WGU C720 PA QUESTIONS AND ANSWERS ALREADY PASSED
A company that produces motors uses the following check sheet: Why would the company use this check sheet? To create a control chart to measure the engine assembly process To create a flow chart of the engine assembly process To develop a suppliers, inputs, process, outputs, customers (SIPOC) diagram To develop a Pareto chart identifying the root causes of engine defects To develop a Pareto chart identifying the root causes of engine defects Which aspect of quality is demonstrated by a vehicle that has a useful life of 165,000 miles? Performance Reliability Features Durability Durability A quality improvement team is trying to illustrate to upper management how a process is varying over time as measurements are collected. Which two statistical process control (SPC) tools should the team use? Choose 2 answers Cause-and-effect diagrams Scatter diagrams Histograms Run chartsCheck sheets Pareto charts Control charts Control charts Run charts The CEO of a service company wants to change the strategy of the company from volume sales to high-quality products. Which philosophy should the CEO implement to emphasize quality over volume? Shewhart's variation reduction Deming's 14 points Ohno and Shingo's kaizen Taguchi's loss function Deming's 14 points A company sells garage doors through a national retailer and contracts with local installers to complete the installations. The operations manager is responsible for completing the installations in a 14-day period after the sale. The company will be penalized financially if it fails to achieve these objectives. The operations manager's daily responsibilities include contacting installers to expedite orders and ensure deadlines are met.
Geschreven voor
- Instelling
- WGU C720 PA
- Vak
- WGU C720 PA
Documentinformatie
- Geüpload op
- 26 augustus 2023
- Aantal pagina's
- 26
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
wgu c720 pa questions and answers already passed