contains 19 Questions
1) Your new-start program was approved in this year's Authorization Bill and you are
currently operating under Continuing Resolution Authority. To avoid losing a top
engineer from your program, you authorize the Contractor to begin work since you
expect the Appropriation Bill to be signed next week. You are now in conflict with the
__________. [Select the appropriate public law (i.e., Misappropriation Act, Anti-Deficiency Act,
Bona Fide Need) that applies to the use of appropriated funds under specific circumstances.]
Anti-Deficiency
Act
Misappropriation
Act
Reprogramming
Thresholds
Defense Authorization
Bill
2) The Army can transfer excess funds from a Procurement appropriation to a Research,
Development, Test, and Evaluation (RDT&E) appropriation to cover a funding shortfall of
$3 million without prior approval of Congress.
[Given a funding shortfall, apply the rules governing reprogramming of appropriated funds in
each appropriation category to resolve the problem.]
True
Fals
e
, 3) Match each System Product Lifecycle element to the appropriate software configuration
management baseline. [Relate the different types of program unique
specifications to their appropriate configuration baselines and technical review requirements.]
[Remediation Accessed :N]
a System Requirements Analysis; Software Requirements
) Analysis
b Software Design; Interface Design; Database
) Design
c Software
)Coding
System Product
b Baseline
System Allocated
a Baseline
System Functional
c Baseline
4) What are some of the planning challenges that must be considered when taking
commercial items and modifying them for military use (Select all that apply)? [Identify the
impact on configuration management when commercial items are used in the system.]
Long-term logistics
support
Integratio
n
Management of government furnished
equipment
Availability of test ranges and
personnel
Maintain technical
data
5) Using pre-production systems, an Operational Assessment can reduce program risk
by _____________________. [Identify the role of Early Operational Assessment (EOA) and
Operational Assessment (OA) in reducing program risk.]
Providing operational effectiveness and
suitability data
Supporting the decision to begin full rate
production (FRP)