NFPA 24 Test (TFM10) Well Answered Questions!
Combined Service Mains
This standard shall apply to ______ intended to carry water for fire service mains
AHJ
Working plans shall be submitted for approval to the _____ before any equipment is installed or
remodeled.
Pressure-Regulating devices
____ shall not be used
Control Valves
______ shall not be installed in the piping from the fire department connection to the fire
service main
Control Valves
, _____ shall be permitted in the system downstream of the fire department connection
Check Valve
When more than one water supply exists, a ___________ shall be installed in each connection
Control Valve
All check valves shall have a ________ installed upstream and downstream of the check valve.
40 ft
A post indicator valve installed not less than____ from the building
32-40 inches
Where post indicator valves are used, they shall be set so that the top of each post is _______
above final grade
not be required
Supervision of underground gate valves with roadway boxes shall ____________
Combined Service Mains
This standard shall apply to ______ intended to carry water for fire service mains
AHJ
Working plans shall be submitted for approval to the _____ before any equipment is installed or
remodeled.
Pressure-Regulating devices
____ shall not be used
Control Valves
______ shall not be installed in the piping from the fire department connection to the fire
service main
Control Valves
, _____ shall be permitted in the system downstream of the fire department connection
Check Valve
When more than one water supply exists, a ___________ shall be installed in each connection
Control Valve
All check valves shall have a ________ installed upstream and downstream of the check valve.
40 ft
A post indicator valve installed not less than____ from the building
32-40 inches
Where post indicator valves are used, they shall be set so that the top of each post is _______
above final grade
not be required
Supervision of underground gate valves with roadway boxes shall ____________