ARE 5.0 - PJM - Project Execution 2023 Guide with complete solution Best approach to meeting client expectations for construction budgets carefully monitor the relationship between scope, quality, and cost as a design is being developed When a conflict, sit with the client and review and adjust one or more of the project parameters of quality, time, and cost before proceeding to the next step in the design process To stay on top of issue, budget compliance & adjustment problems added to mtg agendas and discussed regularly w client and proj team Challenges of managing consultants that PM must allot time and resources for Consultant coordination 1. Reaching finish line at the same time and avoiding disruption when docs are issued 2. Making sure all parties using same versions of plan backgrounds 3. Uncovering and coordinating conflicts bet work of diff disciplines Quality management responsibilities of PM PM to manage and control project's quality level Must be a daily concern Redlines Helping w specs and dwgs Most of all, know the status of work at all times Oversee and direct quality management controls as they are performed PM responsibilities for Document Reviews

Show more Read less
Institution
Course

Content preview

ARE 5.0 - PJM - Project Execution 2023 Guide with
complete solution
Best approach to meeting client expectations for construction budgets
carefully monitor the relationship between scope, quality, and cost as a design is being
developed
When a conflict, sit with the client and review and adjust one or more of the project
parameters of quality, time, and cost before proceeding to the next step in the design
process
To stay on top of issue, budget compliance & adjustment problems added to mtg
agendas and discussed regularly w client and proj team
Challenges of managing consultants that PM must allot time and resources for
Consultant coordination
1. Reaching finish line at the same time and avoiding disruption when docs are issued
2. Making sure all parties using same versions of plan backgrounds
3. Uncovering and coordinating conflicts bet work of diff disciplines
Quality management responsibilities of PM
PM to manage and control project's quality level
Must be a daily concern
Redlines
Helping w specs and dwgs
Most of all, know the status of work at all times
Oversee and direct quality management controls as they are performed
PM responsibilities for Document Reviews
Doc reviews as opportunity to find uncover mistakes before they create problems during
construction
Schedule time/resources for internal reviews of CDs before bidding
Reviewer could be PM, leader from another proj, or spec writer
External reviews also helpful and should be welcomed (engineers, consultants, owners,
constractors, agencies that give permits.)
Managing expectations of client tips
Help client set expectations
Have frank discussion of potentially tough issues
Use technique of creative conflict (process of engaging in debate to be able to recall
issues later on to gain concensus. Do this when change is requested, not after. Even is
architect overruled, owner will remember concerns were expressed)
Dont use jargon that is "undefined" or absolute by client or might be setting unreslistic
expectations ("our docs are %100 complete)
Suitable alternative for
"We look forward to designing a first-class new school for you."

"100% Complete Construction Documents"

"50% Schematic Design Set"

,The masonry walls have been completed."
We look forward to designing your new school project.

Issued for Construction"

"Interim Schematic Review Set"

"The masonry walls appear complete."
Explaining consequences as a responsibility of PM
For example, if a client decides to eliminate waterproofing on the basement walls, it is
not enough for the architect to simply disagree with the decision. The project manager
should go a step further and explain that the decision could result in water leaking into
the basement, causing damaged finishes and expensive repair costs. While such
consequences may seem obvious to the experienced project manager, they might not
be so obvious to the owner.

Client wanting to save money on building system. Architect to explain increase of cost
of building maintenance
Monitoring tips for PM
Most projects require a montly evaluation
Monitoring terms
Net service revenue
Planned cost
Job-to-date
Estimate-to-complete
Estimate-at-completion
Planned estimate at completion
Percent complete
Multipliers (break even, overhead, effective multiplier, target, planned multiplier,
estimate at completion multiplier)
Billed/invoiced amounts
Earned revenue amounts
Billed-not-earned
Earned-not-billed
Net service revenue
Net fee determined by subtracting consultant fees from the gross fee for the project
Planned cost:
Labor hours and dollar amounts planned at project initiation
Job-to-date (JTD):
Labor hours and dollar amounts spent as of current date
Estimate-to-complete (ETC):
Labor hours and dollar amounts estimated from current date to project completion
Estimate-at-completion (EAC):
JTD plus ETC labor hours and dollar amounts estimated at project completion
Planned estimate at completion:

, Over/under calculation indicating labor hours and dollar amounts at project completion
relative to planned estimates
Percent complete:
Current work in place for the project, phase, or task, expressed as a subjective percent
complete and not based on the percentage of labor hours or dollar amounts spent
Break-even:
(direct labor + overhead)/direct labor
Overhead:
overhead/direct labor
Effective multiplier:
current, subjective percent complete/direct labor
Target:
firm-wide standard target multiplier, including profit target
Planned multiplier:
net service revenue or compensation/planned cost

1,025,000/334,778= 3.06
Estimate-at-completion (EAC) multiplier:
Total NSR/EAC labor dollars
Single most important factor used in project tracking and monitoring; it must be
done honestly, accurately, and regularly to achieve project success.
Estimate-to-complete
Billed/invoiced amounts:
Amounts billed to clients based on contract compensation amounts and percent
complete
Earned revenue amounts:
Revenue recognized in the accrual accounting system based on subjective percent
complete times net service revenue
Billed-not-earned (BNE):
Amounts billed to the client but not recognized as earned revenue in the accrual
accounting system
Earned-not-billed (ENB):
Amounts recognized as earned revenue in the accrual accounting system but not billed
to the client
The simplest and quickest means to see where the project is now, where it is
projected to be at the end of the project, and what needs to be adjusted to bring
the project back within budget.
The effective multiplier and EAC multiplier

Estimate at completion multiplier: total NSR/EAC(estimate at completion) labor dollars

EAC: Job to date plus Estimate to complete labor hrs and dollar amounts estimated at
project completion

Effective multiplier: current, subjective percent complete/direct labor

Written for

Course

Document information

Uploaded on
September 7, 2023
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICAIDSTORE Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
1211
Member since
4 year
Number of followers
892
Documents
12012
Last sold
1 week ago
ACADEMICAID STORE

Welcome to ACADEMICAID store! We specialize in reliable test banks, exam questions with verified answers, practice exams, study guides, and complete exam review materials to help students pass on the first try. Our uploads support Nursing programs, professional certifications, business courses, accounting classes, and college-level exams. All documents are well-organized, accurate, exam-focused, and easy to follow, making them ideal for quizzes, midterms, finals, ATI & HESI prep, NCLEX-style practice, certification exams, and last-minute reviews. If you’re looking for trusted test banks, comprehensive exam prep, and time-saving study resources, you’re in the right place.

Read more Read less
4.1

176 reviews

5
98
4
29
3
28
2
6
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions