and Answers 2023 with complete solution
The portion of total risk that remains after unacceptable risk has been determined
is ________.
Residual
An opposing force, condition, source, or circumstance with the potential to
negatively impact your mission and/or degrade the mission capability is a
__________.
Hazard
Risk to forces is the risk that could potentially damage or injure our forces
(equipment and personnel).
True
Individual units may keep files of their own tailored TRACS Assessments in a
secure place other than on the TRACS website.
True
__________ is the estimate of the likelihood that a hazard will cause an impact on
an operation.
Probability
Residual risk is the risk remaining after controls have been identified, selected,
and implemented for the hazard.
True
TRACS stands for _________.
Total Risk Assessment and Control System
PPE falls into the category of _________ controls.
Physical
Supervisors need only concern themselves with attaining good ORM
communication with their subordinates, not what comes down from the upper
chain-of-command.
False
In regards to the Supervise step of ORM, which is NOT an aspect?
Provide support
Which is NOT a level of ORM?
Planned
The overall goal of ORM is to completely eliminate risk from planned operational
evolutions.
False
__________ controls are based on the knowledge and skills of the units and
individuals.
Educational