BICSI Exam Review Questions and
answers, 100% Accurate, rated A+
1 Trillionth (10 ' 12) cycles - ✔✔-1 picohertz (pHz)
1 Billionth (10'9) cycles - ✔✔-1 nanohertz (nHz)
1 millionth (10'6) cycles - ✔✔-1 microhertz
1 thousand (10'6) cycles - ✔✔-1 milliheartz
1 cycle - ✔✔-1 HZ
V%R - ✔✔-What is the formula to find I when the values of V and R are known
Crosstalk - ✔✔-Is decreased by pairs twists, cable lay, shielding, and physical pair separation. Its values
are typically a negative decibel value. closer to 0 more problems.
class 3/ 16 MHz - ✔✔-Category 3 is what class and frequency
class D/ 100 - ✔✔-MHzCategory 5e is what class and frequency
Class E/250 - ✔✔-Category 6 is what class and frequency
Class E/500 MHz - ✔✔-Category 6 A is what class and what frequency.
568.0 - ✔✔-Generic telcomuninications cabling for customer premesis.
, 568.0 - ✔✔-serves as the foundation for premises telecommunications cables infrastructure, enables
the planning and installation of a structured cabling system for all types of customer premises.
intermediate cross connect - ✔✔-(IC) The connection point between a backbone cable that extends
from the main cross connect (MC campus distributor (CD) first level backbone) and the backbone cable
from the horizontal cross connect (HC floor distributor (FD) second level backbone).
LAN - ✔✔-Local Area Network
EF - ✔✔-Entrance Facility
ER - ✔✔-Equipment room
HC - ✔✔-Horizontal cross connect
MC - ✔✔-Main cross connect
work area - ✔✔-A building space where te occupants interact with telecommunications terminal
equipment (an individual office or cubicle, printer/copier room.
Equipment room (ER) - ✔✔-Generally houses equipment that serves an entire, building, campus or
customer.
Telecommunications room (TR) - ✔✔-An enclosed architectural space for housing telecommunications
equipment, cable, terminations, and cross connect cabling.
Entrance Facility (EF) - ✔✔-The telecommunications service entrance to the building, including the
entrance through the building envelope (exterior wall, ground level slab or roof) into the building
interior and continuing to the entrance room.
answers, 100% Accurate, rated A+
1 Trillionth (10 ' 12) cycles - ✔✔-1 picohertz (pHz)
1 Billionth (10'9) cycles - ✔✔-1 nanohertz (nHz)
1 millionth (10'6) cycles - ✔✔-1 microhertz
1 thousand (10'6) cycles - ✔✔-1 milliheartz
1 cycle - ✔✔-1 HZ
V%R - ✔✔-What is the formula to find I when the values of V and R are known
Crosstalk - ✔✔-Is decreased by pairs twists, cable lay, shielding, and physical pair separation. Its values
are typically a negative decibel value. closer to 0 more problems.
class 3/ 16 MHz - ✔✔-Category 3 is what class and frequency
class D/ 100 - ✔✔-MHzCategory 5e is what class and frequency
Class E/250 - ✔✔-Category 6 is what class and frequency
Class E/500 MHz - ✔✔-Category 6 A is what class and what frequency.
568.0 - ✔✔-Generic telcomuninications cabling for customer premesis.
, 568.0 - ✔✔-serves as the foundation for premises telecommunications cables infrastructure, enables
the planning and installation of a structured cabling system for all types of customer premises.
intermediate cross connect - ✔✔-(IC) The connection point between a backbone cable that extends
from the main cross connect (MC campus distributor (CD) first level backbone) and the backbone cable
from the horizontal cross connect (HC floor distributor (FD) second level backbone).
LAN - ✔✔-Local Area Network
EF - ✔✔-Entrance Facility
ER - ✔✔-Equipment room
HC - ✔✔-Horizontal cross connect
MC - ✔✔-Main cross connect
work area - ✔✔-A building space where te occupants interact with telecommunications terminal
equipment (an individual office or cubicle, printer/copier room.
Equipment room (ER) - ✔✔-Generally houses equipment that serves an entire, building, campus or
customer.
Telecommunications room (TR) - ✔✔-An enclosed architectural space for housing telecommunications
equipment, cable, terminations, and cross connect cabling.
Entrance Facility (EF) - ✔✔-The telecommunications service entrance to the building, including the
entrance through the building envelope (exterior wall, ground level slab or roof) into the building
interior and continuing to the entrance room.