Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

INF3708-Assignment3- QUESTIONS AND ANSWERS-UNISA-()

Beoordeling
-
Verkocht
-
Pagina's
12
Cijfer
A+
Geüpload op
17-07-2023
Geschreven in
2022/2023

INF3708-Assignment3- QUESTIONS AND ANSWERS-UNISA-()

Instelling
Vak

Voorbeeld van de inhoud

INF3708

Software Project Management



Assignment: 3

(UNIQUE NUMBER: 899328)




Question 1

Question 1.1

, The project schedule management is also called project time management. It refers to
the progress of the work in each stage and the final completion of the project during the
project implementation process. Project schedule management is one of the important
measures to ensure the project is completed on time and rationally arrange the supply
of resources and save engineering costs.

Any IT or software project's success is heavily dependent on the project schedule
management which will result in the project objectives to be accomplished within the
allocated time. A properly designed and managed project schedule also contributes to
lowering the project's risk. Below are steps that can help to develop a project schedule
management:

I. Define Activities
A process of identifying and documenting the specific actions to be performed to
produce the project deliverables. Project managers use the Work Breakdown Structure
and a deliverables diagram to establish and start the tasks that are essential to finish on
time.

II. Sequence Activities
It is the process of identifying and documenting relationships among the project
activities. Sequence activities helps to identify a logical sequence of work, which in turn
helps the project team to work efficiently.

III. Do Estimates
The project manager has to analyze the information to be able to predict the time, cost,
and resources that is needed to complete a project. The project schedule helps to
calculate all the estimations of the project and determine what it will take for a project to
be completed.

IV. Determine Dependencies
Dependency in a project is the relationship between the tasks. It is when a task cannot
be started until the other task or process is completed. The project manager will need to
make sure that the schedule reflect the relationship between the tasks and make sure it
is included in the project plan.

V. Assign Resources
The project manager need to allocate required resource to tasks to complete the tasks,
the resource with the correct skill must be allocated. When doing resource allocation,
the project manager must know the availability of resources and schedule them to
coincide with the project timeline.

REFERENCES:
P Sanghera - PMP® in Depth, 2019 – Springer, Planning for Project Schedule
Management.
W Wei, ME Rana, 2019, Software Project Schedule Management Using Machine
Learning & Data Mining.

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 juli 2023
Aantal pagina's
12
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$5.69
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
yerisamson

Maak kennis met de verkoper

Seller avatar
yerisamson South University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
2 jaar
Aantal volgers
1
Documenten
92
Laatst verkocht
1 jaar geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen