1) The Test and Evaluation Master Plan (TEMP) links together, and must be
consistent with, which of the following related program documents (Select all that
apply)? [Recognize how the Test and Evaluation Master Plan (TEMP)
generation, staffing and approval process integrates all functional disciplines throughout the
acquisition life cycle.] [Remediation Accessed :N]
Systems Engineering Management Plan
(SEMP)
Systems Threat Assessment
(STA)
Acquisition Program Baseline
(APB)
Initial Capabilities Document
(ICD)
2) Which one of the following organizations would evaluate measures of
effectiveness (MOEs) to determine how well a munitions system can perform its
mission? [Identify the key T&E support organizations within DoD.]
Marine Corps Operational Test and Evaluation Activity
(MCOTEA)
Marine Corps Systems Command
(MARCORSYSCOM)
Defense Contract Management Agency
(DCMA)
, Joint Interoperability Test Command
(JITC)
3) If the program is on the DOT&E Oversight List, which one of the following test and
evaluation (T&E) products is required before the Full Rate Production Decision Review?
[Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]
DOT&E Report on Initial Operational Test and Evaluation
(IOT&E)
Live Fire T&E
Waiver
LRIP Article Quantities
Approval
Early Operational
Assessment
4) The operational effectiveness and operational suitability questions that must be
addressed during Operational Test and Evaluation (OT&E) to assess the system's
capability to perform its mission are called ___________. [Identify the primary Test and
Evaluation (T&E) products required at each acquisition milestone.]
Critical Operational Issues
(COI)
Critical Technical Parameters
(CTP)
Measures of Performance
(MOP)
Key Performance Parameters
(KPP)
5) Joint Interoperability Test Command (JITC) has primary responsibility for
developmental test and evaluation (T&E) functions throughout DoD. [Identify the
requirements for interoperability testing.]
Fals
e
True