for speed and a "1" for cost,
and Option 2 receives a "2" for speed and a "2" for cost. The speed criterion
has been assigned a weight of 0.4 and the cost criterion has been assigned a
weight of 0.6. In accordance with the decision matrix approach, which of the
following statements is true?

10144471 1

Option 2 is better than Option 1 because its total weighted score is higher. Option 1 and

Option 2 each score a total of 1.8; therefore, either choice is

fine.
Option 1 is better than Option 2 because its total weighted score is higher.


Option 1 is better than Option 2 because its total weighted score is lower.


7) In accordance with DoD acquisition policy and guidance, every program
should consider, at a minimum, open systems architecture, human systems
integration, _________________________.
10144459 1

Written for

Institution
Course

Document information

Uploaded on
July 14, 2023
Number of pages
10
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyConnect Liberty University
Follow You need to be logged in order to follow users or courses
Sold
266
Member since
5 year
Number of followers
232
Documents
1719
Last sold
2 months ago
Study Connect

Latest Exams, Notes, Practice Tests And All Latest Study Materials to help You Pass your Exams

3.5

40 reviews

5
15
4
7
3
9
2
0
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions