Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Stationary Engineer Exam Study Guide | 2023 | 630 Questions with 100% Correct Answers | Updated & Verified | 74 Pages

Beoordeling
5.0
(1)
Verkocht
3
Pagina's
74
Cijfer
A+
Geüpload op
04-08-2023
Geschreven in
2023/2024

How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - 7 feet On a gas fired boiler what is the proper gas to air mixture - 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - TH=(Ca x 2.5) + (Mg x 4.1)nTH=(60 x 2.5) + (18 x 4.1)nTH= 150+73.8 =( 223.8 PPM) How often should a complete external inspection of the boiler be done? - Once a Shift With 24 hr operation how often do you check the water level? - Once per shift How often do you check the LWCO? - Once per shift How often do you check the High Limit Switch? - Annually

Meer zien Lees minder
Instelling
Stationary Engineer
Vak
Stationary Engineer

Voorbeeld van de inhoud

Stationary Engineer Exam Study Guide How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - ✔✔7 feet On a gas fired boiler what is the proper gas to air mixture - ✔✔30%-70% and in special arrangements it can be as high as 100% . AN SWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - ✔✔TH=(Ca x 2.5) + (Mg x 4.1)\nTH=(60 x 2.5) + (18 x 4.1) \nTH= 150+73.8 =( 22 3.8 PPM) How often should a complete external inspection of the boiler be done? - ✔✔Once a Shift With 24 hr operation how often do you check the water level? - ✔✔Once per shift How often do you check the LWCO? - ✔✔Once per shift How often do you check the High Limit Switch? - ✔✔Annually A 2" pipe was found to be delivering water at 100 psia at 1040ft per second. How many gallons per hour will it deliver? - ✔✔GPM= V (diameter squared) divided by .4085 ANSWER pg 469 BOG What contr ols the amount of blowback on a safety valve? - ✔✔Blowback ring or adjusting ring On a open air expansion tank hot water boiler system; how high should it be mounted? - ✔✔(4 Feet ) above the highest heating element. What is the minimum top clearance of b oilers with manholes? - ✔✔5 feet Package boilers; steam heating boilers and hot water heating boilers shall have a minimum clearance of? - ✔✔2 feet from ceiling. Code chapter 10 page76 Most important safety device on a boiler? - ✔✔Safety relief valve What does a Black Liquor Boiler do? - ✔✔Black Liquor is the by product of wood pulp processing in the paper making industry. What does Black liquor boiler known for? - ✔✔Steam generation and recovery of soda ash Maximum line voltage for control on a boiler ? - ✔✔150 volts Under what code are boilers designed and constructed? - ✔✔ASME - CSD 1 How many low water cut offs are needed per code for a hot water system when a boiler has inputs greater than 400,000 btu per hr - ✔✔1 LWCO is needed. What is the minim um and maximum size for a safety valve per code for boilers? - ✔✔Minimum 3/4" and Maximum 4 1/2" What stamp is put on a boiler after repairs? - ✔✔"R" What is the equalizing system used for? - ✔✔The equalizing system is for warming up the steam lead. A blowdown valve is located at the lowest water space of a boiler for three purposes - ✔✔1. to remove precipitated sludge or loose scale \n2. To permit rapid lowering of the boiler water if it has become too high accidentally \n3. As a means of removing wa ter from the boiler so that fresh water may be added to keep the concentration of solids below the point where difficulties may be experienced. In the old power boiler which type of feed -water regulators were not used? - ✔✔Electronic After opening a boil er for repairs how much oxygen is needed? - ✔✔19% What is the first thing you do when shutting down a boiler? - ✔✔Turn off (extinguish fire) What is the legal limit of acceptable asbestos particles ? - ✔✔0.1 fibers per cubic centimeter What is CREEP? - ✔✔Creep is defined as the slow deformation of material with time; with the deformation taking place at elevated temperatures with no increase in stress. What is the BTU content of Anthracite coal? - ✔✔14000 btu/lb What substance transfers electrical curr ent in a photocell? - ✔✔Electricity will flow when the CADMIUM is exposed to sufficient light. What device acts as a check valve in both directions and keeps pumps primed? - ✔✔FOOT VALVES are used for pumps under suction pressure to prevent backflow prime d? on the suction line. What protects boilers from explosion in the furnace? - ✔✔A flame guard system is an arrangement of flame detection system; interlocks; and relays which will sense the presence of a proper flame in a furnace and cause fuel to be shu t off to the furnace if a hazardous condition develops (improper flame or combustion).

Geschreven voor

Instelling
Stationary Engineer
Vak
Stationary Engineer

Documentinformatie

Geüpload op
4 augustus 2023
Aantal pagina's
74
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$24.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
2 weken geleden

5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Preach Western Governors University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
666
Lid sinds
2 jaar
Aantal volgers
422
Documenten
12493
Laatst verkocht
6 dagen geleden
ONLINE BEST EXAM AND ANSWERS SELLER

DOWNLOAD THE LASTEST UPDATED PAPERS TO BOOST YOUR GRADES 100%

3.9

115 beoordelingen

5
55
4
23
3
17
2
5
1
15

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen