Pass
Exceptional Experience ✔✔Blend of content, technology and emvironment.
Allied Industries ✔✔Mep arch and structural
Program phase ✔✔Sales process - what the customer wants to accomplish
Design phase ✔✔Taking program and create a detailed design and schedule.
Install Phase ✔✔Install, documentation, labeling and adjusting
Verify and support Phase ✔✔Install complete, commissioning, training, support
JTA ✔✔Job, Task, Analysis broken down by CTS - duties and tasks defined: project phases prog
design install support and sub tasks (umbrellas)
, Needs analysis ✔✔End user needs, applications, tasks
ADM ✔✔analytical decision making
BDM ✔✔basic decision making
visual acuity ✔✔the ability to see fine detail 5minutes of arc
Basic decision making BDM ✔✔200 BDM acuity factor
contrast ratio for BDM ✔✔15:1 a group of pixels
ADM required drawings 3438 acuity factor ✔✔plan view and elevation
16:9 aspect ratio ✔✔9 divided by 16 or 1.78
Analytical Decision Making ADM ✔✔50:1 based on pixel