Industrial Storm Water Certified Operator Exam Questions With Correct Answers 2023/2024 | 100% Verified
Industrial Storm Water Certified Operator Exam Questions With Correct Answers 2023/2024 | 100% Verified. Organic enrichment of storm water runoff from sources such as food processing, airport deicing, antifreezes, and sewage create addition oxygen demand in lakes and streams. Much of the demand is due to bacteria feeding on these materials. The increased oxygen demand can lead to ____________________________________, which is a common cause of fish kills. - Correct Answer-Oxygen depletion 6) The addition of nitrogen and phosphorus to storm water runoff can result in algal blooms and excessive growth of aquatic plants in fresh water systems such as lakes and streams. In fresh water systems _____________________ is the main cause of excessive plant and algal growth. - Correct Answer-Phosphorus 7) Sediment is one of the most widespread pollutants in surface water. Many ___________________________ attach to finer sediment particles. Sediment can also be destructive to aquatic systems by covering and damaging habitat - Correct Answer-Pollutants 8) Michigan law requires that anyone who discharges liquid wastes to surface waters of the state must have their pollution control measures under the supervision of a - Correct Answer-Certified Operator 9) If there is a construction activity at an industrial facility that disturbs one or more acres of land or the soil disturbance is within 500 feet of a water body, the owner of the property will need to apply for a ___________________________ ___________________________________________ permit. In addition if the Industrial Storm Water Certified Operator Exam Questions With 100% Correct Answers 2023/2024 soil disturbance will become five or more acres in size the property owner will need to submit the Notice of Coverage application to the MDEQ, Water Resources Division. - Correct Answer-Soil Erosion and Sedimentation Control 10) __________________ permits are not site specific and contain the minimum requirements for protecting water quality. - Correct Answer-General 11) The ______________________________________ is a document that authorizes the discharge of storm water under a general storm water permit. - Correct Answer-Certificate of Coverage 12) __________________ permits are site specific and contain requirements such as regular sampling, monitoring, end of pipe treatment or effluent limits. - Correct Answer-Individual 13) There are two types of industrial storm water general permits in Michigan they are Storm Water from Industrial Activity and Storm Water with _________ ______________________________________. - Correct Answer-Required Monitoring or Special Use Areas 14) A facility that has the industrial storm water general permit with required monitoring or special use areas is required to conduct a - Correct Answer-Short Term Storm Water Characterization Study 15) An annual fee will be assessed to all facilities that have permitted storm water discharges. All facilities that have authorization to discharge storm water on _________________________ will be responsible for the annual fee. - Correct Answer-January 1 16) Industrial facilities are identified in the federal storm water regulations by _________________________________________ and narrative description - Correct Answer-Standard Industrial Classification (SIC) Code 17) The surface water that receives the point source discharge is called the ________________________________. This information must be included on the Notice of Intent (NOI) application when applying for the storm water discharge coverage - Correct Answer-Receiving Waters 18) Surface waters of the state include __________________, ____________, ________________, and ___________________________. - Correct Answer-Rivers Lakes Streams Wetlands 19) A ___________________________________ is any discernible, confined, and discrete conveyance that discharges storm water into surface waters. Examples include, but are not limited to, pipes, ditches, channels, tunnels, conduits, conduits, or anything that conveys storm water into surface waters. - Correct Answer-Point Source Discharge 20) A discharge point that directs waste water, including storm water to a storm sewer is called a/an _________________________. - Correct Answer-Point of Discharge 21) A discharge point that directs waste water, including storm water to surface waters of the state is called a/an ___________________________ _____________________. - Correct Answer-Outfall 22) A sewer system in which the storm water is kept separate from sanitary sewage and discharges directly into a surface water body is called a ________ _____________________________________________. - Correct Answer-Separate Storm Sewer System 23) A sewer system in which the sanitary sewage and the storm water are combined and are directed to a wastewater treatment plant is called a _______ _____________________________________________. - Correct Answer-Combined Sewer System 24) For industrial facilities that are regulated by the federal regulations and there is a point source discharge, but there is no exposure of industrial materials, the no exposure certification must be submitted every __________ in MiWaters - Correct Answer-5 years 25) The application for storm water permit coverage must be signed by the __________________________________________________________ - Correct Answer-Principal executive officer or designee 26) ___________________________ is a state-of-the-art, comprehensive, web-based permitting and compliance database. - Correct Answer-MiWaters 27) The focus of MiWaters is ________________ and _________________. - Correct Answer-Permitting and compliance 28) List the 5 Notice of Intent (NOI) requirements that are certified by the signature on the Notice of Intent. 1. 2. 3. 4. 5. - Correct Answer-A Storm Water Pollution Prevention Plan (SWPPP) has been developed for the facility. The facility has an industrial storm water certified operator. There are no unauthorized discharges from the facility. Nonstructural Controls have been implemented. Structural Controls are in place or will be in place according to the dates in the SWPPP. 29) Certain types of forms and reports, particularly those administered under the federal NPDES program, require that the user submit a _____________________________ that must be approved by the department before these forms and reports can be submitted in MiWaters. - Correct AnswerCertifier Agreement Form 30) Existing facilities that are required to have industrial storm water permit coverage that do not have industrial storm water permit coverage are in violation. To resolve the violations the facility must enter into a ____________ _____________________________________________________. - Correct AnswerGeneral administrative consent order 31) The application for reissuance of industrial storm water permit coverage must be submitted _______________________ in MiWaters prior to the expiration of the Certificate of Coverage or individual NPDES permit. - Correct Answer-6 months 33) If the portable industrial facility is to be moved to another satellite location the permittee must notify the MDEQ of the relocation in writing, at least __________________ prior to start up at the new location. - Correct Answer-10 days 32) Portable industrial facilities also need to submit the ___________________ ____________________________ in MiWaters for permit coverage. - Correct AnswerNotice of Intent 34) The industrial storm water certified operator at the facility shall have _____________________________ over the facility's storm water treatment and control measures. - Correct Answer-Supervision 35) The comprehensive inspection can only be conducted by a/an __________ _______________________________________________. - Correct Answer-Industrial Storm Water Certified Operator 36) Only a/an _____________________________________________ may assess the storm water sample collected for conducting the visual assessment - Correct Answer-Industrial Storm Water Certified Operato 37) The Industrial Storm Water Certified Operator must be at the facility - Correct Answer-On a regular basis 38) The SWPPP must be reviewed and signed by the permittee and a/an - Correct Answer-Industrial Storm Water Certified Operator 39) To become certified a person must attend an Industrial Storm Water Certified Operator training class and submit the ________________ within 90 days of attending the training class. - Correct Answer-Certification fee 40) The Industrial Storm Water Certified Operator certification is valid for __________ years. - Correct Answer-5 41) To renew certification the Industrial Storm Water Certified Operator must _________________________________________________________ and _________________________________________________________ by August 31 of the year their certification expires. - Correct Answer-Attend a recert class and Pay the recertification fee 42) The MDEQ may revoke the certificate of a person who has practiced fraud or_______________________ or been negligent in discharge of his/her duties - Correct Answer-Falsification
Geschreven voor
- Instelling
- Industrial Storm Water Certified Operator
- Vak
- Industrial Storm Water Certified Operator
Documentinformatie
- Geüpload op
- 25 september 2023
- Aantal pagina's
- 13
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
verified answers
-
2023
-
2024
-
industrial storm water certified operator
-
storm water certified operator
-
industrial storm water certified operator exam
-
exam questions with correct answers