1) A producible design is the output of the systems engineering process
which drives manufacturing.
10144530 2
True
False
2) The Navy awards a Cost-Plus-Award-Fee (CPAF) contract for $265
million to design and develop electronic components for a communications
system with a period of performance of 18 months. What reports, if any,
must the Navy Program Manager (PM) require the contractor to provide
regarding their cost, schedule, and technical performance?
10144493 1
The contractor would submit an Integrated Program Management Report
(IPMR) with formats 1 through 5 only.
The contractor would submit an Integrated Program Management Report
(IPMR) with format 1 only.
The contractor would submit an Integrated Program Management Report
(IPMR) formats 1 through 7.
The contractor would not be required to submit any earned value related
reports to the Program Management Office.
The contractor would submit either an Integrated Program Management
Report (IPMR) with formats 1 through 5 or an Integrated Program Management Report with
format 6, but not both.
3) Program Managers can use data from the Integrated Program
Management Report (IPMR), including the Performance Measurement
Baseline (PMB) to integrate _____________ and
_____________ performance data with objective technical measures of
performance.
10144537 1
, Cost / schedule
Reliability / availability
Producibility / sustainability
Maintainability / supportability
4) When designing software, DoD policy focuses on creating
integrated architectures which include the operational architecture,
systems architecture, and ________________.
10144540 1
Subsystems architecture
Functional architecture
Mechanical architecture
Technical architecture
5) The Integrated Program Management Report has seven formats. Which
one of the formats reports current and cumulative performance element data
broken out by Contract WBS?
10144487 1
Format 4
Format 3
Format 5
Format 1
Format 2
6) The Resource Management Decision (RMD) is used to adjust the
_________, which translates programming decisions into budgeting
decisions.
10144478 1
Budget Estimate Submission (BES)